← Back
BuildNYC
Public elementary, junior or senior high
Franklin K Lane
999 JAMAICA AVENUE · BIN 3090738
💬 Discuss this project
1963Year Built
4Stories
W1Building Class
R3-2Zoning
405,440 sfGross Floor Area
1Units
LL97 Covered15 Active Violations 0 unresolved · 15 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 275,000 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical work boiler conversion ventilation2 filings · 20 docs
Penthouse1 filing · 20 docs
Floor 6Unit 6B1 filing · 20 docs
Floor 5Mechanical work boiler conversion ventilation2 filings · 20 docs
Floor 4Mechanical work boiler conversion ventilation2 filings · 20 docs
Floor 3Mechanical work boiler conversion ventilation2 filings · 20 docs
Floor 2Mechanical work boiler conversion ventilation2 filings · 20 docs
Floor 1K420 Franklin K. Lane High School Auditorium5 filings · 19 docs
CellarBrooklyn Lab School3 filings · 17 docs
Sub-BasementBrooklyn Lab School3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority9110/13/2026
NYC Department of Education1503/22/2026
National Grid103/21/2026
Division of School Facilities103/21/2026
Nycsa103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KM Associates of New York1403/21/2026
Angela Rivera603/21/2026
Superstructures Engineering + Architects203/21/2026
K & M Associates1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & S ElectricElectrical903/21/2026
Charan Electrical Enterp'sElectrical203/22/2026
R.M.F. ElectricElectrical103/21/2026
Gemini Electric CoElectrical103/22/2026
P & M Elect'l ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks3171505/10/2024
JPC Logistics Dba JPCL EN351110/17/2022
Future Tech Consultants O589307/13/2022
Building Lifecycle
All (136)Filed (27)Violation (60)Objection (19)Special Inspection (30)
09/08/2026
Filed — Alteration
Plumbing work related to walk in refrigerator and freezer for K420 as shown herewith on drawings. No change to use, occupancy, or egress.
B01440623-S1
09/04/2026
Filed — Alteration
Plumbing work related to walk in refrigerator and freezer for K420 as shown herewith on drawings. No change to use, occupancy, or egress.
B01440623-S2
09/04/2026
Filed — Alteration
Plumbing work related to walk in refrigerator and freezer for K420 as shown herewith on drawings. No change to use, occupancy, or egress.
B01440623-I1
08/31/2026
Special inspection requirement — Maintenance information
08/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/04/2026
Special inspection requirement — Post-installed Anchors
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
08/04/2026
Special inspection requirement — Final
08/04/2026
Special inspection requirement — Post-installed Anchors
08/04/2026
Special inspection requirement — Post-installed Anchors
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/04/2026
Special inspection requirement — Concrete - Cast-In-Place
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/04/2026
Special inspection requirement — Mechanical Systems
04/29/2026
Violation issued (ECB, open)
Construction
04/29/2026
Violation issued (ECB, open)
Construction
04/29/2026
Violation issued (ECB, open)
Construction
04/29/2026
Violation issued (ECB, open)
Construction
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/04/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
03/02/2026
Violation issued (FDNY_ORDER, closed)
08/27/2025
Violation issued (FDNY_ORDER, closed)
08/27/2025
Violation issued (FDNY_ORDER, closed)
06/06/2025
Violation issued (FDNY_ORDER, closed)
05/22/2025
Violation issued (ECB, open)
Construction
05/22/2025
Violation issued (ECB, open)
Construction
05/22/2025
Violation issued (ECB, open)
Construction
05/22/2025
Violation issued (ECB, open)
Construction
04/23/2025
Violation issued (ECB, closed)
Construction
02/26/2025
Violation issued (FDNY_ORDER, closed)
02/14/2025
Violation issued (FDNY_ORDER, closed)
02/14/2025
Violation issued (FDNY_ORDER, closed)
02/14/2025
Violation issued (FDNY_ORDER, closed)
10/22/2024
Violation issued (FDNY_ORDER, closed)
10/22/2024
Violation issued (FDNY_ORDER, closed)
10/22/2024
Violation issued (FDNY_ORDER, closed)
08/29/2024
Filed — Alteration
B00955757-I1
05/10/2024
Filed — Alteration
Mechanical work related to to Electrification, heat pump system, low voltage electrical systems and electrical service upgrade for K420
B01015754-S7
05/10/2024
Filed — Alteration
Mechanical work related to to Electrification, heat pump system, low voltage electrical systems and electrical service upgrade for K420
B01015754-Z2
05/10/2024
Filed — Alteration
Mechanical work related to to Electrification, heat pump system, low voltage electrical systems and electrical service upgrade for K420
B01015754-S9
05/10/2024
Filed — Alteration
Mechanical work related to to Electrification, heat pump system, low voltage electrical systems and electrical service upgrade for K420
B01015754-S5
05/10/2024
Filed — Alteration
Mechanical work related to to Electrification, heat pump system, low voltage electrical systems and electrical service upgrade for K420
B01015754-Z1
05/10/2024
Filed — Alteration
Mechanical work related to to Electrification, heat pump system, low voltage electrical systems and electrical service upgrade for K420
B01015754-S6
05/10/2024
Filed — Alteration
Mechanical work related to to Electrification, heat pump system, low voltage electrical systems and electrical service upgrade for K420
B01015754-Z3
05/10/2024
Filed — Alteration
Mechanical work related to to Electrification, heat pump system, low voltage electrical systems and electrical service upgrade for K420
B01015754-Z4
05/10/2024
Filed — Alteration
Mechanical work related to to Electrification, heat pump system, low voltage electrical systems and electrical service upgrade for K420
B01015754-S8
05/10/2024
Objection raised — Other
05/10/2024
Objection resolved — Addressed
05/10/2024
Objection raised — Other
05/10/2024
Objection resolved — Addressed
05/10/2024
Objection resolved — Addressed
05/10/2024
Objection resolved — Addressed
05/10/2024
Objection resolved — Addressed
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDAdam's European Contracting03/14/2025
BISOTISSUEDAdam's European Contracting03/08/2024
BISMHISSUEDTameer06/08/2023
BISOTISSUEDAdam's European Contracting03/16/2023
BISOTISSUEDAdam's European Contracting03/16/2023
BISOTISSUEDAdam's European Contracting03/16/2023
BISPLISSUEDVarsity Plumbing and Heating10/24/2022
BISMHISSUEDAir-Tek Mechanical08/09/2022
BISPLISSUEDForsythe P&H07/29/2022
BISMHISSUEDTameer06/15/2022
BISOTISSUEDWDF06/09/2022
BISOTISSUEDAdam's European Contracting03/19/2022
BISOTISSUEDAdam's European Contracting03/19/2022
BISOTISSUEDAdam's European Contracting03/18/2022
BISPLISSUEDVarsity Plumbing and Heating10/28/2021
BISMHISSUEDAir-Tek Mechanical08/24/2021
BISMHISSUEDAir-Tek Mechanical06/29/2021
BISOTISSUEDAdam's European Contracting06/29/2021
BISPLISSUEDForsythe P&H06/29/2021
BISOTISSUEDAdam's European Contracting03/16/2021
BISOTISSUEDAdam's European Contracting03/16/2021
BISMHISSUEDTameer01/14/2021
BISPLISSUEDVarsity Plumbing and Heating10/30/2020
BISEQISSUEDAdam's European Contracting10/27/2020
BISEQISSUEDAdam's European Contracting10/27/2020
BISEQISSUEDAdam's European Contracting10/27/2020
BISMHISSUEDTameer10/19/2020
BISOTISSUEDWDF06/01/2020
BISOTISSUEDAdam's European Contracting03/19/2020
BISOTISSUEDAdam's European Contracting03/19/2020
BISEQISSUEDAdam's European Contracting01/27/2020
BISPLISSUEDVarsity Plumbing and Heating11/21/2019
BISOTISSUEDWDF06/05/2019
BISOTISSUEDAdam's European Contracting03/20/2019
BISOTISSUEDAdam's European Contracting03/20/2019
BISOTISSUEDAdam's European Contracting12/31/2018
BISMHISSUEDTameer12/31/2018
BISPLISSUEDVarsity Plumbing and Heating12/31/2018
BISOTISSUEDAdam's European Contracting12/31/2018
BISOTISSUEDWDF12/20/2018
+ 10 more permits on file
3 projects · most recent 09/08/2026
Heating and Air Conditioning Systems Ventilation Systems Refrigeration Systems Air Conditioning Systems Heating Systems Others
FiledStatusContractorScopeMake / Model / Capacity
09/08/2026——Refrigeration Systems
Refrigeration
__Junk__ YF13KAE 13,585 BTU · Refrigeration Unit ×2
YS11KAE 12,257 BTU · Refrigeration Unit ×2
05/10/2024——Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems—
08/18/2022——Heating and Air Conditioning Systems, Heating Systems, Others, Ventilation Systems
Other
Lg ×14
1 project · most recent 05/10/2024
Sprinkler System
FiledStatusContractorScope
05/10/2024——Sprinkler System
2 projects · most recent 09/08/2026
Water/Sanitary Storm
FiledStatusContractorScope
09/08/2026——Water/Sanitary
05/10/2024——Storm, Water/Sanitary
25 projects · most recent 04/13/2026
General Wiring Lighting
FiledStatusContractorScope
04/13/2026Permit IssuedCharan Electrical Enterp'sGeneral Wiring
10/22/2025CompleteKLK ElectricGeneral Wiring
10/07/2025CompleteJamcob ElectricGeneral Wiring
05/13/2025CompleteGemini Electric Co—
01/02/2025Permit IssuedGemini Electric CoGeneral Wiring
11/04/2024CompleteCharan Electrical Enterp's—
09/06/2023CancelledCharan Electrical Enterp'sGeneral Wiring
05/09/2023CompleteCharan Electrical Enterp's—
01/05/2023CompleteCharan Electrical Enterp'sGeneral Wiring
08/15/2022CompleteCharan Electrical Enterp's—
05/09/2022Permit IssuedGemini Electric CoGeneral Wiring
09/08/2021Permit IssuedCharan Electrical Enterp'sGeneral Wiring
08/12/2021Permit IssuedR.M.F. ElectricGeneral Wiring
07/02/2021Permit IssuedP & M Elect'l ContractingGeneral Wiring
06/14/2021CompleteCharan Electrical Enterp's—
3 projects · most recent 05/10/2024
Concrete Steel Masonry
FiledStatusContractorScope
05/10/2024——Steel, Concrete
11/02/2023——Concrete
08/18/2022——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
08/31/2026HVAC-R and service water piping design and insulation—energy_progress
08/31/2026HVAC-R and service water heating system controls—energy_progress
08/31/2026HVAC-R and service water heating equipment—energy_progress
08/31/2026Maintenance information—energy_progress
08/04/2026Energy Code Compliance Inspections—progress
08/04/2026Post-installed Anchors—special
08/04/2026Fire-Resistant Penetrations and Joints—special
08/04/2026Post-installed Anchors—special
08/04/2026Final—progress
08/04/2026Fire-Resistant Penetrations and Joints—special
08/04/2026Post-installed Anchors—special
08/04/2026Concrete - Cast-In-Place—special
08/04/2026Mechanical Systems—special
08/04/2026Fire-Resistant Penetrations and Joints—special
05/10/2024Sprinkler SystemsMIKHAIL ZEYGMANspecial
05/10/2024Post-installed AnchorsMIKHAIL ZEYGMANspecial
05/10/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
05/10/2024Heating SystemsMIKHAIL ZEYGMANspecial
05/03/2024FinalMIKHAIL ZEYGMANprogress
05/03/2024Sprayed fire-resistant materialsMIKHAIL ZEYGMANspecial
05/03/2024Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
05/03/2024Mechanical SystemsMIKHAIL ZEYGMANspecial
04/23/2024Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
04/23/2024Subgrade InspectionsMIKHAIL ZEYGMANspecial
03/18/2024FinalMIKHAIL ZEYGMANprogress
Latest 25 of 79.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brooklyn Lab SchoolEducationCellar, Sub-basement
Project B01440623 Alteration · Approved · 09/04/2026
K420 Franklin K. Lane High School AuditoriumEducationFloor 1
Project B00955757 Alteration · Incomplete · 08/29/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 266 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
10/13/2026B01440623-S1Request digital key ↗
10/13/2026B01440623-S2Request digital key ↗
10/13/2026B01440623-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
02/08/2023340878795Open ↗
07/25/2019340689730Open ↗
04/23/2019340610253Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
08/14/2019340689730Open ↗
12/06/2018340610253Open ↗
07/25/2017340516454Open ↗
▸Seals & Professional Certifications88
▸DOB NOWSpecial Inspector Seal & Signature36
09/25/2026B01015754-S9Open ↗
08/27/2026B01015754-S6Open ↗
08/27/2026B01015754-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
10/13/2026B01440623-S2Open ↗
10/13/2026B01440623-I1Open ↗
10/13/2026B01440623-S1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/25/2026B01015754-S9Open ↗
08/27/2026B01015754-S6Open ↗
08/27/2026B01015754-I1Open ↗
Showing 3 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
02/08/2023340878795Open ↗
07/25/2019340689730Open ↗
06/06/2018340610253Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/08/2023340878795Open ↗
07/25/2019340689730Open ↗
06/06/2018340610253Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/25/2019340689730Open ↗
06/06/2018340610253Open ↗
06/22/2017340516454Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/16/2019340689730Open ↗
09/20/2017340516454Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
06/06/2018340610253Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/08/2023340878795Open ↗
12/06/2018340610253Open ↗
07/25/2017340516454Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
08/15/2019340689730Open ↗
06/06/2018340610253Open ↗
06/22/2017340516454Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/08/2023340878795Open ↗
07/25/2019340689730Open ↗
06/06/2018340610253Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/25/2019340689730Open ↗
06/06/2018340610253Open ↗
06/22/2017340516454Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
10/16/2019340689730Open ↗
04/29/2019340610253Open ↗
09/20/2017340516454Open ↗
▸BISNYCECC ANALYSIS3
07/25/2019340689730Open ↗
06/06/2018340610253Open ↗
06/22/2017340516454Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/16/2019340689730Open ↗
09/20/2017340516454Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/08/2023340878795Open ↗
07/25/2019340689730Open ↗
06/06/2018340610253Open ↗
Showing 3 of 4 on file for this type
▸BIS2008 CODE TR1 REQUIRED1
06/06/2018340610253Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00953479-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00953479-S1Open ↗
▸Approvals, Objections & Sign-offs55
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
10/13/2026B01440623-S1Open ↗
10/13/2026B01440623-I1Open ↗
10/13/2026B01440623-S2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
10/13/2026B01440623-S2Open ↗
10/13/2026B01440623-S1Open ↗
10/13/2026B01440623-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
12/06/2019340689730Open ↗
11/15/2019340689730Open ↗
10/23/2019340689730Open ↗
Showing 3 of 7 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)4
02/08/2023340878795Open ↗
07/25/2019340689730Open ↗
06/06/2018340610253Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B00953479-S1Open ↗
08/13/2026B00953479-I1Open ↗
08/13/2026B00780984-I1Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
02/08/2023340878795Open ↗
12/06/2019340689730Open ↗
12/06/2019340689730Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms17
▸BISBOROUGH INTAKE FORM8
12/06/2019340689730Open ↗
12/06/2019340689730Open ↗
11/15/2019340689730Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION5
10/16/2019340689730Open ↗
05/15/2019340610253Open ↗
04/29/2019340610253Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
02/08/2023340878795Open ↗
07/25/2019340689730Open ↗
06/06/2018340610253Open ↗
Showing 3 of 4 on file for this type
▸Other Documents32
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal27
10/13/2026B01440623-S1Open ↗
10/13/2026B01440623-S2Open ↗
10/13/2026B01440623-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProof of Historic Building4
08/13/2026B00718949-I1Open ↗
08/13/2026B00953479-I1Open ↗
08/13/2026B00955757-I1Open ↗
Showing 3 of 4 on file for this type
▸BISUnknown1
04/29/2019340610253Open ↗