← Back
Two family brick
997 NEILL AVENUE
BRONX · Morris Park · BIN 2049019
💬 Discuss this project
1955Year Built
1Stories
B1Building Class
R4-1Zoning
1,415 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family brick · 2,500 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof4p · 2 filings · 14 docs
Floor 31p · 1 filing · 7 docs
Floor 22p · 2 filings · 14 docs
Floor 11p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/23/2022$895K—— → —$633/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL K. ADUAMAH ENGINEERING, PC207/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AM PROFESSIONALS103/21/2026
Building Lifecycle
All (29)Filed (2)Violation (1)Objection (18)Special Inspection (8)
08/18/2026
Objection resolved — Resolved
07/30/2026
Objection raised — Other
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/22/2026
Objection resolved — Resolved
07/15/2026
Objection raised — Other
07/15/2026
Objection raised — Other
07/15/2026
Objection raised — Other
07/15/2026
Objection raised — Other
07/15/2026
Objection raised — Other
07/15/2026
Objection raised — Other
07/15/2026
Objection raised — Other
07/02/2026
Filed — Alteration
Filing a job to use the rear porch as a sunroom and proposing the attic to be a livable space, and remove ECB violation# 39187200K as per plan. No change to use, egress, or occupancy under this application.
X01424859-I1
05/05/2026
Violation issued (ECB, open)
Construction
09/22/2025
Objection raised — Admin
06/12/2025
Objection raised — Admin
06/02/2025
Filed — Alteration
PROPOSED RENOVATION TO 2ND AND 3RD FLOOR APARTMENT WITH HORIZONTAL ADDITION TO 3RD FLOOR LEVEL. EXISTING 2 FAMILY NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
X01221147-I1
05/28/2025
Special inspection requirement — Fenestration areas
05/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/28/2025
Special inspection requirement — Air barrier - visual inspection
05/28/2025
Special inspection requirement — Interior lighting power
05/28/2025
Special inspection requirement — Fenestration air leakage
05/28/2025
Special inspection requirement — Insulation placement and R values
05/05/2025
Special inspection requirement — Final
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
05/28/2025Fenestration areas—energy_progress
05/28/2025Structural Stability – Alterations of existing buildings—special
05/28/2025Fire-Resistant Penetrations and Joints—special
05/28/2025Air barrier - visual inspection—energy_progress
05/28/2025Interior lighting power—energy_progress
05/28/2025Fenestration air leakage—energy_progress
05/28/2025Insulation placement and R values—energy_progress
05/05/2025Final—progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026X01221147-I1Request digital key ↗
08/14/2026X01424859-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026X01424859-I1Open ↗
08/13/2026X01221147-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026X01221147-I1Open ↗
08/16/2026X01424859-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026X01221147-I1Open ↗
08/14/2026X01424859-I1Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026X01424859-I1Open ↗
08/13/2026X01221147-I1Open ↗
▸DOB NOWPlot Diagram2
08/14/2026X01424859-I1Open ↗
08/13/2026X01221147-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/14/2026X01424859-I1Open ↗
08/13/2026X01221147-I1Open ↗