The Narrows Condominium
9956 3 AVENUE · BIN 3428832
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof6p · 5 filings · 20 docs
Floor 84p · 4 filings · 20 docs
Floor 73p · 3 filings · 20 docs
Floor 64p · 3 filings · 20 docs
Floor 53p · 1 filing · 18 docs
Floor 44p · 1 filing · 18 docs
Floor 33p · 1 filing · 18 docs
Floor 27p · 5 filings · 20 docs
Floor 14p · 3 filings · 20 docs
Cellar9p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NARROWS1807/08/2026
SAPOL CONSTRUCTION3707/08/2026
WNS DEVELOMENT L.L.C.303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/07/2019$2.6M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEVIN ENGINEERING PLLC910/18/2022
SIMINO ARCHITECT106/16/2022
ASHRAF CORP801/11/2022
MGM CREATIONS ARCHITECTURE205/27/2020
WEXLER ASSOCIATES103/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC1203/21/2026
ADAM BERGMAN CONSTRUCTION AND DEVEL803/21/2026
A2ZCM403/21/2026
AVALON DESIGN603/21/2026
SIMINO ARCHITECT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAPOL CONSTRUCTION LLCGeneral Contractor907/08/2026
PHOENIX SUTTON STR INCGeneral Contractor707/08/2026
ROM PIPING & HTG INCPlumbing207/08/2026
ROM PIPING & HEATING INCFire Protection207/08/2026
EMPIRE STATE ELECTL CORPElectrical203/22/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
SIMINO ARCHITECTGeneral Contractor103/22/2026
MGM CREATIONSGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803808/15/2022
Building Lifecycle
All (100)Filed (24)Permit Issued (13)Signed Off (12)Violation (17)Inspection (7)Objection (8)Special Inspection (19)
03/02/2023
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION NEW BUILDING APPLICATION #322020406. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00311931-I1
02/06/2023
Signed off — Alteration
B00333966-I1
01/05/2023
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION NEW BUILDING APPLICATION #322020406. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00311931-S1
12/12/2022
Special inspection requirement — HVAC and service water heating system controls
SAMI HAJJAR P.E
12/12/2022
Special inspection requirement — HVAC and service water heating equipment
SAMI HAJJAR P.E
11/30/2022
Objection resolved — Addressed
11/18/2022
Signed off — Alteration
B00313015-I1
11/17/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/10/2022
Permit issued — Curb Cut
B00313015-I1-CC
11/02/2022
Objection resolved — Addressed
10/26/2022
Objection resolved — Addressed
10/25/2022
Signed off — Alteration
B00251192-I1
10/25/2022
Signed off — Alteration
B00251133-I1
10/24/2022
Objection raised — Scope
10/24/2022
Objection raised — Mechanical
10/24/2022
Objection raised — Admin
10/19/2022
Signed off — Alteration
B00251137-I1
10/18/2022
Signed off — Alteration
INSTALLATION OF SPRINKLER/ STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION # 322020406. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00332327-I1
10/18/2022
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION NEW BUILDING APPLICATION #322020406. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00311931-P3
10/12/2022
Special inspection requirement — HVAC and service water heating system controls
SAMI HAJJAR P.E
10/12/2022
Special inspection requirement — HVAC and service water heating equipment
SAMI HAJJAR P.E
08/30/2022
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
08/30/2022
Special inspection requirement — Standpipe Systems
SAMI HAJJAR P.E
08/18/2022
Signed off — Alteration
B00314644-I1
08/15/2022
Filed — Alteration
INSTALLATION OF SPRINKLER/ STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION # 322020406. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00332327-P4
08/11/2022
Special inspection requirement — Standpipe Systems
SAMI HAJJAR P.E
08/11/2022
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
08/04/2022
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
07/25/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY (66'-72') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
B00462034-I1
07/25/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00436863-I1
06/22/2022
Objection raised — Scope
06/22/2022
Objection resolved — Addressed
06/16/2022
Filed — No Work
B00757621-I1
06/09/2022
Filed — Alteration
INSTALLATION OF SPRINKLER/ STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION # 322020406. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00332327-P3
05/27/2022
Permit issued — Construction Fence
B00251137-I1-FN
05/12/2022
Permit issued — Structural
B00333966-I1-ST
04/19/2022
Filed — Alteration
INSTALLATION OF SPRINKLER/ STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION # 322020406. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00332327-P2
04/13/2022
Signed off — Alteration
B00352104-I1
02/01/2022
Permit issued — Supported Scaffold
B00462034-I1-SF
01/12/2022
Special inspection requirement — Final
Eric Foster
01/11/2022
Filed — Alteration
INSTALLATION OF TEMPORARY (66'-72') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
B00462034-P2
01/06/2022
Violation issued (ECB, closed)
Construction
12/08/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/03/2021
Permit issued — Sidewalk Shed
B00436863-I1-SH
12/01/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/26/2021
Violation issued (ECB, closed)
Construction
10/29/2021
Permit issued — Sprinklers
B00332327-I1-PL
10/29/2021
Permit issued — Plumbing
B00332327-I1-EW-SD
10/29/2021
Permit issued — Standpipe
B00332327-I1-EW-SP
10/28/2021
Special inspection requirement — Final
Eric Foster
10/26/2021
Filed — Alteration
INSTALLATION OF TEMPORARY (66'-72') HIGH PIPE SCAFFOLD AT VARIOUS LEVELS FOR FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
B00462034-P1
10/26/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00436863-P4
10/18/2021
Violation issued (ECB, closed)
Site Safety
10/13/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/07/2021
Violation issued (ECB, closed)
Construction
10/07/2021
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
10/07/2021
Violation issued (ECB, closed)
Construction
10/07/2021
Violation issued (ECB, closed)
Construction
10/07/2021
Violation issued (ECB, closed)
Signs
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offLEON D. DEMATTEIS CONSTR11/10/2022
DOB NOWConstruction FenceSigned-offLEON D. DEMATTEIS CONSTR05/27/2022
DOB NOWStructuralSigned-offLEON D. DEMATTEIS CONSTR05/12/2022
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC02/01/2022
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC12/03/2021
DOB NOWSprinklersSigned-offROM PIPING & HTG INC10/29/2021
DOB NOWPlumbingSigned-offROM PIPING & HEATING INC10/29/2021
DOB NOWStandpipeSigned-offROM PIPING & HEATING INC10/29/2021
DOB NOWConstruction FenceSigned-offLEON D. DEMATTEIS CONSTR06/02/2021
DOB NOWMechanical SystemsSigned-offLEON D. DEMATTEIS CONSTR06/01/2021
DOB NOWPlumbingSigned-offROM PIPING & HTG INC05/04/2021
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC02/01/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC12/07/2020
BIS—ISSUEDSAPOL CONSTRUCTION LLC08/03/2022
BIS—ISSUEDSAPOL CONSTRUCTION LLC05/04/2022
BISEQISSUEDPHOENIX SUTTON STR INC02/02/2022
BIS—ISSUEDSAPOL CONSTRUCTION LLC08/06/2021
BISEQISSUEDPHOENIX SUTTON STR INC02/02/2021
BIS—ISSUEDSAPOL CONSTRUCTION LLC08/24/2020
BISOTISSUEDSAPOL CONSTRUCTION LLC08/13/2020
4 projects · most recent 03/31/2023
General Wiring
FiledStatusContractorScope
03/31/2023CancelledJOSEPH WEINSTEIN ELECTRICGeneral Wiring
11/16/2022CompleteSTAR ELEC'L CONTRACTORS C—
10/25/2022CompleteEMPIRE STATE ELECTL CORPGeneral Wiring
10/13/2020CompleteELPO ELECTRICAL CONTG INC—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
11/17/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
08/04/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
12/08/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/13/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/08/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/14/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
12/12/2022HVAC and service water heating system controls SAMI HAJJAR P.Eenergy_progress
12/12/2022HVAC and service water heating equipment SAMI HAJJAR P.Eenergy_progress
10/12/2022HVAC and service water heating system controls SAMI HAJJAR P.Eenergy_progress
10/12/2022HVAC and service water heating equipment SAMI HAJJAR P.Eenergy_progress
08/30/2022Sprinkler SystemsSAMI HAJJAR P.Especial
08/30/2022Standpipe SystemsSAMI HAJJAR P.Especial
08/11/2022Standpipe SystemsSAMI HAJJAR P.Especial
08/11/2022Sprinkler SystemsSAMI HAJJAR P.Especial
01/12/2022FinalEric Fosterprogress
10/28/2021FinalEric Fosterprogress
11/12/2020Standpipe SystemsSAMI HAJJAR P.Especial
11/12/2020Sprinkler SystemsSAMI HAJJAR P.Especial
02/10/2020HVAC and service water heating equipment SAMI HAJJAR P.Eenergy_progress
02/10/2020HVAC insulation and sealing SAMI HAJJAR P.Eenergy_progress
02/10/2020Maintenance informationSAMI HAJJAR P.Eenergy_progress
02/10/2020Shutoff dampersSAMI HAJJAR P.Eenergy_progress
02/10/2020HVAC and service water heating system controls SAMI HAJJAR P.Eenergy_progress
02/07/2020FinalSAMI HAJJAR P.Eprogress
02/07/2020Mechanical SystemsSAMI HAJJAR P.Especial
▾Documents — 198 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch - Plumbing7
09/02/2026B00311931-S1Request digital key ↗
09/02/2026B00332327-I1Request digital key ↗
09/02/2026B00332327-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Standpipe6
09/02/2026B00314644-I1Request digital key ↗
09/02/2026B00332327-I1Request digital key ↗
09/02/2026B00332327-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/02/2026B00332327-I1Request digital key ↗
09/02/2026B00332327-P3Request digital key ↗
09/02/2026B00332327-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
09/02/2026B00436863-I1Request digital key ↗
08/15/2026B00436863-P2Request digital key ↗
08/15/2026B00436863-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence4
09/02/2026B00251133-I1Request digital key ↗
09/02/2026B00251137-I1Request digital key ↗
09/02/2026B00251192-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/01/2026B00462034-I1Request digital key ↗
09/01/2026B00462034-P2Request digital key ↗
08/15/2026B00462034-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00311931-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00313015-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/15/2026B00757621-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00333966-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION18
09/22/2022322020406Open ↗
09/22/2022322020406Open ↗
08/29/2022322110167Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
06/13/2022322020406Open ↗
09/15/2020322020406Open ↗
09/15/2020322020406Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
02/02/2021340803866Open ↗
01/27/2021322020406Open ↗
10/28/2020322086791Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/03/2022321928704Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/18/2022322020406Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM2
01/27/2023322020406Open ↗
09/15/2020322020406Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
08/25/2022322110167Open ↗
04/20/2020322020406Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/25/2022322110167Open ↗
▸BISVERIFY TAX LOT1
02/02/2023322020406Open ↗
▸BISZONING CHALLENGE1
11/19/2020322020406Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
08/25/2022322110167Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/11/2020322020406Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/25/2022322110167Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/02/2026B00436863-P2Open ↗
09/02/2026B00436863-P1Open ↗
09/02/2026B00436863-P3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/18/2026B00462034-I1Open ↗
08/30/2026B00436863-I1Open ↗
08/29/2026B00311931-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00332327-P1Open ↗
09/01/2026B00332327-P1Open ↗
08/28/2026B00311931-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/27/2021322020406Open ↗
01/02/2020322020406Open ↗
01/02/2020322020406Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/30/2021340803866Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/30/2021340803866Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/30/2021340803866Open ↗
▸Trade Schedules & Equipment4
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/07/2022322020406Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/07/2022322020406Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
04/20/2020322020406Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/12/2022322020406Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
07/14/2022321928704Open ↗
06/03/2022321928704Open ↗
02/13/2020321928704Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN2
07/14/2022321928704Open ↗
06/03/2022321928704Open ↗
▸BISSTREET TREE SIGNOFF1
11/01/2023322020406Open ↗
▸BISSTREET TREES SITE PLAN1
10/13/2023322020406Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/27/2021322020406Open ↗
01/02/2020322020406Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
07/22/2022322020406Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/06/2022322020406Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/02/2023322020406Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00311931-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/15/2022322086791Open ↗
12/15/2022322086791Open ↗
12/15/2022322086791Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
12/19/2022322086791Open ↗
10/11/2022322020406Open ↗
01/27/2021322020406Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
12/15/2022322086791Open ↗
01/02/2020322020406Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/27/2021322020406Open ↗
08/28/2020322086791Open ↗
▸BISSOIL REPORT1
04/20/2020322020406Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
01/27/2021322020406Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
12/19/2022322086791Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE5
05/27/2022322020406Open ↗
05/25/2022322020406Open ↗
03/21/2020322020406Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/19/2022322086791Open ↗
04/07/2022340803866Open ↗
▸BISFINAL1
04/06/2022340803866Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/22/2022322110167Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/12/2022321928704Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
06/13/2022322020406Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
01/27/2021322020406Open ↗
08/28/2020322086791Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/13/2022322086791Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION9
02/03/2023322020406Open ↗
02/03/2023322020406Open ↗
02/03/2023322020406Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET4
08/22/2022322110167Open ↗
05/29/2020322086791Open ↗
02/13/2020321928704Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/30/2021340803866Open ↗
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
08/22/2022322110167Open ↗
08/22/2022322110167Open ↗
08/22/2022322110167Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM3
08/25/2022322110167Open ↗
08/22/2022322110167Open ↗
04/20/2020322020406Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
10/07/2022322020406Open ↗
05/03/2022321928704Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/25/2022322110167Open ↗
▸BISBPP: INFRASTRUCTURE AND SITE SKETCH1
07/14/2022321928704Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
05/03/2022321928704Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/03/2022321928704Open ↗