| Firm | Filings | Most Recent |
|---|---|---|
| A M ENGINEERING SERVICES PC | 5 | 07/30/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| AM ENGINEERING SERVICES | 10 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/17/2023 | — | — | Air Conditioning Systems, Heating Systems, Others, Ventilation Systems | Cooling Heating A.O. Smith ATI-540H-M 36,000 CFM · Water Heater ×3 Ventilation Other — ASU9RLF1 63,000 BTU ×7 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2024 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2024 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/17/2023 | — | — | Steel |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/29/2024 | Post-installed Anchors | — | special |
| 10/29/2024 | Fire-Resistant Penetrations and Joints | — | special |
| 07/22/2024 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | — | special |
| 07/22/2024 | Fire-Resistant Penetrations and Joints | — | special |
| 07/22/2024 | Soil Percolation Test - Individual On-Site Private Sewage Disposal Systems | — | special |
| 06/07/2024 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | — | special |
| 06/07/2024 | Fire-Resistant Penetrations and Joints | — | special |
| 06/07/2024 | Soil Percolation Test - Individual On-Site Private Sewage Disposal Systems | — | special |
| 05/28/2024 | Shutoff dampers | — | energy_progress |
| 05/28/2024 | Air barrier - visual inspection | — | energy_progress |
| 03/27/2024 | Sprinkler Systems | — | special |
| 07/12/2023 | Fire-Resistant Penetrations and Joints | — | special |
| 07/12/2023 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 07/12/2023 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 07/12/2023 | Masonry | — | special |
| 10/31/2022 | Subgrade Inspections | — | special |
| 10/31/2022 | Electric vehicle service equipment requirements | — | energy_progress |
| 10/31/2022 | HVAC-R and service water heating system controls | — | energy_progress |
| 10/31/2022 | Protection of exposed foundation insulation | — | energy_progress |
| 10/31/2022 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 10/31/2022 | Energy Code Compliance Inspections | — | progress |
| 10/31/2022 | Fire-Resistance Rated Construction | — | progress |
| 10/31/2022 | Exterior lighting power | — | energy_progress |
| 10/31/2022 | Interior lighting power | — | energy_progress |
| 10/31/2022 | Lighting controls | — | energy_progress |