| Owner | Filings | Most Recent |
|---|---|---|
| MHANY MANAGEMENT | 87 | 09/13/2026 |
| NEW YORK CITY ECONOMIC DEVELOPMENT | 5 | 07/08/2026 |
| NYC ECONOMIC DEVELOPMENT CORP. | 8 | 03/22/2026 |
| MHANY PENINSULA LOCAL DEV CORP | 22 | 03/21/2026 |
| NYCEDC | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EP ENGINEERING LLC | 20 | 08/18/2026 |
| REFORM ARCHITECTURE PLLC | 1 | 08/18/2026 |
| CLAIRE WEISZ ARCHITECTS, LLP | 3 | 12/06/2024 |
| INDETAIL ARCHITECTURAL AND ENGIN | 2 | 06/26/2023 |
| WXY ARCHITECTURE + URBAN DESIGN | 1 | 05/11/2022 |
| SKYLINE ENGINEERING, LLC | 3 | 07/28/2021 |
| ANCORA ENGINEERING, PLLC | 2 | 03/26/2021 |
| KZ ENGINEERING, P.C | 2 | 04/29/2020 |
| PHILIP HABIB & ASSOCIATES | 1 | 01/28/2020 |
| SAFWAY ATLANTIC LLC | 1 | 11/06/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| JM ZONING, LLC. | 14 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 2 | 03/21/2026 |
| HTX BUILDING CONSULTING | 2 | 03/21/2026 |
| DVA Advisors | 17 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SAFWAY ATLANTIC, LLC | General Contractor | 6 | 07/08/2026 |
| CS BRIDGE CORP | General Contractor | 4 | 07/08/2026 |
| SING CONSTRUCTION, INC | General Contractor | 4 | 03/21/2026 |
| SELECT COMMERCIAL CONSTR* | General Contractor | 4 | 07/08/2026 |
| ON POINT AND ON TARGET | General Contractor | 3 | 03/21/2026 |
| A.S.K. ELECTRICAL CORP | Electrical | 2 | 03/22/2026 |
| I-RESOLVE CONSTRUCTION GR | General Contractor | 2 | 07/08/2026 |
| PROJECT EYE CONSULTANTS I | General Contractor | 2 | 04/09/2026 |
| RICHTER & RATNER CONTRACTING | General Contractor | 2 | 03/21/2026 |
| NM MECHANICAL CORP | Plumbing | 2 | 07/08/2026 |
| TRISTAR PLUMBING & HTG IN | Plumbing | 1 | 07/08/2026 |
| VILLAGE P & H NY INC | Fire Protection | 1 | 07/08/2026 |
| E.M.P. FIRE SPRINKLER LLC | Fire Protection | 1 | 07/08/2026 |
| JAS ELEC'L SERVICES, INC | Electrical | 1 | 03/22/2026 |
| CROSSFIELD PLBG.&HTG | Plumbing | 1 | 07/08/2026 |
| VILLAGE P & H NY INC | Plumbing | 1 | 07/08/2026 |
| OTEC PLBNG & HTG SVCS INC | Plumbing | 1 | 07/08/2026 |
| LTB MECHANICAL CORP | General Contractor | 1 | 07/08/2026 |
| AAL CONSTRUCTION SERVICES | General Contractor | 1 | 07/08/2026 |
| PACE PLUMBING CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| EP INSPECTIONS AND COMMIS | 7079 | 4 | 03/17/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 4 | 01/14/2025 |
| METRIC CONSULTING AND INS | 1803 | 7 | 07/12/2023 |
| INDETAIL DESIGN ARCHITECT | 4828 | 1 | 06/26/2023 |
| DOMANI INSPECTION SERVICE | 843 | 3 | 07/28/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | NM MECHANICAL CORP | 03/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PROJECT EYE CONSULTANTS I | 01/13/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PROJECT EYE CONSULTANTS I | 01/13/2025 |
| DOB NOW | Sprinklers | Permit Issued | E.M.P. FIRE SPRINKLER LLC | 01/06/2025 |
| DOB NOW | General Construction | Signed-off | I-RESOLVE CONSTRUCTION GR | 12/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | LTB MECHANICAL | 11/27/2024 |
| DOB NOW | Plumbing | Signed-off | TRISTAR PLUMBING & HTG IN | 10/25/2024 |
| DOB NOW | Plumbing | Permit Issued | NM MECHANICAL CORP | 10/07/2024 |
| DOB NOW | General Construction | Signed-off | I-RESOLVE CONSTRUCTION GR | 10/01/2024 |
| DOB NOW | General Construction | Permit Issued | SELECT COMMERCIAL CONSTR* | 09/22/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | SELECT COMMERCIAL CONSTR* | 09/21/2023 |
| DOB NOW | Plumbing | Signed-off | CROSSFIELD PLBG.&HTG | 09/19/2023 |
| DOB NOW | Sprinklers | Permit Issued | VILLAGE P & H NY INC | 09/12/2023 |
| DOB NOW | Sprinklers | Signed-off | VILLAGE P & H NY INC | 09/12/2023 |
| DOB NOW | General Construction | Signed-off | SING CONSTRUCTION | 08/23/2023 |
| DOB NOW | General Construction | Signed-off | SING CONSTRUCTION | 07/17/2023 |
| DOB NOW | Plumbing | Signed-off | OTEC PLBNG & HTG SVCS INC | 03/16/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | ON POINT AND ON TARGET | 02/01/2023 |
| DOB NOW | Curb Cut | Signed-off | AAL CONSTRUCTION SERVICES | 11/03/2021 |
| DOB NOW | Construction Fence | Signed-off | RICHTER & RATNER CONTRACTING | 05/17/2021 |
| DOB NOW | Sidewalk Shed | Signed-off | CS BRIDGE CORP | 02/23/2021 |
| DOB NOW | Boiler Equipment | Signed-off | PACE PLUMBING CORP | 10/30/2020 |
| DOB NOW | Supported Scaffold | Signed-off | CS BRIDGE CORP | 06/10/2020 |
| DOB NOW | Sidewalk Shed | Signed-off | CS BRIDGE CORP | 03/06/2020 |
| DOB NOW | Construction Fence | Signed-off | SAFWAY ATLANTIC, LLC | 01/22/2020 |
| DOB NOW | Construction Fence | Signed-off | SAFWAY ATLANTIC, LLC | 09/19/2019 |
| DOB NOW | Construction Fence | Signed-off | SAFWAY ATLANTIC, LLC | 12/14/2018 |
| DOB NOW | Construction Fence | Signed-off | SAFWAY ATLANTIC, LLC | 11/07/2018 |
| BIS | PL | ISSUED | PACE PLUMBING CORP | 12/02/2021 |
| BIS | — | ISSUED | RICHTER & RATNER CONTRACTING | 04/05/2021 |
| BIS | — | ISSUED | RICHTER & RATNER CONTRACTING | 04/01/2021 |
| BIS | — | ISSUED | RICHTER & RATNER CONTRACTING | 03/31/2021 |
| BIS | — | ISSUED | RICHTER & RATNER CONTRACTING | 03/30/2021 |
| BIS | — | ISSUED | RICHTER & RATNER CONTRACTING | 03/25/2021 |
| BIS | — | ISSUED | RICHTER & RATNER CONTRACTING | 03/24/2021 |
| BIS | OT | ISSUED | RICHTER & RATNER CONTRACTING | 12/17/2020 |
| BIS | OT | ISSUED | CAPRI CONSTRUCTION CORP | 12/16/2020 |
| BIS | — | ISSUED | RICHTER & RATNER CONTRACTING | 11/20/2020 |
| BIS | PL | ISSUED | PACE PLUMBING CORP | 09/30/2020 |
| BIS | OT | ISSUED | EMPOWER CES LLC | 09/11/2020 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/18/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Climatemaster SB096 3,200 CFM · Wshp ×1 |
| 05/21/2025 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Climatemaster TE-072 69,000 BTU · Wshp ×1 Coolair OSWH8G3ADFTA-F 104,000 BTU · Heat Pump Outdoor ×1 Ventilation |
| 03/17/2025 | Permit Issued | PROJECT EYE CONSULTANTS I | Heating and Air Conditioning Systems | Heat / Cool Bosch EP060-1HZC-FLEAUB-XFGAMXXXS7XXXX3XXXXSBA 57,900 BTU · Wshp ×2 |
| 01/14/2025 | Signed-off | I-RESOLVE CONSTRUCTION GR | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Bosch EX150-EHZC-SLSBUC-XFGMXXXXX7XXXX1DXXXSBA 148,600 BTU · Wshp ×2 Florida Heat Pump EC150-3HZC 148,600 BTU · Wshp ×2 Ventilation |
| 07/12/2023 | Permit Issued | PROJECT EYE CONSULTANTS I | Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Climatemaster TC-048 4 tons · Wshp ×2 Ventilation Ducts & Piping N/A N/A 1 CFM · Ductwork ×1 |
| 12/07/2022 | — | — | Air Conditioning Systems | Cooling Water Furnace NBH048 1,650 CFM · Wshp ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | — | — | — |
| 05/21/2025 | — | — | 28 heads |
| 03/17/2025 | — | — | 1 heads |
| 01/14/2025 | Permit Issued | E.M.P. FIRE SPRINKLER LLC | Sprinkler System |
| 07/07/2023 | Permit Issued | PARAMOUNT SERVICES, LLC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/18/2026 | — | — | Water/Sanitary |
| 05/21/2025 | — | — | Gas, Water/Sanitary |
| 03/17/2025 | — | — | Water/Sanitary |
| 01/14/2025 | Signed-off | TRISTAR PLUMBING & HTG IN | Gas, Water/Sanitary |
| 07/07/2023 | Signed-off | VILLAGE P & H NY INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/22/2025 | Complete | JAS ELEC'L SERVICES, INC | General Wiring |
| 03/21/2025 | Complete | JAS ELEC'L SERVICES, INC | General Wiring |
| 01/04/2024 | Complete | INTERSTATE ELECTRIC, LLC | General Wiring |
| 06/04/2023 | Permit Issued | OMD ELECTRICAL CORP | General Wiring |
| 03/27/2023 | Permit Issued | WCK ELECTRIC CORP. | General Wiring |
| 12/08/2021 | Complete | A.S.K. ELECTRICAL CORP | General Wiring |
| 03/12/2021 | Complete | ISLAND ELECTRIC CORP | — |
| 07/08/2020 | Complete | THYSSENKRUPP ELEVATOR CO | — |
| 04/23/2020 | Complete | A.S.K. ELECTRICAL CORP | — |
| 03/09/2020 | Complete | NASH ELECTRIC SERVICES IN | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 11/14/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/07/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/06/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/05/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/18/2025 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 02/14/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/02/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/17/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 12/11/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/11/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/25/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 10/15/2024 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 08/16/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/16/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/16/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/01/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/02/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/21/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/26/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/10/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/29/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/03/2023 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/17/2026 | Post-installed Anchors | — | special |
| 07/17/2026 | Sprinkler Systems | — | special |
| 07/17/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/17/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 07/17/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 07/17/2026 | Maintenance information | — | energy_progress |
| 07/17/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 07/17/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/17/2026 | Energy Code Compliance Inspections | — | progress |
| 07/17/2026 | Final | — | progress |
| 07/17/2026 | Post-installed Anchors | — | special |
| 07/17/2026 | High-Pressure Steam Piping (Welding) | — | special |
| 07/17/2026 | High Temperature Hot Water Piping (Welding) | — | special |
| 07/17/2026 | Heating Systems | — | special |
| 07/17/2026 | Exhaust and Vent Systems in Plenums and Ducts | — | special |
| 07/17/2026 | Mechanical Systems | — | special |
| 07/18/2024 | High-Pressure Fuel-Gas Piping (Welding) | MOLLY GLENN | special |
| 07/18/2024 | Post-installed Anchors | MOLLY GLENN | special |
| 07/18/2024 | HVAC-R and service water piping design and insulation | MOLLY GLENN | energy_progress |
| 07/18/2024 | Maintenance information | MOLLY GLENN | energy_progress |
| 07/18/2024 | HVAC-R and service water heating equipment | MOLLY GLENN | energy_progress |
| 07/18/2024 | Energy Code Compliance Inspections | MOLLY GLENN | progress |
| 07/18/2024 | Post-installed Anchors | MOLLY GLENN | special |
| 07/18/2024 | Post-installed Anchors | MOLLY GLENN | special |
| 07/18/2024 | HVAC-R and service water heating system controls | MOLLY GLENN | energy_progress |