Two family brick
993 NEILL AVENUE
BRONX · Morris Park · BIN 2049020
💬 Discuss this project
1955Year Built
1Stories
B1Building Class
R4-1Zoning
1,415 sfGross Floor Area
2Units
Two family brick · 2,500 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ENGINEERING PLLC110/27/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MR. PLUMBER, INC.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137110/27/2021
Building Lifecycle
All (11)Filed (1)Permit Issued (1)Signed Off (1)Inspection (2)Special Inspection (6)
02/11/2022
Signed off — Alteration
RELOCATE EXISTING GAS METERS TO OUTSIDE SPACE. NEW FURNACE AND HOT WATER HEATER. NEW PIPING TO REPLACE EXISTING PIPING TO SECOND FLOOR GAS RANGE.
X00619114-I1
01/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/15/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/29/2021
Permit issued — Plumbing
X00619114-I1-PL
10/27/2021
Filed — Alteration
RELOCATE EXISTING GAS METERS TO OUTSIDE SPACE. NEW FURNACE AND HOT WATER HEATER. NEW PIPING TO REPLACE EXISTING PIPING TO SECOND FLOOR GAS RANGE.
X00619114-I1
10/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
10/26/2021
Special inspection requirement — Maintenance information
SHAHIN BADALY
10/26/2021
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
10/26/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
10/26/2021
Special inspection requirement — Permanent certificate
SHAHIN BADALY
10/26/2021
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMR. PLUMBER, INC.10/29/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/26/2021Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
10/26/2021Maintenance informationSHAHIN BADALYenergy_progress
10/26/2021HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
10/26/2021HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
10/26/2021Permanent certificateSHAHIN BADALYenergy_progress
10/26/2021HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026X00619114-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026X00619114-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X00619114-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026X00619114-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026X00619114-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00619114-I1Open ↗