← Back
Over six families without stores
992 COLLEGE AVENUE
BRONX · BIN 2002182
💬 Discuss this project
1930Year Built
3Stories
C1Building Class
R7-1Zoning
3,448 sfGross Floor Area
9Units
Rent Stabilized23 Open Violations ▸
Over six families without stores · Owner of record: 992 COLL LLC · 1,778 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Roof1p · 1 filing
Floor 31p · 1 filing
Floor 214p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
Basement14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GALAXY DEVELOPERS407/08/2026
992 COLL LLC303/22/2026
MABE GROUP303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/29/2024$975K—Private party → 992 COLL LLC$283/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF SERVICES CROP305/09/2025
SH ENGINEERING PLLC103/18/2024
VASILIOS ARTEMIOU PE101/30/2024
ADB ASSOCIATES301/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MABE GROUP INCGeneral Contractor807/08/2026
FRIED ELECTRIC CO.Electrical103/22/2026
AMOK INCFire Protection107/08/2026
AMOK INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616705/09/2025
Building Lifecycle
All (137)Filed (8)Permit Issued (6)Signed Off (4)Violation (43)Inspection (8)Objection (38)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
05/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/20/2025
Special inspection requirement — Metering
FAHAD FATEH
05/20/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/20/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/20/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
05/20/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
05/20/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/20/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/20/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
05/20/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/20/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/09/2025
Filed — Alteration CO
Filing a Sprinkler application subsequent to the primary approved application X00971195-I1
X00971195-P3
04/30/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/30/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/30/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
04/30/2025
Special inspection requirement — Metering
FAHAD FATEH
04/30/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/30/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/30/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/30/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
04/30/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/30/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
04/30/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/09/2025
Signed off — Alteration CO
Filing a Sprinkler application subsequent to the primary approved application X00971195-I1
X00971195-S2
09/13/2024
Signed off — Alteration CO
Filing a Sprinkler application subsequent to the primary approved application X00971195-I1
X00971195-S4
08/26/2024
Signed off — Alteration CO
Filing a Sprinkler application subsequent to the primary approved application X00971195-I1
X00971195-S1
08/26/2024
Signed off — Alteration CO
Filing a Sprinkler application subsequent to the primary approved application X00971195-I1
X00971195-S3
08/19/2024
Filed — Alteration CO
Filing a Sprinkler application subsequent to the primary approved application X00971195-I1
X00971195-P1
07/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/17/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/15/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/08/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/19/2024
Permit issued — Sprinklers
X00971195-S3-EW-SP
04/19/2024
Violation issued (ECB, closed)
Construction
04/17/2024
Permit issued — Mechanical Systems
X00971195-S1-MS
04/16/2024
Permit issued — Structural
X00971195-S4-ST
04/16/2024
Permit issued — General Construction
X00971195-I1-GC
04/16/2024
Permit issued — Plumbing
X00971195-S2-PL
04/02/2024
Violation issued (HPD, closed)
A
03/25/2024
Objection resolved — Addressed
03/21/2024
Objection raised — Cost
03/18/2024
Filed — Alteration CO
Filing a Sprinkler application subsequent to the primary approved application X00971195-I1
X00971195-S4
02/06/2024
Violation issued (ECB, closed)
Construction
02/06/2024
Violation issued (ECB, closed)
Unknown
02/06/2024
Violation issued (ECB, closed)
Construction
02/06/2024
Violation issued (ECB, closed)
Construction
02/01/2024
Permit issued — General Construction
X00971195-I1-GC
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAMOK INC04/19/2024
DOB NOWMechanical SystemsSigned-offAB BUILDERS NY04/17/2024
DOB NOWStructuralSigned-offAB BUILDERS NY04/16/2024
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY04/16/2024
DOB NOWPlumbingSigned-offAMOK INC04/16/2024
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY02/01/2024
1 project · most recent 05/09/2025
Sprinkler System
FiledStatusContractorScope
05/09/2025Signed-offAMOK INCSprinkler System
1 project · most recent 05/09/2025
Water/Sanitary
FiledStatusContractorScope
05/09/2025Signed-offAMOK INCWater/Sanitary
3 projects · most recent 03/03/2025
General Wiring
FiledStatusContractorScope
03/03/2025CompleteFRIED ELECTRIC CO.General Wiring
08/01/2024CompleteFRIED ELECTRIC CO.General Wiring
02/06/2024CompletePOWER DIRECT ELECTRIC INC—
1 project · most recent 05/09/2025
Wood
FiledStatusContractorScope
05/09/2025Signed-offAMOK INCWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
05/20/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
05/20/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
05/20/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
05/20/2025MeteringFAHAD FATEHenergy_progress
05/20/2025Interior lighting powerFAHAD FATEHenergy_progress
05/20/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/20/2025Fenestration air leakageFAHAD FATEHenergy_progress
05/20/2025Maintenance informationFAHAD FATEHenergy_progress
05/20/2025Permanent certificateFAHAD FATEHenergy_progress
05/20/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/20/2025Fenestration areasFAHAD FATEHenergy_progress
05/20/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/20/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/20/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/20/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/30/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/30/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
04/30/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/30/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/30/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/30/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/30/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
04/30/2025Permanent certificateFAHAD FATEHenergy_progress
04/30/2025MeteringFAHAD FATEHenergy_progress
04/30/2025Interior lighting powerFAHAD FATEHenergy_progress
Latest 25 of 62.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026X00971195-S1Request digital key ↗
08/21/2026X00971195-S2Request digital key ↗
08/21/2026X00971195-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026X00971195-I1Open ↗
08/29/2026X00971195-I1Open ↗
08/25/2026X00971195-S3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026X00971195-I1Open ↗
08/29/2026X00971195-I1Open ↗
08/25/2026X00971195-S4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026X00971195-S1Open ↗
08/21/2026X00971195-I1Open ↗
08/21/2026X00971195-S4Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/21/2026X00971195-P1Open ↗
08/21/2026X00971195-P3Open ↗
08/15/2026X00971195-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026X00971195-S3Open ↗
08/21/2026X00971195-S2Open ↗
08/21/2026X00971195-P3Open ↗
Showing 3 of 7 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/21/2026X00971195-P1Open ↗
08/21/2026X00971195-P3Open ↗
08/15/2026X00971195-I1Open ↗