ECB10/27/2022FAILURE TO PROVIDE ADEQUATE SAFETY MEASURES SUCH AS SHED,NETTING,ETC WHERE REQUIRED TO PROTECT PUBLIC & PROPERTY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY103-04 FACADE TECHINCAL REPORT FILE BY QEWI(RE/RA)ON 10$25K due
Bridge, tunnel, highway · Owner of record: POWER AUTHORITY OF THE STATE OF NEW YORK · 81,150 sf lot · 0 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.