Large suburban residence
ANDREWS AVENUE
STATEN ISLAND · BIN 5175150
💬 Discuss this project
2022Year Built
2Stories
A3Building Class
R1-2Zoning
3,122 sfGross Floor Area
1Units
Large suburban residence · 6,400 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 217p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Basement15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRIDLE ESTATES2607/08/2026
NIRO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TONY SAYAD ARCHITECT911/03/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NIRO INCGeneral Contractor903/21/2026
D AND H ELECTRICAL CONSTElectrical103/22/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677811/03/2022
Building Lifecycle
All (54)Filed (9)Permit Issued (4)Signed Off (2)Inspection (9)Special Inspection (30)
12/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2022
Signed off — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-S2
11/20/2022
Signed off — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-S1
11/18/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/15/2022
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Ventilation and air distribution system
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Fireplaces
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Final
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
11/15/2022
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
11/03/2022
Filed — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-P8
11/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
11/03/2022
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
11/02/2022
Filed — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-P9
10/28/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/28/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/25/2022
Permit issued — Mechanical Systems
S00597133-I1-GC-CX
10/25/2022
Permit issued — Curb Cut
S00597133-S1-CC
10/21/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/22/2022
Filed — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-P7
06/22/2022
Filed — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-P6
06/13/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/08/2022
Filed — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-P5
05/20/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/04/2022
Filed — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-P1
03/17/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/03/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/24/2022
Permit issued — Plumbing
S00597133-S2-PL
02/22/2022
Permit issued — Foundation
S00597133-I1-GC-CX
01/19/2022
Filed — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-S2
01/18/2022
Filed — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-S1
01/18/2022
Filed — New Building
PROPOSED NEW 2-STORY AND BASEMENT ONE-FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO-CAR GARAGE AND OFF-STREET PARKING FOR ONE CAR
S00597133-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNIRO INC10/25/2022
DOB NOWCurb CutSigned-offNIRO INC10/25/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR02/24/2022
DOB NOWFoundationPermit IssuedNIRO INC02/22/2022
BISOTISSUEDAMBER ELECTRICAL CONTRACT12/06/2022
1 project · most recent 11/03/2022
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/03/2022Signed-offNIRO INCAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Comfort Aire RSF1342SIM 86,000 BTU · Condensing Unit ×4
Heating
Triangle Tube INSTINCT INS199C 199,000 BTU · Boiler ×2
Ventilation
Fantech HERO 200H 210 BTU · Erv ×2
Ducts & Piping
Southwark Metal G-60 COATED GALVANIZED STEEL 24 GA. 2,950 CFM · Ductwork ×2
1 project · most recent 11/03/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/03/2022Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
2 projects · most recent 07/29/2022
General Wiring
FiledStatusContractorScope
07/29/2022CompleteAMBER ELECTL CONTNG INC—
05/12/2022CompleteD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 11/03/2022
Wood
FiledStatusContractorScope
11/03/2022Signed-offNIRO INCWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2022Fail-Final CND-Occupancy InspectionFailView ↗
10/28/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
10/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/13/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/20/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/17/2022Pass-Final PL - UndergroundPassView ↗
03/03/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 130
DateRequirementInspectorRole
11/15/2022Permanent certificateWILLIAM MONTAGUEenergy_progress
11/15/2022Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
11/15/2022Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
11/15/2022Air barrier — testing WILLIAM MONTAGUEenergy_progress
11/15/2022Interior lighting powerWILLIAM MONTAGUEenergy_progress
11/15/2022HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
11/15/2022Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
11/15/2022Structural Wood FrameWILLIAM MONTAGUEprogress
11/15/2022Footing and FoundationWILLIAM MONTAGUEprogress
11/15/2022FinalWILLIAM MONTAGUEprogress
11/15/2022Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
11/15/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
11/15/2022Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
11/15/2022Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
11/15/2022Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
11/15/2022Exterior Insulation and Finish Systems (EIFS)WILLIAM MONTAGUEspecial
11/15/2022Subgrade InspectionsWILLIAM MONTAGUEspecial
11/15/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
11/15/2022Mechanical SystemsWILLIAM MONTAGUEspecial
11/15/2022Fenestration air leakageWILLIAM MONTAGUEenergy_progress
11/15/2022Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
11/15/2022HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
11/15/2022Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
11/15/2022Maintenance informationWILLIAM MONTAGUEenergy_progress
11/15/2022Fenestration areasWILLIAM MONTAGUEenergy_progress
Latest 25 of 130.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/24/2026S00597133-P7Request digital key ↗
08/24/2026S00597133-P9Request digital key ↗
08/24/2026S00597133-P8Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/02/2022540241754Open ↗
▸BISWORK PERMIT APPLICATION1
12/06/2022540241754Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026S00597133-P1Open ↗
08/13/2026S00597133-P6Open ↗
08/13/2026S00597133-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026S00597133-I1Open ↗
08/13/2026S00597133-P1Open ↗
08/13/2026S00597133-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 23
08/13/2026S00597133-I1Open ↗
08/13/2026S00597133-P8Open ↗
08/13/2026S00597133-P6Open ↗
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026S00597133-I1Open ↗
08/13/2026S00597133-P8Open ↗
08/13/2026S00597133-P6Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00597133-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026S00597133-P8Open ↗
09/01/2026S00597133-P8Open ↗
09/01/2026S00597133-P8Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026S00597133-P8Open ↗
09/01/2026S00597133-P8Open ↗
09/01/2026S00597133-P6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/24/2026S00597133-I1Open ↗
08/24/2026S00597133-P9Open ↗
08/24/2026S00597133-P8Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/02/2022540241754Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026S00597133-I1Open ↗
08/13/2026S00597133-P6Open ↗
08/13/2026S00597133-P8Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/13/2026S00597133-P8Open ↗
08/13/2026S00597133-I1Open ↗
08/13/2026S00597133-P6Open ↗
Showing 3 of 4 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
12/06/2022540241754Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00597133-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00597133-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00597133-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/13/2023540241754Open ↗
12/02/2022540241754Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/13/2023540241754Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
12/02/2022540241754Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
01/13/2023540241754Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00597133-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026S00597133-I1Open ↗
08/13/2026S00597133-P6Open ↗
08/13/2026S00597133-P8Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/13/2023540241754Open ↗
12/02/2022540241754Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00597133-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00597133-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISFINAL ELECTRICAL SIGNOFF1
01/17/2023540241754Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/17/2023540241754Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT (FINAL): PW31
01/13/2023540241754Open ↗
▸BISCOST AFFIDAVIT1
12/02/2022540241754Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/02/2022540241754Open ↗
▸BISADDITIONAL INFORMATION1
12/05/2022540241754Open ↗
▸Other Documents17
▸DOB NOWProperty Ownership Certification7
08/24/2026S00597133-P7Open ↗
08/24/2026S00597133-P9Open ↗
08/24/2026S00597133-P8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00597133-P6Open ↗
08/13/2026S00597133-P1Open ↗
08/13/2026S00597133-P8Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S00597133-P8Open ↗
08/13/2026S00597133-I1Open ↗
08/13/2026S00597133-P6Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/17/2023540241754Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00597133-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00597133-I1Open ↗