Two stories - detached, small or mid-size
AULTMAN AVENUE
STATEN ISLAND · BIN 5170244
💬 Discuss this project
2024Year Built
2Stories
A1Building Class
R1-2Zoning
2,352 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,200 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL A. BIAGIOLI, ARCHITECT1005/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS1803/21/2026
KAS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
3584 CONSTRUCTION CORPGeneral Contractor707/08/2026
JPI PLUMBING & HEATING INPlumbing107/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738305/13/2025
ROGERS CALVANICO GROUP PL1324204/21/2025
Building Lifecycle
All (60)Filed (10)Permit Issued (6)Signed Off (4)Inspection (10)Special Inspection (30)
05/20/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
05/20/2025
Special inspection requirement — Preliminary
anthony santoro
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/13/2025
Filed — New Building
S00786750-P6
05/12/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
05/12/2025
Special inspection requirement — Metering
anthony santoro
05/12/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
05/12/2025
Special inspection requirement — Maintenance information
anthony santoro
05/12/2025
Special inspection requirement — Interior lighting power
anthony santoro
05/12/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
05/12/2025
Special inspection requirement — Permanent certificate
anthony santoro
05/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
05/12/2025
Special inspection requirement — Fenestration areas
anthony santoro
05/12/2025
Special inspection requirement — Air barrier — testing
anthony santoro
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/12/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
05/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
05/12/2025
Special inspection requirement — Preliminary
anthony santoro
05/12/2025
Special inspection requirement — Fireplaces
anthony santoro
05/12/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
05/01/2025
Signed off — New Building
S00786750-S3
04/25/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
04/21/2025
Filed — New Building
S00786750-P5
04/11/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
03/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/12/2025
Signed off — Alteration
S00708398-I1
03/12/2025
Signed off — New Building
S00786750-S2
03/11/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/25/2025
Filed — New Building
S00786750-P4
12/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2024
Permit issued — Curb Cut
S00708398-I1-CC
11/27/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/20/2024
Signed off — Alteration
Fence filing in conjunction with NB applications S00786750 and S00786911 aka 40 and 46 Aultman Avenue
S00969314-I1
10/18/2024
Filed — New Building
S00786750-P3
07/31/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/25/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/10/2024
Permit issued — Plumbing
S48843455-S3-PL
07/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2024
Filed — New Building
S00786750-P1
04/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/16/2024
Permit issued — Plumbing
S00786750-S3-PL
12/05/2023
Permit issued — General Construction
S00786750-I1-GC
12/05/2023
Permit issued — Construction Fence
S00969314-I1-FN
12/01/2023
Filed — Alteration
Fence filing in conjunction with NB applications S00786750 and S00786911 aka 40 and 46 Aultman Avenue
S00969314-I1
11/22/2023
Permit issued — General Construction
S00786750-S2-GC-CX
12/23/2022
Filed — New Building
S00786750-S2
12/19/2022
Filed — New Building
S00786750-S3
10/14/2022
Special inspection requirement — Insulation placement and R values
anthony santoro
10/14/2022
Special inspection requirement — Footing and Foundation
anthony santoro
10/14/2022
Special inspection requirement — Wood – Prefabricated I-Joists
anthony santoro
10/14/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
10/14/2022
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/14/2022
Special inspection requirement — Final
anthony santoro
08/26/2022
Filed — New Building
S00786750-I1
03/30/2022
Filed — Alteration
S00708398-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offS&B CONSTRUCTION11/29/2024
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC07/10/2024
DOB NOWPlumbingSigned-offJPI PLUMBING & HEATING IN04/16/2024
DOB NOWGeneral ConstructionPermit IssuedS&B CONSTRUCTION12/05/2023
DOB NOWConstruction FenceSigned-offS&B CONSTRUCTION12/05/2023
DOB NOWGeneral ConstructionSigned-offS&B CONSTRUCTION11/22/2023
1 project · most recent 02/03/2025
General Wiring
FiledStatusContractorScope
02/03/2025CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/11/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/27/2024Fail-Final CND-Occupancy InspectionFailView ↗
07/31/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/25/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/20/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/20/2025Fire-Resistance Rated Constructionanthony santoroprogress
05/20/2025Energy Code Compliance Inspectionsanthony santoroprogress
05/20/2025Preliminaryanthony santoroprogress
05/20/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
05/12/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
05/12/2025Meteringanthony santoroenergy_progress
05/12/2025Fenestration air leakageanthony santoroenergy_progress
05/12/2025Maintenance informationanthony santoroenergy_progress
05/12/2025Interior lighting poweranthony santoroenergy_progress
05/12/2025Air barrier - visual inspectionanthony santoroenergy_progress
05/12/2025Permanent certificateanthony santoroenergy_progress
05/12/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
05/12/2025Fenestration areasanthony santoroenergy_progress
05/12/2025Air barrier — testing anthony santoroenergy_progress
05/12/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
05/12/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
05/12/2025Energy Code Compliance Inspectionsanthony santoroprogress
05/12/2025Fire-Resistance Rated Constructionanthony santoroprogress
05/12/2025Preliminaryanthony santoroprogress
05/12/2025Fireplacesanthony santoroenergy_progress
05/12/2025Insulation placement and R valuesanthony santoroenergy_progress
04/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRichard Daileyspecial
04/11/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRichard Daileyspecial
10/14/2022Insulation placement and R valuesanthony santoroenergy_progress
Latest 25 of 31.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026S00708398-I1Request digital key ↗
08/23/2026S00786750-P3Request digital key ↗
08/23/2026S00786750-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
08/07/2024540211224Open ↗
01/28/2022540211224Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
09/19/2024540211224Open ↗
05/26/2022540211224Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWRestrictive Declaration/Easement 18
08/23/2026S00786750-I1Open ↗
08/23/2026S00786750-P6Open ↗
08/13/2026S00786750-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/23/2026S00786750-P6Open ↗
08/23/2026S00786750-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/23/2026S00786750-P6Open ↗
08/23/2026S00786750-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/23/2026S00786750-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/24/2026S00708398-I1Open ↗
08/23/2026S00786750-P3Open ↗
08/23/2026S00786750-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026S00786750-P6Open ↗
09/02/2026S00786750-P6Open ↗
08/28/2026S00786750-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026S00786750-P6Open ↗
09/02/2026S00786750-P6Open ↗
09/02/2026S00786750-P6Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/28/2022540211224Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/28/2022540211224Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/23/2026S00786750-I1Open ↗
08/23/2026S00786750-P6Open ↗
08/13/2026S00786750-S2Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist3
08/23/2026S00786750-I1Open ↗
08/23/2026S00786750-S2Open ↗
08/23/2026S00786750-P6Open ↗
▸DOB NOWStreet Tree Sign Off2
08/23/2026S00786750-I1Open ↗
08/13/2026S00786750-S2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/23/2026S00786750-I1Open ↗
08/13/2026S00786750-S2Open ↗
▸BISSTREET TREE CHECKLIST1
05/26/2022540211224Open ↗
▸DOB NOWStreet Trees Site Plan1
08/23/2026S00786750-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
08/23/2026S00786750-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00786750-S3Open ↗
▸Inspections & Test Reports6
▸BISBPP-9 - Request for Builders Pavement Field Inspection3
09/19/2024540211224Open ↗
05/26/2022540211224Open ↗
01/28/2022540211224Open ↗
▸DOB NOWSOIL REPORT2
08/23/2026S00786750-I1Open ↗
08/23/2026S00786750-P6Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/23/2026S00786750-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
09/19/2024540211224Open ↗
05/26/2022540211224Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/19/2024540211224Open ↗
▸BISSUPERSEDING LETTER1
09/19/2024540211224Open ↗
▸Cost, Insurance & Ownership1
▸BISDEPT OF FINANCE VERIFICATION1
01/28/2022540211224Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
09/19/2024540211224Open ↗
05/26/2022540211224Open ↗
01/28/2022540211224Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/28/2022540211224Open ↗
▸Other Documents26
▸BISBPP - SUPPORTING DOCUMENTATION14
09/19/2024540211224Open ↗
09/19/2024540211224Open ↗
09/19/2024540211224Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSite Survey: Initial3
08/23/2026S00786750-I1Open ↗
08/23/2026S00786750-P6Open ↗
08/13/2026S00786750-S2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/23/2026S00786750-I1Open ↗
08/23/2026S00786750-P6Open ↗
08/13/2026S00786750-S2Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form2
05/26/2022540211224Open ↗
05/26/2022540211224Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026S00786750-I1Open ↗
08/23/2026S00786750-P6Open ↗
▸DOB NOWFinal Survey1
08/23/2026S00786750-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00786750-S2Open ↗