← Back
BuildNYC
Over six families without stores
991 PRESIDENT STREET
BROOKLYN · BIN 3029701
💬 Discuss this project
1927Year Built
4Stories
C1Building Class
R6AZoning
25,152 sfGross Floor Area
33Units
LL97 CoveredRent Stabilized43 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Over six families without stores · Owner of record: PRC President St · 7,860 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade and parapet wall repair6p · 1 filing · 9 docs
Floor 1Unit 1A, Unit 1D2p · 2 filings · 8 docs
CellarHVAC-R and service water heating equipment1p · 1 filing · 7 docs
Site & exteriorPipe scaffold installation13p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BCB 991 President Street1403/21/2026
PRC President St803/22/2026
BCB Properties203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ronald Krigsman P.E.P.C.111/09/2022
Greystone305/11/2022
Enthink Engineers101/27/2022
Syed Engineering107/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Nazaret Koroglu PE403/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK EnterprisesScaffold603/21/2026
Topline NYC ContractingScaffold507/08/2026
XL GroupGeneral Contractor403/21/2026
Oishi ConstructionGeneral Contractor303/21/2026
Ips PlumbingPlumbing107/08/2026
PSI MechanicalPlumbing103/21/2026
EH Plumbing & HeatingPlumbing107/08/2026
Grand Homes ContractillcGeneral Contractor209/02/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ronald Krigsman P.E.P.C.1583111/09/2022
Greystone Engineering2973105/11/2022
Building Lifecycle
06/03/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT…
HPD violation · open
06/03/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3D, 3rd…
HPD violation · open
03/05/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/21/2026
§ 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTELINE UNDER SINK IN THE KITCHEN LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT…
HPD violation · open
11/18/2025
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3D, 3rd…
HPD violation · open
239 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offMNK Enterprises01/24/2023
DOB NOWBoiler EquipmentSigned-offDMT Plumbing & Heating01/18/2023
DOB NOWGeneral ConstructionPermit IssuedOishi Construction09/08/2022
DOB NOWSidewalk ShedPermit IssuedTopline NYC Contracting08/18/2022
DOB NOWSupported ScaffoldSigned-offMNK Enterprises01/27/2022
DOB NOWSidewalk ShedPermit IssuedTopline NYC Contracting08/22/2021
DOB NOWPlumbingSigned-offIps Plumbing10/01/2020
DOB NOWSidewalk ShedPermit IssuedTopline NYC Contracting07/31/2020
DOB NOWPlumbingSigned-offEH Plumbing & Heating07/13/2020
BISOTISSUEDGrand Homes Contractillc09/02/2020
BISOTISSUEDGrand Homes Contractillc06/08/2020
BISOTISSUEDXL Group09/22/2015
BISOTISSUEDXL Group09/02/2015
BISPLISSUEDP.S.I. Mechanical04/24/2015
BISOTISSUEDXL Group03/30/2015
BISOTISSUEDXL Group01/14/2015
BISOTISSUEDXL Group01/14/2015
BISOTISSUEDXL Group01/14/2015
BISPLISSUEDP.S.I. Mechanical12/30/2014
BISPLISSUEDP.S.I. Mechanical11/25/2014
BISPLISSUEDP.S.I. Mechanical11/25/2014
BISOTISSUEDXL Group11/05/2014
BISOTISSUEDXL Group10/14/2014
BISOTISSUEDXL Group08/14/2014
BISBLISSUEDApproved Oil of Brooklyn11/13/2007
5 projects · most recent 08/01/2025
Boiler Controls General Wiring
FiledStatusContractorScope
08/01/2025CompleteAccurate ElectricalBoiler Controls
11/17/2022Permit IssuedMartin DorkinBoiler Controls
01/14/2021CompleteCresco ElectricalGeneral Wiring
07/30/2020Permit IssuedRichard Neu—
07/08/2020CompleteCresco ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/13/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/07/2022Tenant Protection Plan ComplianceHOWARD KRIGSMANspecial
11/07/2022HVAC-R and service water heating equipmentHOWARD KRIGSMANenergy_progress
11/07/2022Maintenance informationHOWARD KRIGSMANenergy_progress
04/19/2022PreliminaryTIMOTHY TWEEDYprogress
04/19/2022MasonryTIMOTHY TWEEDYspecial
04/19/2022Air barrier - visual inspectionTIMOTHY TWEEDYenergy_progress
04/19/2022FinalTIMOTHY TWEEDYprogress
04/19/2022Energy Code Compliance InspectionsTIMOTHY TWEEDYprogress
154 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account