← Back
BuildNYC
Bungalow colony - cooperatively owned land
Breezy Point Cooperative
993A BAYSIDE · BIN 4530053
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
460,000 sfGross Floor Area
539Units
LL97 Covered10 Active Violations 1 unresolved · 9 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: Breezy Point Cooperative · 3,589,344 sf lot · 0.13 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Plumbing work4p · 1 filing · 6 docs
Floor 11p · 2 filings · 4 docs
Site & exteriorTemporary construction fence2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Breezy Point Cooperative1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Leon Skvirsky PE404/10/2026
Norman C. Lok, PE202/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rockfish Custom BuildersGeneral Contractor303/21/2026
Rockfish Custom BuildersScaffold303/21/2026
Simply Strong ConstructionGeneral Contractor107/08/2026
Joseph O'Grady P & HPlumbing107/08/2026
Building Lifecycle
All (19)Filed (6)Permit Issued (4)Signed Off (3)Inspection (5)Special Inspection (1)
10/01/2026
Signed off — Alteration
PROPOSED LIFT AND DECKS
Q01160887-I1
09/23/2026
Signed off — Alteration
PROPOSED PLUMBING
Q01199421-I1
04/25/2026
Signed off — Alteration
Q01145555-I1
04/10/2026
Filed — Alteration
PROPOSED PLUMBING
Q01199421-P2
04/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2026
Filed — Alteration
PROPOSED PLUMBING
Q01199421-P1
01/07/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/07/2026
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
01/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/08/2025
Permit issued — Plumbing
Q01199421-I1-PL
04/03/2025
Permit issued — Structural
Q01160887-I1-GC-CX
03/28/2025
Filed — Alteration
PROPOSED PLUMBING
Q01199421-I1
02/14/2025
Permit issued — Construction Fence
Q01145555-I1-FN
02/11/2025
Permit issued — Structural
Q01160887-I1-GC-CX
02/08/2025
Filed — Alteration
Q01145555-I1
01/07/2025
Filed — Alteration
PROPOSED LIFT AND DECKS
Q01160887-I1
12/29/2024
Special inspection requirement — Final
LEON SKVIRSKY
10/30/2024
Filed — Alteration
Q01119056-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJoseph O'Grady P & H12/08/2025
DOB NOWStructuralSigned-offSimply Strong Construction04/03/2025
DOB NOWConstruction FenceSigned-offRockfish Custom Builders02/14/2025
DOB NOWStructuralSigned-offRockfish Custom Builders02/11/2025
1 project · most recent 04/10/2026
FiledStatusContractorScope
04/10/2026——36 heads
1 project · most recent 04/10/2026
Gas Plumbing-Sprinkler
FiledStatusContractorScope
04/10/2026Signed-offJoseph O'Grady P & HGas, Plumbing-Sprinkler
1 project · most recent 11/30/2025
General Wiring
FiledStatusContractorScope
11/30/2025CompleteG.E.O. ElectricGeneral Wiring
1 project · most recent 01/07/2025
Concrete
FiledStatusContractorScope
01/07/2025Signed-offSimply Strong ConstructionConcrete
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/07/2026Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
01/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/29/2024FinalLEON SKVIRSKYprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q01160887-I1Request digital key ↗
08/21/2026Q01145555-I1Request digital key ↗
08/17/2026Q01199421-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q01160887-I1Open ↗
08/21/2026Q01145555-I1Open ↗
08/17/2026Q01199421-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026Q01160887-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01160887-I1Open ↗