← Back
Five to six families
99 SEELEY STREET
BROOKLYN · BIN 3122010
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R5Zoning
3,600 sfGross Floor Area
5Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Five to six families · Owner of record: 99 SEELEY ASSOCIATES, LLC · 1,925 sf lot · 1.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof5p · 4 filings · 20 docs
Floor 32p · 2 filings · 16 docs
Floor 22p · 2 filings · 17 docs
Floor 1
Cellar4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
99 SEELEY ASSOCIATES, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEORGE SCHELL ENGINEERING812/18/2023
HORRIGAN O'MALLEY ARCHITECTS211/23/2022
STRATFORD ENGINEERING201/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA DESIGN GROUP2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAT MCCANN P&H INCPlumbing807/08/2026
AVID CONSTRUCTION INCGeneral Contractor707/08/2026
AUGUSTUS SOLLITTOElectrical103/21/2026
GERBINO, ANTHONYElectrical103/21/2026
JUANACIO, JOSEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678912/18/2023
STRATFORD ENGINEERING997201/27/2022
Building Lifecycle
All (78)Filed (12)Permit Issued (9)Signed Off (7)Violation (5)Inspection (3)Objection (12)Special Inspection (30)
02/05/2024
Signed off — Alteration
APPLICATION FILED FOR ADDITIONS/MODIFICATIONS TO MECHANICAL ON THE 2ND AND 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00512508-I1
01/22/2024
Signed off — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, FINISHES ON THE 2ND AND 3RD FLOOR. RELATED PLUMBING & MECHANICAL WORK FILED UNDER SEPARATE APPLICATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00512457-I1
12/28/2023
Special inspection requirement — Mechanical Systems
Ari Kamo
12/28/2023
Special inspection requirement — Maintenance information
Ari Kamo
12/28/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
12/28/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
12/28/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
12/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
12/28/2023
Special inspection requirement — Final
Ari Kamo
12/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
12/25/2023
Objection resolved — Addressed
12/21/2023
Objection raised — Other
12/18/2023
Filed — Alteration
APPLICATION FILED FOR ADDITIONS/MODIFICATIONS TO MECHANICAL ON THE 2ND AND 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00512508-P1
12/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
12/14/2023
Special inspection requirement — Mechanical Systems
Ari Kamo
12/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
12/14/2023
Special inspection requirement — Final
Ari Kamo
12/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
12/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
12/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
12/14/2023
Special inspection requirement — Maintenance information
Ari Kamo
11/20/2023
Violation issued (HPD, closed)
I
10/23/2023
Signed off — Alteration
B00512525-I1
10/23/2023
Signed off — Alteration
B00512536-I1
06/16/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/16/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2023
Violation issued (HPD, closed)
A
12/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
12/28/2022
Special inspection requirement — Final
CHRISTA HORRIGAN
12/28/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTA HORRIGAN
12/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTA HORRIGAN
12/28/2022
Special inspection requirement — Lighting controls
CHRISTA HORRIGAN
12/28/2022
Special inspection requirement — Maintenance information
CHRISTA HORRIGAN
12/28/2022
Special inspection requirement — Lighting in dwelling units
CHRISTA HORRIGAN
12/28/2022
Special inspection requirement — Interior lighting power
CHRISTA HORRIGAN
12/14/2022
Objection resolved — Addressed
12/09/2022
Objection raised — Scope
11/23/2022
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, FINISHES ON THE 2ND AND 3RD FLOOR. RELATED PLUMBING & MECHANICAL WORK FILED UNDER SEPARATE APPLICATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00512457-P1
11/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTA HORRIGAN
11/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
11/23/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTA HORRIGAN
11/23/2022
Special inspection requirement — Final
CHRISTA HORRIGAN
11/23/2022
Special inspection requirement — Lighting in dwelling units
CHRISTA HORRIGAN
11/23/2022
Special inspection requirement — Lighting controls
CHRISTA HORRIGAN
11/09/2022
Violation issued (HPD, closed)
I
07/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/11/2022
Permit issued — Plumbing
B00512525-I1-PL
04/01/2022
Permit issued — Structural
B00512536-I1-ST
03/08/2022
Permit issued — Mechanical Systems
B00512508-I1-MS
03/08/2022
Permit issued — General Construction
B00512457-I1-GC
02/15/2022
Filed — Alteration
APPLICATION FILED FOR ADDITIONS/MODIFICATIONS TO MECHANICAL ON THE 2ND AND 3RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00512508-I1
02/15/2022
Filed — Alteration
B00512525-I1
02/13/2022
Objection resolved — Addressed
02/13/2022
Objection resolved — Addressed
02/13/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Scope
02/01/2022
Objection raised — Energy
02/01/2022
Objection raised — Other
01/27/2022
Filed — Alteration
B00512536-I1
01/26/2022
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, FINISHES ON THE 2ND AND 3RD FLOOR. RELATED PLUMBING & MECHANICAL WORK FILED UNDER SEPARATE APPLICATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00512457-I1
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPAT MCCANN P&H INC04/11/2022
DOB NOWStructuralSigned-offAVID CONSTRUCTION INC04/01/2022
DOB NOWMechanical SystemsSigned-offAVID CONSTRUCTION INC03/08/2022
DOB NOWGeneral ConstructionSigned-offAVID CONSTRUCTION INC03/08/2022
DOB NOWPlumbingSigned-offPAT MCCANN P&H INC09/24/2021
DOB NOWMechanical SystemsSigned-offAVID CONSTRUCTION INC05/13/2021
DOB NOWPlumbingSigned-offPAT MCCANN P&H INC02/04/2021
DOB NOWPlumbingSigned-offPAT MCCANN P&H INC11/09/2020
DOB NOWStructuralSigned-offAVID CONSTRUCTION INC09/14/2020
BISOTISSUEDAVID CONSTRUCTION INC09/02/2020
2 projects · most recent 07/12/2023
General Wiring
FiledStatusContractorScope
07/12/2023CompleteLOADS ELECTRIC, INC.General Wiring
10/27/2020CompleteLOADS ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
12/28/2023Mechanical SystemsAri Kamospecial
12/28/2023Maintenance informationAri Kamoenergy_progress
12/28/2023HVAC-R and service water piping design and insulationAri Kamoenergy_progress
12/28/2023HVAC-R and service water heating equipmentAri Kamoenergy_progress
12/28/2023HVAC-R and service water heating system controlsAri Kamoenergy_progress
12/28/2023Energy Code Compliance InspectionsAri Kamoprogress
12/28/2023FinalAri Kamoprogress
12/28/2023Fire-Resistant Penetrations and JointsAri Kamospecial
12/14/2023Fire-Resistant Penetrations and JointsAri Kamospecial
12/14/2023Mechanical SystemsAri Kamospecial
12/14/2023Energy Code Compliance InspectionsAri Kamoprogress
12/14/2023FinalAri Kamoprogress
12/14/2023HVAC-R and service water heating system controlsAri Kamoenergy_progress
12/14/2023HVAC-R and service water heating equipmentAri Kamoenergy_progress
12/14/2023HVAC-R and service water piping design and insulationAri Kamoenergy_progress
12/14/2023Maintenance informationAri Kamoenergy_progress
12/28/2022Fire-Resistant Penetrations and JointsAri Kamospecial
12/28/2022FinalCHRISTA HORRIGANprogress
12/28/2022Energy Code Compliance InspectionsCHRISTA HORRIGANprogress
12/28/2022Fire-Resistance Rated ConstructionCHRISTA HORRIGANprogress
12/28/2022Lighting controlsCHRISTA HORRIGANenergy_progress
12/28/2022Maintenance informationCHRISTA HORRIGANenergy_progress
12/28/2022Lighting in dwelling unitsCHRISTA HORRIGANenergy_progress
12/28/2022Interior lighting powerCHRISTA HORRIGANenergy_progress
11/23/2022Fire-Resistance Rated ConstructionCHRISTA HORRIGANprogress
Latest 25 of 41.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch6
08/31/2026B00512536-I1Request digital key ↗
08/31/2026B00512508-I1Request digital key ↗
08/31/2026B00512525-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00299334-P1Request digital key ↗
09/02/2026B00299334-I1Request digital key ↗
08/15/2026B00299334-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00299355-I1Request digital key ↗
08/15/2026B00299355-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00299402-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/19/2021321999726Open ↗
10/17/2019321999726Open ↗
▸BISWORK PERMIT APPLICATION1
09/02/2020321999726Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature14
09/27/2026B00512508-P1Open ↗
09/27/2026B00512508-P1Open ↗
09/01/2026B00512508-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026B00512457-I1Open ↗
08/31/2026B00512457-P1Open ↗
08/31/2026B00512536-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/27/2026B00512508-P1Open ↗
09/01/2026B00512508-I1Open ↗
09/01/2026B00299355-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/17/2019321999726Open ↗
10/17/2019321999726Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/21/2021321999726Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/21/2021321999726Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan6
08/13/2026B00299334-I1Open ↗
08/13/2026B00299402-I1Open ↗
08/13/2026B00299334-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes1
10/17/2019321999726Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/31/2026B00512536-I1Open ↗
08/31/2026B00512508-I1Open ↗
08/31/2026B00512525-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/18/2020321999726Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/21/2021321999726Open ↗
09/02/2020321999726Open ↗
07/18/2020321999726Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00512457-I1Open ↗
08/13/2026B00512508-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/21/2021321999726Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/17/2019321999726Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/27/2021321999726Open ↗
12/21/2021321999726Open ↗
12/21/2021321999726Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/29/2021321999726Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
10/17/2019321999726Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/21/2021321999726Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
12/20/2021321999726Open ↗
11/23/2021321999726Open ↗
10/20/2021321999726Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
10/17/2019321999726Open ↗