← Back
Large suburban residence
ANDREWS AVENUE
STATEN ISLAND · BIN 5175148
💬 Discuss this project
2022Year Built
2Stories
A3Building Class
R1-2Zoning
3,122 sfGross Floor Area
1Units
Large suburban residence · 6,500 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralCivilGeneral
Roof4p · 1 filing · 11 docs
Floor 218p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Basement18p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NIRO2307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC210/13/2025
TONY SAYAD ARCHITECT612/01/2022
C&P DESIGN CONSULTANTS110/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R SOLAR DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NIRO INCGeneral Contractor1007/08/2026
AMBER ELECTRICAL CONTRACTGeneral Contractor107/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244210/13/2025
SRA PLANNING & EXPEDITING5677312/01/2022
Building Lifecycle
All (60)Filed (9)Permit Issued (6)Signed Off (4)Inspection (9)Objection (2)Special Inspection (30)
10/16/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
S01109675-I1
10/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/15/2025
Special inspection requirement — Final
NARESH MAHANGU
10/15/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
10/15/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
10/13/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
S01109675-P1
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
09/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
09/18/2025
Special inspection requirement — Final
NARESH MAHANGU
09/18/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
07/25/2025
Permit issued — Solar
S01109675-I1-SL
02/07/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
S01109675-I1
06/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/26/2022
Signed off — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-S2
12/22/2022
Signed off — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-S1
12/21/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/21/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/20/2022
Signed off — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-S3
12/08/2022
Objection raised — Scope
12/08/2022
Objection resolved — Addressed
12/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2022
Filed — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-P3
11/22/2022
Filed — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-P2
11/22/2022
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Structural Steel - Details
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Wood – Prefabricated I-Joists
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Final
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
11/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
11/17/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/16/2022
Filed — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-P1
11/04/2022
Permit issued — Foundation
S00564693-S3-FO
10/26/2022
Permit issued — Earth Work
S00564693-I1-GC-CX
10/25/2022
Permit issued — Curb Cut
S00564693-S1-CC
09/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/30/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/20/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/23/2021
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/17/2021
Permit issued — Plumbing
S00564693-S2-PL
10/06/2021
Filed — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-S3
09/20/2021
Permit issued — General Construction
S00564693-I1-GC-CX
08/24/2021
Filed — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-S2
08/20/2021
Filed — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-S1
08/14/2021
Filed — New Building
PROPOSED CURB CUT IN CONJUNCTION WITH NEW ONE-FAMILY RESIDENCE FILED UNDER THIS APPLICATION
S00564693-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMBER ELECTRICAL CONTRACT07/25/2025
DOB NOWFoundationSigned-offNIRO INC11/04/2022
DOB NOWEarth WorkPermit IssuedNIRO INC10/26/2022
DOB NOWCurb CutSigned-offNIRO INC10/25/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR11/17/2021
DOB NOWGeneral ConstructionPermit IssuedNIRO INC09/20/2021
BISOTISSUEDSOLANTA CORP05/04/2022
1 project · most recent 12/01/2022
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/01/2022Signed-offNIRO INCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Comfort Aire RSF1342SIM 86,000 BTU · Condensing Unit ×2
Heating
Triangle Tube INSTINCT INS199C 199,000 BTU · Boiler ×1
Ventilation
Fantech HERO 200H 210 CFM · Erv ×1
Ducts & Piping
Southwark Metal G-60 COATED GALVANIZED STEEL 24 GA. 2,950 CFM · Ductwork ×1
1 project · most recent 12/01/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/01/2022Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
3 projects · most recent 10/14/2024
General Wiring
FiledStatusContractorScope
10/14/2024CompleteAMBER ELECTL CONTNG INC—
09/02/2022CompleteD AND H ELECTRICAL CONST—
02/09/2022CompleteD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 12/01/2022
Steel Wood
FiledStatusContractorScope
12/01/2022Signed-offNIRO INCSteel, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/21/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/21/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
12/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2021Pass-Final PL - UndergroundPassView ↗
11/23/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
10/15/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
10/15/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/15/2025FinalNARESH MAHANGUprogress
10/15/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
10/15/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
09/18/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
09/18/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
09/18/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
09/18/2025FinalNARESH MAHANGUprogress
09/18/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
11/22/2022Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
11/22/2022Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
11/22/2022Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
11/22/2022Mechanical SystemsWILLIAM MONTAGUEspecial
11/22/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
11/22/2022Structural Steel - DetailsWILLIAM MONTAGUEspecial
11/22/2022Subgrade InspectionsWILLIAM MONTAGUEspecial
11/22/2022Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
11/22/2022Wood – Prefabricated I-JoistsWILLIAM MONTAGUEspecial
11/22/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
11/22/2022FinalWILLIAM MONTAGUEprogress
11/22/2022Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
11/22/2022Footing and FoundationWILLIAM MONTAGUEprogress
11/22/2022Structural Wood FrameWILLIAM MONTAGUEprogress
11/22/2022Interior lighting powerWILLIAM MONTAGUEenergy_progress
Latest 25 of 45.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026S00564693-I1Request digital key ↗
08/25/2026S00564693-S1Request digital key ↗
08/25/2026S00564693-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/22/2022540215872Open ↗
▸BISWORK PERMIT APPLICATION1
05/04/2022540215872Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026S00564693-P3Open ↗
08/13/2026S00564693-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 22
08/13/2026S00564693-P3Open ↗
08/13/2026S00564693-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00564693-P3Open ↗
08/13/2026S00564693-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00564693-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00564693-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026S00564693-I1Open ↗
08/25/2026S00564693-S1Open ↗
08/25/2026S00564693-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026S01109675-I1Open ↗
09/02/2026S01109675-I1Open ↗
08/26/2026S00564693-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026S01109675-I1Open ↗
08/26/2026S00564693-S3Open ↗
08/26/2026S00564693-S3Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/22/2022540215872Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00564693-P3Open ↗
08/13/2026S00564693-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/25/2026S00564693-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist2
08/25/2026S00564693-I1Open ↗
08/14/2026S00564693-P3Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
04/22/2022540215872Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00564693-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00564693-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00564693-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/23/2022540215872Open ↗
04/22/2022540215872Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/23/2022540215872Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/22/2022540215872Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
12/23/2022540215872Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00564693-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/23/2022540215872Open ↗
04/22/2022540215872Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S00564693-P3Open ↗
08/13/2026S00564693-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00564693-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026S00564693-S3Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00564693-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISFINAL ELECTRICAL SIGNOFF1
12/27/2022540215872Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/27/2022540215872Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01109675-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
12/23/2022540215872Open ↗
▸BISCOST AFFIDAVIT1
04/22/2022540215872Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
04/22/2022540215872Open ↗
▸BISADDITIONAL INFORMATION1
05/03/2022540215872Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification4
08/25/2026S00564693-S1Open ↗
08/25/2026S00564693-S2Open ↗
08/25/2026S00564693-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00564693-I1Open ↗
08/13/2026S00564693-P3Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00564693-I1Open ↗
08/13/2026S00564693-P3Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/27/2022540215872Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00564693-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00564693-I1Open ↗