← Back
Walk-up cooperative
9967 SHORE ROAD
BROOKLYN · BIN 3337179
💬 Discuss this project
1983Year Built
3Stories
C6Building Class
R6AZoning
40,824 sfGross Floor Area
60Units
Rent Stabilized96 Open Violations ▸FDNY Report ↗
Walk-up cooperative · 24,000 sf lot · 1.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 32p · 1 filing · 13 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WATERVIEW OWNERS INC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABC ENGINEERING PLLC204/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC ENGINEERING PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & W WILSON ENTERPRISESGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABC ENGINEERING PLLC1515204/16/2025
Building Lifecycle
All (35)Filed (2)Permit Issued (1)Signed Off (1)Violation (22)Inspection (2)Special Inspection (7)
05/05/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
04/17/2025
Signed off — Alteration
PROPOSED INSTALLATION OF ONE SPLIT HVAC SYSTEM AT 3RD FLOOR APARTMENT #7E. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01096683-I1
04/16/2025
Filed — Alteration
PROPOSED INSTALLATION OF ONE SPLIT HVAC SYSTEM AT 3RD FLOOR APARTMENT #7E. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01096683-P1
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUI ZENG
04/16/2025
Special inspection requirement — Mechanical Systems
HUI ZENG
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
04/16/2025
Special inspection requirement — Final
HUI ZENG
04/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
04/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
HUI ZENG
04/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
11/26/2024
Violation issued (HPD, open)
I
11/22/2024
Inspection — Administrative Rejection Boiler Certification
Administrative Rejection
View inspection ↗
11/01/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/26/2024
Permit issued — Mechanical Systems
B01096683-I1-MS
08/16/2024
Filed — Alteration
PROPOSED INSTALLATION OF ONE SPLIT HVAC SYSTEM AT 3RD FLOOR APARTMENT #7E. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01096683-I1
04/11/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
03/24/2023
Violation issued (HPD, open)
A
08/17/2022
Violation issued (HPD, closed)
C
08/17/2022
Violation issued (HPD, closed)
C
08/17/2022
Violation issued (HPD, closed)
C
08/17/2022
Violation issued (HPD, closed)
C
08/17/2022
Violation issued (HPD, open)
A
08/17/2022
Violation issued (HPD, open)
A
08/17/2022
Violation issued (HPD, open)
A
08/17/2022
Violation issued (HPD, open)
A
03/02/2022
Violation issued (HPD, closed)
A
03/02/2022
Violation issued (HPD, closed)
I
04/13/2021
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
I
05/22/2003
Violation issued (HPD, open)
B
04/06/2003
Violation issued (HPD, open)
B
04/06/2003
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offS & W WILSON ENTERPRISES08/26/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/22/2024Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
11/01/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
04/16/2025Fire-Resistant Penetrations and JointsHUI ZENGspecial
04/16/2025Mechanical SystemsHUI ZENGspecial
04/16/2025Energy Code Compliance InspectionsHUI ZENGprogress
04/16/2025FinalHUI ZENGprogress
04/16/2025HVAC-R and service water heating equipmentHUI ZENGenergy_progress
04/16/2025HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
04/16/2025HVAC-R and service water heating system controlsHUI ZENGenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B01096683-P1Request digital key ↗
08/24/2026B01096683-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026B01096683-I1Open ↗
08/31/2026B01096683-I1Open ↗
08/31/2026B01096683-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B01096683-P1Open ↗
08/24/2026B01096683-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B01096683-I1Open ↗
08/31/2026B01096683-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B01096683-I1Open ↗
08/24/2026B01096683-P1Open ↗