Other miscellaneous
Bronx Theatre High School
1 TERRACE VIEW AVENUE · BIN 1064532
💬 Discuss this project
0Year Built
—Stories
Z9Building Class
R6Zoning
0 sfGross Floor Area
0Units
21 Open Violations 9 unresolved · 12 paperwork only ▸FISP: UNSAFE
Other miscellaneous · Owner of record: NYC DEPARTMENT OF EDUCATION · 654,361 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction23p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY3007/08/2026
DEPT. OF EDUCATION 0103/22/2026
DOE 0401803/22/2026
POSITIVE ELECTRICAL ASSOC203/22/2026
DOE 0 040103/22/2026
DEPARTMENT OF EDUCATION803/22/2026
POSITIVE ELEC ASSOC203/22/2026
DOE JOHN F KENNEDY HS040103/22/2026
DEPARTMENT OF EDUCATION 0303/22/2026
NEW YORK CITY BOARD OF ED103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GANNETT FLEMING1103/27/2026
ATANE ENGINEERS, ARCHITECTS, AND LA103/09/2026
MICHAEL TOBIAS203/04/2026
DSENY ENGINEERING SERVICES, PC202/25/2026
TRC ENGINEERS, INC.202/24/2026
THE RBA GROUP605/01/2025
AME SERVICES INC302/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NV5503/21/2026
JMV ASSOCIATES203/21/2026
CASO ASSOCIATES203/21/2026
AME SERVICES603/21/2026
Gannett Fleming Inc.203/21/2026
DSENY ENGINEERING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SINGH LANDSCAPING & LAWNGeneral Contractor2107/08/2026
ABC CONSTRUCTION CONT INCGeneral Contractor607/08/2026
CHAYUT, ALLENElectrical403/21/2026
FLORENTINE ARTISTIC IRONElectrical403/21/2026
SCHWERDTFEGER, MARCUSElectrical403/21/2026
LUPINSKI, MAREKElectrical403/21/2026
FORSYTHE PLBG & HTG CORPPlumbing207/08/2026
ANTHONY COMOElectrical203/21/2026
CHARAN ELEC'L ENTERP'S INElectrical203/22/2026
NATIONAL ENVIROMENTAL SAFETYGeneral Contractor207/08/2026
FRANCIS RICHARDSElectrical103/21/2026
CEDOMIR MARAElectrical103/21/2026
MARTANY TILE CORPElectrical103/21/2026
MERCURY PLBG & HTG COElectrical103/21/2026
BORRELLI, RAFFAELEElectrical103/21/2026
BAIN, GElectrical103/21/2026
ALEXANDRINI, VINCENTElectrical103/21/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
COONEY, RONANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061203/27/2026
MP ENGINEERS & ARCHITECTS1438202/24/2026
TWIN PEAKS INC.317704/17/2025
Building Lifecycle
All (180)Filed (27)Permit Issued (21)Signed Off (2)Facade (FISP) (15)Violation (60)Objection (25)Special Inspection (30)
07/06/2026
Permit issued — General Construction
X01119681-I1-GC
07/06/2026
Permit issued — General Construction
M01229093-I1-GC
07/06/2026
Permit issued — General Construction
M01229093-S2-GC-CX
06/22/2026
Permit issued — Foundation
M01229093-S5-FO
06/22/2026
Permit issued — Structural
M01229093-S6-GC-CX
06/10/2026
Permit issued — Plumbing
M01229093-S1-PL
06/05/2026
Permit issued — Protection and Mechanical Methods
M01229093-S7-PMM
06/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/05/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
05/21/2026
Permit issued — Construction Fence
M01311818-I1-FN
04/08/2026
Objection resolved — Resolved
04/06/2026
Objection resolved — Addressed
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Demolition
GEORGE GHEBRYAL
04/03/2026
Objection resolved — Addressed
04/02/2026
Special inspection requirement — Post-installed Anchors
04/01/2026
Objection resolved — Addressed
03/27/2026
Filed — Alteration
demolition of existing slab and installation of new slab.
M01229093-P6
03/26/2026
Filed — Alteration
demolition of existing slab and installation of new slab.
M01229093-P5
03/23/2026
Special inspection requirement — Maintenance information
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/18/2026
Objection raised — Other
03/18/2026
Objection raised — Admin
03/11/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Demolition
GEORGE GHEBRYAL
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
03/09/2026
Filed — Alteration
JFK HS: Subsequent filing of General Construction and Structural work types for replacement of Basement Walk-in Freezer and walk in Refrigerator.
M01366876-S1
03/08/2026
Special inspection requirement — Structural Steel - Details
03/05/2026
Objection raised — Admin
03/04/2026
Filed — Alteration
JFK HS: Subsequent filing of General Construction and Structural work types for replacement of Basement Walk-in Freezer and walk in Refrigerator.
M01366876-I1
03/02/2026
Filed — Alteration
X01360649-I1
02/25/2026
Filed — Alteration
demolition of existing slab and installation of new slab.
M01229093-S7
02/24/2026
Filed — Alteration
demolition of existing slab and installation of new slab.
M01229093-P4
02/24/2026
Filed — Alteration
demolition of existing slab and installation of new slab.
M01229093-P3
02/23/2026
Objection raised — Other
02/18/2026
Filed — Alteration
demolition of existing slab and installation of new slab.
M01229093-P2
01/15/2026
Filed — Alteration
demolition of existing slab and installation of new slab.
M01229093-P1
12/22/2025
Objection raised — Other
12/17/2025
Filed — Alteration
FN/BX Theater HS - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR RELATED WITH DOB#M01229093 NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01311818-I1
11/06/2025
Objection resolved — Addressed
11/05/2025
Objection resolved — Addressed
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNATIONAL ENVIROMENTAL SAFETY07/06/2026
DOB NOWGeneral ConstructionPermit IssuedABC CONSTRUCTION CONT INC07/06/2026
DOB NOWGeneral ConstructionPermit IssuedABC CONSTRUCTION CONT INC07/06/2026
DOB NOWFoundationPermit IssuedABC CONSTRUCTION CONT INC06/22/2026
DOB NOWStructuralPermit IssuedABC CONSTRUCTION CONT INC06/22/2026
DOB NOWPlumbingPermit IssuedFORSYTHE PLBG & HTG CORP06/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedABC CONSTRUCTION CONT INC06/05/2026
DOB NOWConstruction FencePermit IssuedABC CONSTRUCTION CONT INC05/21/2026
DOB NOWGeneral ConstructionPermit IssuedNATIONAL ENVIROMENTAL SAF09/10/2025
DOB NOWPlumbingPermit IssuedFORSYTHE PLBG & HTG CORP09/03/2025
DOB NOWGeneral ConstructionPermit IssuedSINGH LANDSCAPING & LAWN08/06/2025
DOB NOWGeneral ConstructionPermit IssuedSINGH LANDSCAPING & LAWN07/01/2024
DOB NOWSupport of ExcavationSigned-offSINGH LANDSCAPING & LAWN02/20/2024
DOB NOWConstruction FenceSigned-offSINGH LANDSCAPING & LAWN02/20/2024
DOB NOWGeneral ConstructionPermit IssuedSINGH LANDSCAPING & LAWN06/07/2023
DOB NOWSupport of ExcavationSigned-offSINGH LANDSCAPING & LAWN03/10/2023
DOB NOWConstruction FenceSigned-offSINGH LANDSCAPING & LAWN03/10/2023
DOB NOWSupport of ExcavationSigned-offSINGH LANDSCAPING & LAWN02/28/2023
DOB NOWConstruction FenceSigned-offSINGH LANDSCAPING & LAWN02/28/2023
DOB NOWSupport of ExcavationSigned-offSINGH LANDSCAPING & LAWN11/09/2022
DOB NOWConstruction FenceSigned-offSINGH LANDSCAPING & LAWN11/03/2022
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN07/29/2025
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN07/29/2024
BISOTISSUEDUNIVERSAL CONSTRUCTION RE03/18/2024
BISOTISSUEDWDF INC01/12/2024
BISOTISSUEDWDF INC01/12/2024
BISOTISSUEDWDF INC07/05/2023
BISOTISSUEDWDF INC07/05/2023
BISPLISSUEDWDF INC07/05/2023
BISOTISSUEDUNIVERSAL CONSTRUCTION RE03/13/2023
BISPLISSUEDV. C. VITANZA SONS INC02/08/2023
BISOTISSUEDUNIVERSAL CONSTRUCTION RE12/06/2022
BISOTISSUEDUNIVERSAL CONSTRUCTION RE12/06/2022
BISMHISSUEDWDF INC06/09/2022
BISOTISSUEDWDF INC06/09/2022
BISPLISSUEDWDF INC06/09/2022
BISPLISSUEDWDF INC06/09/2022
BISOTISSUEDWDF INC06/09/2022
BISOTISSUEDWDF INC06/09/2022
BISOTISSUEDWDF INC06/09/2022
+ 31 more permits on file
2 projects · most recent 03/27/2026
Others Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026Permit IssuedABC CONSTRUCTION CONT INCOthers
Other
Obar OBAR GBR89HA 300 CFM · Exhaust Fan ×4
03/09/2026——Refrigeration Systems
Refrigeration
Bally BEZA007H9-HT3E 7,140 BTU · Refrigeration Unit ×2
BEZA020L9-HT3E 7,058 BTU · Refrigeration Unit ×2
BLP108MA-S1E 7,680 BTU · Refrigeration Unit ×2
BLP209LE-S2E 9,390 BTU · Refrigeration Unit ×2
2 projects · most recent 03/27/2026
Water/Sanitary Storm
FiledStatusContractorScope
03/27/2026Permit IssuedFORSYTHE PLBG & HTG CORPWater/Sanitary
05/01/2025Permit IssuedFORSYTHE PLBG & HTG CORPStorm
20 projects · most recent 08/18/2026
General Wiring
FiledStatusContractorScope
08/18/2026CompleteG.S.H. ELECTRIC INC.General Wiring
08/11/2026Permit IssuedSTANCO SYSTEM ELEC'L CONT—
01/28/2025CompleteANCO ELECTL CONTCTNG INC—
12/20/2024CompleteDNR ELECTRIC INCORPORATEGeneral Wiring
12/10/2024CompleteANCO ELECTL CONTCTNG INC—
07/11/2023CompletePACIFIC ELEC'L CONTR'G IN—
06/26/2023CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
03/01/2023CompleteGEMINI ELECTRIC CO., INC.—
10/27/2022CompleteCHARAN ELEC'L ENTERP'S IN—
06/24/2022CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
12/16/2021CompleteABM ELECTRIC, INC—
11/27/2019CompleteCHARAN ELEC'L ENTERP'S IN—
09/11/2019CompleteCHARAN ELEC'L ENTERP'S IN—
05/14/2019CompleteCHARAN ELEC'L ENTERP'S IN—
12/17/2018CompleteCHARAN ELEC'L ENTERP'S IN—
2 projects · most recent 03/27/2026
Concrete Steel
FiledStatusContractorScope
03/27/2026Permit IssuedABC CONSTRUCTION CONT INCConcrete
03/09/2026——Steel
1 project · most recent 12/17/2025
Fence
FiledStatusContractorScope
12/17/2025Permit IssuedABC CONSTRUCTION CONT INCFence
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
06/05/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
06/05/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/05/2026MasonryGEORGE GHEBRYALspecial
04/06/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
04/06/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
04/06/2026Subgrade InspectionsGEORGE GHEBRYALspecial
04/06/2026FinalGEORGE GHEBRYALprogress
04/06/2026Footing and FoundationGEORGE GHEBRYALprogress
04/06/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
04/06/2026Deep Foundation ElementsGEORGE GHEBRYALspecial
04/06/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
04/06/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
04/06/2026FinalGEORGE GHEBRYALprogress
04/06/2026DemolitionGEORGE GHEBRYALspecial
04/02/2026Post-installed Anchors—special
03/23/2026Maintenance information—energy_progress
03/23/2026HVAC-R and service water heating equipment—energy_progress
03/23/2026HVAC-R and service water piping design and insulation—energy_progress
03/11/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
03/11/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
03/11/2026Subgrade InspectionsGEORGE GHEBRYALspecial
03/11/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
03/11/2026FinalGEORGE GHEBRYALprogress
03/11/2026Footing and FoundationGEORGE GHEBRYALprogress
03/11/2026FinalGEORGE GHEBRYALprogress
Latest 25 of 59.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bronx Engineering & Tech AcademyEducation—
Project X08004865 Alteration · LOC Issued · 10/12/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 231 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/23/2026X08004867-P1Request digital key ↗
08/23/2026X08004865-I1Request digital key ↗
08/23/2026M01229093-P1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
12/15/2016220494463Open ↗
01/05/2016220494463Open ↗
06/18/2014220333663Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
05/18/2016220532047Open ↗
01/05/2016220494463Open ↗
12/24/2015220494463Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications61
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/23/2026X08004865-I1Open ↗
08/23/2026M01229093-S6Open ↗
08/23/2026M01229093-S2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026X00704165-I1Open ↗
09/01/2026X00704165-I1Open ↗
08/31/2026M01229093-P4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026M01229093-P4Open ↗
08/31/2026M01229093-P4Open ↗
08/31/2026M01229093-P4Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
05/18/2016220532047Open ↗
01/05/2016220333663Open ↗
12/24/2015220494463Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/24/2015220494463Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/24/2015220494463Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE1
05/31/2013120161127Open ↗
▸BISSCHEDULE B - PLUMBING1
09/22/2009120161127Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/23/2013120161127Open ↗
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/20/2026M01311818-I1Open ↗
08/13/2026X08004865-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/23/2026M01229093-S6Open ↗
08/23/2026M01229093-S5Open ↗
08/23/2026M01229093-S1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/24/2015220494463Open ↗
09/19/2013220333663Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/22/2009120161127Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/18/2016220532047Open ↗
01/05/2016220333663Open ↗
01/05/2016220333663Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/09/2017220494463Open ↗
01/05/2016220333663Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/23/2026M01229093-S5Open ↗
08/13/2026M01229093-P5Open ↗
▸Approvals, Objections & Sign-offs64
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
08/23/2026X08004865-I1Open ↗
08/23/2026M01229093-I1Open ↗
08/23/2026M01229093-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)24
08/23/2026M01229093-I1Open ↗
08/23/2026M01229093-S6Open ↗
08/23/2026M01229093-P1Open ↗
Showing 3 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/18/2016220532047Open ↗
01/05/2016220333663Open ↗
11/15/2013220333663Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/09/2017220494463Open ↗
01/22/2016220333663Open ↗
01/05/2016220333663Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026X00704165-S1Open ↗
08/13/2026X08004865-I1Open ↗
08/13/2026X08004867-I1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026X00704165-S1Open ↗
08/13/2026X00704165-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/22/2009120161127Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
05/09/2017220494463Open ↗
05/18/2016220532047Open ↗
01/05/2016220333663Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET4
05/18/2016220532047Open ↗
12/24/2015220494463Open ↗
09/19/2013220333663Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION1
05/09/2017220494463Open ↗
▸Other Documents33
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal29
08/23/2026M01229093-I1Open ↗
08/23/2026M01229093-P1Open ↗
08/23/2026M01229093-S6Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/13/2026X08004865-I1Open ↗
08/13/2026X08004867-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/23/2026M01229093-S6Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X08004867-I1Open ↗