← Back
Military and naval installation
ANDES ROAD
MANHATTAN · BIN 1086429
💬 Discuss this project
0Year Built
—Stories
Y4Building Class
R3-2Zoning
8,445 sfGross Floor Area
1Units
Military and naval installation · Owner of record: GOVERNORS ISLAND CORPORATION · 7,225 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction56p · 2 filings · 20 docs
Floor 3Under Construction74p · 3 filings · 20 docs
Floor 2Under Construction74p · 2 filings · 20 docs
Floor 1Under Construction75p · 3 filings · 20 docs
BasementUnder Construction75p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRUST FOR GOVERNORS ISLAND6909/13/2026
NOBLE CONSTRUCTION GROUP LLC407/08/2026
OWNERS REP1304/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.3203/21/2026
AE DESIGN SOLUTION1203/21/2026
GEIGER E A GROUP203/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOBLE CONSTRUCTION GR LLCGeneral Contractor2607/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor804/09/2026
HEADQUARTERS MECH INCPlumbing507/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor207/08/2026
WNW & SONS PLUMBING & HTGFire Protection207/08/2026
STATE CONTRACTING CORP NYGeneral Contractor104/09/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004605/15/2026
MEP INSPECTIONS, INC1102305/15/2026
METRIC CONSULTING AND INS1803804/28/2026
DOMANI INSPECTION SERVICE843409/14/2022
Building Lifecycle
All (147)Filed (32)Permit Issued (30)Signed Off (14)Inspection (18)Objection (23)Special Inspection (30)
09/01/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Installation of sprinkler system related to conversion.
M01068543-S5
08/26/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Installation of sprinkler system related to conversion.
M01068543-S4
08/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/10/2026
Signed off — Alteration
INSTALLATION OF CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00713366-I1
08/10/2026
Signed off — Alteration
INSTALLATION OF PYLWOOD FENCE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01145732-I1
08/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2026
Signed off — Alteration
Temporary Shoring & partial demo in conjunction with application # M01068543-I1
M01194023-I1
07/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01165195-I1
07/24/2026
Signed off — Alteration
M01165770-I1
07/24/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01165779-I1
07/16/2026
Special inspection requirement — Sprayed fire-resistant materials
SAMI HAJJAR P.E
07/16/2026
Special inspection requirement — Fenestration areas
Robert Henry
07/16/2026
Special inspection requirement — Air barrier - visual inspection
Robert Henry
07/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
07/16/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
ERIC BERLENT
07/16/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SAMI HAJJAR P.E
07/16/2026
Special inspection requirement — Fenestration air leakage
Robert Henry
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
07/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Henry
07/16/2026
Special inspection requirement — Insulation placement and R values
Robert Henry
07/08/2026
Signed off — Alteration
M00615504-I1
07/08/2026
Signed off — Alteration
Removal of temporary structure which was filed under M00679164. Entire structure including spread footings to be removed.
M01132536-I1
06/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of sprinkler system related to conversion.
M01068543-P7
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
06/05/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
05/20/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/15/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of sprinkler system related to conversion.
M01068543-P6
05/15/2026
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
05/14/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of sprinkler system related to conversion.
M01068543-P5
04/14/2026
Objection raised — Cost
04/10/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of sprinkler system related to conversion.
M01068543-P1
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
03/26/2026
Special inspection requirement — Shutoff dampers
Robert Henry
03/26/2026
Special inspection requirement — Heating Systems
ERIC BERLENT
03/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Robert Henry
03/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Henry
03/26/2026
Special inspection requirement — Heating Systems
ERIC BERLENT
03/26/2026
Special inspection requirement — Final
ERIC BERLENT
03/26/2026
Special inspection requirement — Mechanical Systems
ERIC BERLENT
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
03/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Robert Henry
03/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of sprinkler system related to conversion.
M01068543-P2
03/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of sprinkler system related to conversion.
M01068543-P4
03/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Installation of sprinkler system related to conversion.
M01068543-P3
03/13/2026
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
03/13/2026
Special inspection requirement — Deep Foundation Elements
SAMI HAJJAR P.E
03/13/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
03/13/2026
Special inspection requirement — Sprayed fire-resistant materials
SAMI HAJJAR P.E
03/13/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
01/29/2026
Permit issued — Sprinklers
M01068543-S4-EW-SP
01/28/2026
Permit issued — Construction Fence
M01165195-I1-FN
01/27/2026
Permit issued — Sidewalk Shed
M01165770-I1-SH
01/22/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01165195-P2
01/22/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offWNW & SONS PLUMBING & HTG01/29/2026
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC01/28/2026
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/27/2026
DOB NOWStructuralSigned-offNOBLE CONSTRUCTION GR LLC01/09/2026
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC01/09/2026
DOB NOWPlumbingSigned-offHEADQUARTERS MECH INC01/08/2026
DOB NOWPlumbingPermit IssuedHEADQUARTERS MECH INC01/08/2026
DOB NOWGeneral ConstructionPermit IssuedNOBLE CONSTRUCTION GR LLC01/05/2026
DOB NOWMechanical SystemsSigned-offNOBLE CONSTRUCTION GR LLC01/05/2026
DOB NOWGeneral ConstructionSigned-offSTATE CONTRACTING CORP NY03/25/2025
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC01/27/2025
DOB NOWSupport of ExcavationSigned-offNOBLE CONSTRUCTION GR LLC01/24/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/14/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC01/14/2025
DOB NOWFoundationSigned-offNOBLE CONSTRUCTION GR LLC01/09/2025
DOB NOWSprinklersSigned-offWNW & SONS PLUMBING & HTG01/08/2025
DOB NOWPlumbingSigned-offHEADQUARTERS MECH INC01/08/2025
DOB NOWPlumbingPermit IssuedHEADQUARTERS MECH INC01/08/2025
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC11/21/2024
DOB NOWMechanical SystemsSigned-offNOBLE CONSTRUCTION GR LLC11/20/2024
DOB NOWGeneral ConstructionPermit IssuedNOBLE CONSTRUCTION GR LLC11/18/2024
DOB NOWGeneral ConstructionSigned-offNOBLE CONSTRUCTION GR LLC11/04/2024
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC08/22/2024
DOB NOWGeneral ConstructionSigned-offNOBLE CONSTRUCTION GR LLC09/27/2022
DOB NOWFoundationSigned-offNOBLE CONSTRUCTION GR LLC06/09/2022
DOB NOWPlumbingSigned-offHEADQUARTERS MECH INC06/02/2022
DOB NOWGeneral ConstructionSigned-offNOBLE CONSTRUCTION GR LLC05/25/2022
DOB NOWMechanical SystemsSigned-offNOBLE CONSTRUCTION GR LLC04/27/2022
DOB NOWGeneral ConstructionSigned-offNOBLE CONSTRUCTION GR LLC04/26/2022
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING04/12/2022
BISOTISSUEDNOBLE CONSTRUCTION GR LLC08/22/2022
1 project · most recent 06/09/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026Signed-offNOBLE CONSTRUCTION GR LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Samsung AM036TXMDCH/AA ACCU-2 SERVES : AC-2-1, AC-2-2 3 tons · Condensing Unit ×2
AM360BXVGJR/AA ACCU-1 SERVES : AC-1-1, AC-1-2, AC-1-3, AC-1-4, AC-1-5, AC-1-6, AC-1-7, AC-1-8, AC-1-9, AC-1-10,AC-1-11, AC-1-12, AC-1-13, AC-1-14, AC-1-15, AC-1-16 30 tons · Condensing Unit ×2
AR36BSHUMGMXCV ACCU-3 SERVES : AC-3-1 40,000 BTU ×2
Ventilation
— DS-015 460 CFM · Ahu ×2
Dectron DS-030 680 CFM · Ahu ×2
1 project · most recent 06/09/2026
Sprinkler System
FiledStatusContractorScope
06/09/2026Signed-offHQ FIRE PROTECTION INCSprinkler System
1 project · most recent 06/09/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/09/2026Permit IssuedHEADQUARTERS MECH INCStorm, Water/Sanitary
5 projects · most recent 04/09/2026
General Wiring
FiledStatusContractorScope
04/09/2026CompleteL.E.A. ELECTRIC CORP.General Wiring
07/17/2025CompleteDENALI ELECTRIC CORP—
06/17/2025Permit IssuedL.E.A. ELECTRIC CORP.General Wiring
01/15/2025CompleteSOLAS ELECTRICAL CORP—
06/15/2022CompleteL.E.A. ELECTRIC CORP.General Wiring
2 projects · most recent 06/09/2026
FiledStatusContractorScope
06/09/2026Signed-offHQ FIRE PROTECTION INC3 scope_items
03/14/2025Signed-offSTATE CONTRACTING CORP NY1 scope_items
4 projects · most recent 01/22/2026
Fence Scaffold
FiledStatusContractorScope
01/22/2026Signed-offCORE SCAFFOLD SYSTEMS INCFence
02/26/2025Signed-offCORE SCAFFOLD SYSTEMS INCScaffold
11/21/2024Signed-offMC SUPERSTRUCTURE INCFence
04/11/2022Signed-offMC SUPERSTRUCTURE INCFence
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2026Pass-Final PL - UndergroundPassView ↗
05/14/2026Pass-Final PL - UndergroundPassView ↗
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/10/2026Pass-Final PL - UndergroundPassView ↗
01/22/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/05/2025Fail-Final CND-Occupancy InspectionFailView ↗
09/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/20/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
07/16/2026Fenestration areasRobert Henryenergy_progress
07/16/2026Fire-Resistance Rated ConstructionERIC BERLENTprogress
07/16/2026Sprayed fire-resistant materialsSAMI HAJJAR P.Especial
07/16/2026Mastic and Intumescent Fire-resistant CoatingsERIC BERLENTspecial
07/16/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)SAMI HAJJAR P.Especial
07/16/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
07/16/2026Fenestration and door U-factor and product ratingsRobert Henryenergy_progress
07/16/2026Insulation placement and R valuesRobert Henryenergy_progress
07/16/2026Fenestration air leakageRobert Henryenergy_progress
07/16/2026Air barrier - visual inspectionRobert Henryenergy_progress
06/05/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
06/05/2026Sprinkler SystemsNicolas Crosettospecial
05/15/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
05/15/2026Sprinkler SystemsNicolas Crosettospecial
03/26/2026FinalERIC BERLENTprogress
03/26/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/26/2026Heating SystemsERIC BERLENTspecial
03/26/2026Heating SystemsERIC BERLENTspecial
03/26/2026Mechanical SystemsERIC BERLENTspecial
03/26/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/26/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/26/2026HVAC-R and service water heating system controlsRobert Henryenergy_progress
03/26/2026HVAC-R and service water piping design and insulationRobert Henryenergy_progress
03/26/2026HVAC-R and service water heating equipmentRobert Henryenergy_progress
03/26/2026Shutoff dampersRobert Henryenergy_progress
Latest 25 of 89.
▾Documents — 185 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch33
09/03/2026M00615504-I1Request digital key ↗
09/02/2026M00713366-I1Request digital key ↗
09/02/2026M00679164-S2Request digital key ↗
Showing 3 of 33 on file for this type
▸Applications & Permits24
▸DOB NOWLPC Approval/Permit18
09/02/2026M00679164-I1Open ↗
09/02/2026M00679164-S2Open ↗
09/02/2026M00679164-S3Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
09/27/2022141008665Open ↗
09/26/2022141008665Open ↗
09/01/2022141008665Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
08/22/2022141008665Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026M01068543-P1Open ↗
08/13/2026M01068543-I1Open ↗
▸BISFLOOD ZONE COMPLIANCE1
08/24/2022141008665Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
04/15/2022141008665Open ↗
▸Seals & Professional Certifications84
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/02/2026M00679164-I1Open ↗
09/02/2026M00679164-S1Open ↗
09/02/2026M00679164-S2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/11/2026M01068543-I1Open ↗
09/11/2026M01068543-I1Open ↗
09/11/2026M01068543-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/11/2026M01068543-I1Open ↗
09/01/2026M01068543-I1Open ↗
09/01/2026M01068543-S2Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/15/2022141008665Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/15/2022141008665Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/15/2022141008665Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
08/17/2026M01068543-S2Open ↗
08/17/2026M01068543-S1Open ↗
08/17/2026M01068543-S3Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT1
08/13/2026M01068543-S6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M01068543-S6Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026M01068543-S1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLANDMARKS SIGNOFF1
08/25/2022141008665Open ↗
▸BISLANDMARKS APPROVAL1
04/15/2022141008665Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00615504-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
04/15/2022141008665Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/16/2022141008665Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
09/27/2022141008665Open ↗
09/01/2022141008665Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/15/2022141008665Open ↗
▸Other Documents19
▸DOB NOWFlood Plan Emergency Temporary Flood Shields10
08/24/2026M01194023-I1Open ↗
08/17/2026M01068543-S7Open ↗
08/17/2026M01068543-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSite Survey: Initial6
08/17/2026M01068543-P7Open ↗
08/13/2026M01068543-S7Open ↗
08/13/2026M01068543-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification3
08/17/2026M01068543-I1Open ↗
08/17/2026M01068543-P1Open ↗
08/17/2026M01068543-P7Open ↗