Bungalow colony - cooperatively owned land
99B EDGEWATER PARK
BRONX · BIN 2101815
💬 Discuss this project
1915Year Built
1Stories
A8Building Class
R4AZoning
76,778 sfGross Floor Area
62Units
LL97 Covered0 Open Violations
Bungalow colony - cooperatively owned land · 110,000 sf lot · 0.7 FAR built · Flood zone X500
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/19/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/19/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/24/2026
Permit issued — Solar
X01446914-I1-SL
08/19/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01446914-I1
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/19/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/17/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC08/24/2026
1 project · most recent 08/19/2026
FiledStatusContractorScope
08/19/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 08/19/2026
FiledStatusContractorScope
08/19/2026Permit IssuedSUNRUN INSTALLATION SVC27 panels, 12.15 kw, 189.2 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/19/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/19/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/17/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/17/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/17/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026X01446914-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026X01446914-I1Open ↗
08/30/2026X01446914-I1Open ↗
08/30/2026X01446914-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026X01446914-I1Open ↗
08/30/2026X01446914-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026X01446914-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026X01446914-I1Open ↗