BEACH 28 STREET
QUEENS · BIN 4615258
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R5Zoning
0 sfGross Floor Area
0Units
4 Open Violations 3 unresolved · 1 paperwork only ▸
Zoned residential, not Manhattan · Owner of record: 204B LLC · 52,380 sf lot · 0 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscape
Permit Issued — active, not yet Signed-off
RoofUnder Construction57p · 1 filing · 20 docs
Floor 6Under Construction56p · 1 filing · 20 docs
Floor 5Under Construction55p · 1 filing · 20 docs
Floor 4Under Construction56p · 1 filing · 20 docs
Floor 3Under Construction50p · 1 filing · 20 docs
Floor 2Under Construction58p · 1 filing · 20 docs
Floor 1Under Construction24p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALTON DEVELOPERS3009/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/29/2025$4.5M—BEACH 28 LLC → 204B LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor907/10/2026
CS BRIDGE CORPGeneral Contractor307/08/2026
M.R. ELEC'L SERVICE LLCElectrical203/22/2026
BEST MECHANICAL SVCS INCPlumbing207/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161208/26/2026
Building Lifecycle
All (145)Filed (18)Permit Issued (15)Signed Off (7)Violation (4)Inspection (7)Objection (64)Special Inspection (30)
08/26/2026
Filed — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-P7
08/26/2026
Signed off — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-S2
08/26/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Lowest Floor Elevation
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Air barrier — testing
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Vestibules
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
08/26/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
08/25/2026
Objection resolved — Resolved
08/21/2026
Objection raised — Structural
08/17/2026
Signed off — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-S4
08/12/2026
Signed off — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-Z3
08/12/2026
Signed off — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-Z2
08/12/2026
Signed off — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-Z4
08/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2026
Signed off — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-S5
07/29/2026
Signed off — Alteration
Q01239130-I1
07/21/2026
Filed — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-P6
07/16/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
07/16/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
07/16/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/09/2026
Permit issued — Construction Fence
Q01239130-I1-FN
07/03/2026
Filed — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-P5
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
06/30/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SHAHRIAR QUAYYUM
06/26/2026
Permit issued — Sidewalk Shed
Q01261212-Z4-SH
06/25/2026
Filed — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-Z4
06/23/2026
Violation issued (ECB, open)
Unknown
06/23/2026
Violation issued (ECB, open)
Construction
06/23/2026
Violation issued (ECB, open)
Construction
06/23/2026
Violation issued (ECB, open)
Unknown
06/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2026
Permit issued — General Construction
Q01261212-I1-GC
06/08/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/28/2026
Permit issued — General Construction
Q01261212-I1-GC
05/20/2026
Filed — New Building
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01261212-P3
05/14/2026
Special inspection requirement — Footing and Foundation
SHAHRIAR QUAYYUM
05/14/2026
Special inspection requirement — Deep Foundation Elements
SHAHRIAR QUAYYUM
05/14/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
04/30/2026
Permit issued — Support of Excavation
Q01261212-S9-SE
04/29/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/27/2026
Permit issued — Standpipe
Q01261212-S7-EW-SD
04/23/2026
Permit issued — Plumbing
Q01261212-S8-PL
04/21/2026
Permit issued — Sprinklers
Q01261212-S7-EW-SP
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC07/09/2026
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP06/26/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC06/12/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC05/28/2026
DOB NOWSupport of ExcavationPermit IssuedINNOVATIVE CONSTR NYC LLC04/30/2026
DOB NOWStandpipePermit IssuedBEST MECHANICAL SVCS INC04/27/2026
DOB NOWPlumbingPermit IssuedBEST MECHANICAL SVCS INC04/23/2026
DOB NOWSprinklersPermit IssuedRIGHTWAY PLBG AND HTG INC04/21/2026
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP04/16/2026
DOB NOWProtection and Mechanical MethodsSigned-offCS BRIDGE CORP04/16/2026
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC03/17/2026
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC02/26/2026
DOB NOWFoundationSigned-offINNOVATIVE CONSTR NYC LLC02/26/2026
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC02/25/2026
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC02/25/2026
1 project · most recent 08/26/2026
Sprinkler System
FiledStatusContractorScope
08/26/2026Permit IssuedRIGHTWAY PLBG AND HTG INCSprinkler System
1 project · most recent 08/26/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/26/2026Permit IssuedRIGHTWAY PLBG AND HTG INCGas, Storm, Water/Sanitary
6 projects · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026CompleteNASH ELECTRIC SERVICES IN—
03/25/2026Permit IssuedINTELOGIC ELECTRIC, INC.—
12/17/2025CancelledM.R. ELEC'L SERVICE LLCGeneral Wiring
12/11/2025Permit IssuedFIRST QUALITY ELECL LLC1 meters, 1 new_meters
12/11/2025Permit IssuedFIRST QUALITY ELECL LLCGeneral Wiring
11/27/2025Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
1 project · most recent 08/26/2026
Concrete
FiledStatusContractorScope
08/26/2026Signed-offCS BRIDGE CORPConcrete
1 project · most recent 08/26/2026
Scaffold
FiledStatusContractorScope
08/26/2026Signed-offCS BRIDGE CORPScaffold
1 project · most recent 08/26/2026
Earthwork
FiledStatusContractorScope
08/26/2026Signed-offCS BRIDGE CORPEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/08/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/29/2026Pass-Final PL - UndergroundPassView ↗
09/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
08/26/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/26/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
08/26/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
08/26/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
08/26/2026Lowest Floor ElevationSHAHRIAR QUAYYUMprogress
08/26/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
08/26/2026Air barrier — testing SHAHRIAR QUAYYUMenergy_progress
08/26/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/26/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
08/26/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
08/26/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
08/26/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
08/26/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
08/26/2026MeteringSHAHRIAR QUAYYUMenergy_progress
08/26/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
08/26/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
08/26/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/26/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
08/26/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
08/26/2026VestibulesSHAHRIAR QUAYYUMenergy_progress
08/26/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
07/16/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
07/16/2026Standpipe SystemsSHAHRIAR QUAYYUMspecial
07/16/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
07/16/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
Latest 25 of 79.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/20/2026Q01239130-P1Request digital key ↗
08/20/2026Q01239130-I1Request digital key ↗
08/17/2026Q01261212-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/17/2025440823922Open ↗
07/18/2025440823922Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/18/2025440823922Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01261212-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01261212-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01261212-I1Open ↗
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/20/2026Q01239130-I1Open ↗
08/20/2026Q01239130-P1Open ↗
08/17/2026Q01261212-S4Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026Q01261212-P7Open ↗
09/23/2026Q01261212-P7Open ↗
08/29/2026Q01261212-S2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026Q01261212-P7Open ↗
09/23/2026Q01261212-P7Open ↗
08/29/2026Q01261212-S2Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/18/2025440823922Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/18/2025440823922Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026Q01261212-I1Open ↗
▸Safety & Tenant Protection6
▸BISBPP: STREET TREES SITE PLAN1
11/26/2025440823922Open ↗
▸BISSTREET TREE CHECKLIST1
07/18/2025440823922Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01261212-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01261212-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026Q01261212-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026Q01261212-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q01261212-P1Open ↗
08/13/2026Q01261212-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01261212-S4Open ↗
▸DOB NOWTR5 Test Report1
08/17/2026Q01261212-S4Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
07/18/2025440823922Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/18/2025440823922Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION2
07/18/2025440823922Open ↗
07/18/2025440823922Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01261212-S4Open ↗
08/13/2026Q01261212-S9Open ↗
▸BISDEP GREEN INFRASTRUCTURE1
11/26/2025440823922Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
11/26/2025440823922Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/17/2026Q01261212-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01261212-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01261212-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01261212-I1Open ↗