997 EAST 48TH STREET
BROOKLYN · BIN 3812678
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1Convergent Energy & PowerUnder Construction6p · 3 filings · 12 docs
Site & exteriorConvergent Energy & PowerUnder Construction15p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
60 Central Energy Storage 3303/21/2026
Bensonhurst Energy Storage 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Grace IndustriesGeneral Contractor508/26/2026
Welkin EnterprisesPlumbing206/28/2026
Haugland Energy GroupElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants2003501/09/2026
Gta Engineering Services2940211/26/2025
Building Lifecycle
All (37)Filed (10)Permit Issued (6)Signed Off (2)Inspection (4)Objection (6)Special Inspection (9)
10/09/2026
Filed — Alteration
Electric Energy Storage Equipment filing related to Alt CO application B01006778-I1.
B01238398-P2
10/05/2026
Special inspection requirement — Final
Christopher Drutjons
09/14/2026
Signed off — Alteration CO
INSTALLATION OF (8) CONCRETE FOUNDATION PADS FOR (6) TESLA MEGA PACK 2XL BATTERY ENERGY STORAGE UNIT AND SUPPORTING EQUIOMENT. ALT1 APPLICATION #Q01006778-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01006778-S6
09/14/2026
Signed off — Alteration CO
INSTALLATION OF (8) CONCRETE FOUNDATION PADS FOR (6) TESLA MEGA PACK 2XL BATTERY ENERGY STORAGE UNIT AND SUPPORTING EQUIOMENT. ALT1 APPLICATION #Q01006778-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01006778-S7
08/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2026
Permit issued — Curb Cut
B01366330-I1-CC
04/22/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/20/2026
Special inspection requirement — Final
Christopher Drutjons
04/13/2026
Filed — Alteration
Electric Energy Storage Equipment filing related to Alt CO application B01006778-I1.
B01238398-P1
04/06/2026
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
03/30/2026
Filed — Alteration
Curb cuts for proposed battery energy storage system building as per plans filed herewith. No change to use, egress, or occupancy.
B01366330-I1
02/18/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/30/2026
Permit issued — Sprinklers
B01340824-I1-EW-SP
01/23/2026
Permit issued — Structural
B01006778-S7-ST
01/21/2026
Special inspection requirement — Final
Christopher Drutjons
01/09/2026
Filed — Alteration
B01340824-I1
11/26/2025
Filed — Alteration CO
INSTALLATION OF (8) CONCRETE FOUNDATION PADS FOR (6) TESLA MEGA PACK 2XL BATTERY ENERGY STORAGE UNIT AND SUPPORTING EQUIOMENT. ALT1 APPLICATION #Q01006778-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01006778-P1
11/25/2025
Permit issued — Plumbing
B01006778-S8-PL
11/17/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ROBERT DYKSTRA
11/17/2025
Special inspection requirement — Final
Christopher Drutjons
11/17/2025
Special inspection requirement — Footing and Foundation
Christopher Drutjons
11/17/2025
Special inspection requirement — Concrete - Cast-In-Place
Christopher Drutjons
11/17/2025
Special inspection requirement — Designated Seismic System
09/26/2025
Filed — Alteration CO
INSTALLATION OF (8) CONCRETE FOUNDATION PADS FOR (6) TESLA MEGA PACK 2XL BATTERY ENERGY STORAGE UNIT AND SUPPORTING EQUIOMENT. ALT1 APPLICATION #Q01006778-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01006778-S8
09/16/2025
Objection resolved — Addressed
09/16/2025
Objection resolved — Addressed
09/15/2025
Objection raised — Admin
09/15/2025
Objection raised — Admin
09/08/2025
Filed — Alteration CO
INSTALLATION OF (8) CONCRETE FOUNDATION PADS FOR (6) TESLA MEGA PACK 2XL BATTERY ENERGY STORAGE UNIT AND SUPPORTING EQUIOMENT. ALT1 APPLICATION #Q01006778-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01006778-S7
07/30/2025
Permit issued — General Construction
B01006778-I1-GC
07/18/2025
Permit issued — Foundation
B01006778-S6-FO
06/25/2025
Filed — Alteration
Electric Energy Storage Equipment filing related to Alt CO application B01006778-I1.
B01238398-I1
06/25/2025
Objection raised — Admin
06/25/2025
Objection resolved — Addressed
06/23/2025
Filed — Alteration CO
INSTALLATION OF (8) CONCRETE FOUNDATION PADS FOR (6) TESLA MEGA PACK 2XL BATTERY ENERGY STORAGE UNIT AND SUPPORTING EQUIOMENT. ALT1 APPLICATION #Q01006778-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01006778-S6
09/16/2024
Filed — Alteration CO
INSTALLATION OF (8) CONCRETE FOUNDATION PADS FOR (6) TESLA MEGA PACK 2XL BATTERY ENERGY STORAGE UNIT AND SUPPORTING EQUIOMENT. ALT1 APPLICATION #Q01006778-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
B01006778-I1
09/12/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Christopher Drutjons
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedGrace Industries07/23/2026
DOB NOWSprinklersPermit IssuedWelkin Enterprises01/30/2026
DOB NOWStructuralSigned-offGrace Industries01/23/2026
DOB NOWPlumbingPermit IssuedWelkin Enterprises11/25/2025
DOB NOWGeneral ConstructionPermit IssuedGrace Industries07/30/2025
DOB NOWFoundationSigned-offGrace Industries07/18/2025
1 project · most recent 11/26/2025
Storm
FiledStatusContractorScope
11/26/2025Permit IssuedWelkin EnterprisesStorm
2 projects · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedHaugland Energy Group—
10/20/2025Permit IssuedHaugland Energy GroupGeneral Wiring
2 projects · most recent 10/09/2026
Steel Concrete
FiledStatusContractorScope
10/09/2026——2 scope_items
11/26/2025Signed-offGrace IndustriesSteel, Concrete
1 project · most recent 11/26/2025
Earthwork
FiledStatusContractorScope
11/26/2025Signed-offGrace IndustriesEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/06/2026Fail-Final SP - Up to 3 Requested FloorsFailView ↗
02/18/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/05/2026FinalChristopher Drutjonsprogress
04/20/2026FinalChristopher Drutjonsprogress
01/21/2026FinalChristopher Drutjonsprogress
11/17/2025Subsurface Conditions – Fill Placement & In-Place DensityROBERT DYKSTRAspecial
11/17/2025FinalChristopher Drutjonsprogress
11/17/2025Footing and FoundationChristopher Drutjonsprogress
11/17/2025Concrete - Cast-In-PlaceChristopher Drutjonsspecial
11/17/2025Designated Seismic System—special
09/12/2024Alternative Materials - OTCR Buildings Bulletin NumberChristopher Drutjonsspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Convergent Energy & PowerIndustrial / WarehouseFloor 1
Project B01366330 Alteration · Permit Entire · 03/30/2026
Project B01238398 Alteration · Plan Examiner Review · 06/25/2025
Project B01006778 Alteration CO · Permit Entire · 09/16/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026B01238398-P1Request digital key ↗
08/21/2026B01238398-I1Request digital key ↗
08/20/2026B01006778-S8Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
02/27/2026340922130Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01006778-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature10
10/11/2026B01238398-P2Open ↗
08/21/2026B01238398-I1Open ↗
08/21/2026B01238398-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
10/11/2026B01238398-P2Open ↗
08/31/2026B01238398-I1Open ↗
08/24/2026B01006778-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026B01006778-P1Open ↗
08/24/2026B01006778-P1Open ↗
08/24/2026B01006778-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01006778-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/20/2026B01006778-I1Open ↗