← Back
Two family frame
BEACH 68TH STREET
QUEENS · BIN 4623726
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R4-1Zoning
2,416 sfGross Floor Area
2Units
Two family frame · 3,000 sf lot · 0.81 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalPlumbing
Roof1p · 1 filing · 6 docs
Floor 34p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS1807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/27/2023$957K—BEACH 68 GROUP LLC → Private party$396/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.502/13/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor903/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252302/13/2023
VICTOR SUBEN6672202/13/2023
PIROOZ ENGINEERING P.C7177107/05/2022
Building Lifecycle
All (62)Filed (5)Permit Issued (4)Signed Off (3)Inspection (8)Objection (12)Special Inspection (30)
03/15/2023
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION # Q00583563, FOR INSTALLATION OF SPRINKLER SYSTEM (WITH LESS THAN 30 HEADS) AND ALSO PLUMBING FIXTURES AND PLUMBING PIPING FOR A NEW 2-FAMILY BUILDING.
Q00571020-I1
03/13/2023
Signed off — Alteration
Installation of temporary construction fence in conjunction with NB application #Q00571019
Q00571019-I1
03/13/2023
Signed off — Alteration
Q00571021-I1
03/09/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/16/2023
Permit issued — Curb Cut
Q00571021-I1-CC
02/13/2023
Filed — New Building
PROPOSED 3 STORY, 2 FAMILY DWELLING FRAME BUILDING.
Q00583563-P1
02/07/2023
Special inspection requirement — Concrete - Cast-In-Place
Victor Suben
02/07/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Victor Suben
02/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Victor Suben
02/07/2023
Special inspection requirement — Heating Systems
Victor Suben
02/07/2023
Special inspection requirement — Masonry
Victor Suben
02/07/2023
Special inspection requirement — Mechanical Systems
Victor Suben
02/07/2023
Special inspection requirement — Structural Cold-Formed Steel
Victor Suben
02/07/2023
Special inspection requirement — Subgrade Inspections
Victor Suben
02/07/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
INDARDEO PARBHUNATH
02/07/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
INDARDEO PARBHUNATH
02/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Victor Suben
02/07/2023
Special inspection requirement — Final
NAVEEN KUMAR
02/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Victor Suben
02/07/2023
Special inspection requirement — Footing and Foundation
Victor Suben
02/07/2023
Special inspection requirement — Lowest Floor Elevation
Victor Suben
02/07/2023
Special inspection requirement — Preliminary
Victor Suben
02/07/2023
Special inspection requirement — Structural Wood Frame
Victor Suben
02/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Victor Suben
02/07/2023
Special inspection requirement — Air barrier — testing
Victor Suben
02/07/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Victor Suben
02/07/2023
Special inspection requirement — Interior lighting power
Victor Suben
02/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Victor Suben
02/07/2023
Special inspection requirement — Fenestration areas
Victor Suben
02/07/2023
Special inspection requirement — Air barrier - visual inspection
Victor Suben
02/07/2023
Special inspection requirement — Maintenance information
Victor Suben
02/07/2023
Special inspection requirement — Insulation placement and R values
Victor Suben
02/07/2023
Special inspection requirement — Fenestration air leakage
Victor Suben
02/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Victor Suben
02/07/2023
Special inspection requirement — Electric vehicle service equipment requirements
Victor Suben
02/07/2023
Special inspection requirement — Permanent certificate
Victor Suben
11/14/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/14/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/14/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/11/2022
Permit issued — Plumbing
Q00571020-I1-PL
07/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2022
Objection raised — Inspections
07/17/2022
Objection resolved — Addressed
07/17/2022
Objection raised — Structural
07/17/2022
Objection resolved — Addressed
07/10/2022
Objection raised — Scope
07/10/2022
Objection resolved — Addressed
07/10/2022
Objection raised — Inspections
07/10/2022
Objection resolved — Addressed
07/10/2022
Objection raised — Admin
07/10/2022
Objection resolved — Addressed
07/10/2022
Objection raised — Inspections
07/10/2022
Objection resolved — Addressed
07/06/2022
Permit issued — Construction Fence
Q00571019-I1-FN
07/05/2022
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION # Q00583563, FOR INSTALLATION OF SPRINKLER SYSTEM (WITH LESS THAN 30 HEADS) AND ALSO PLUMBING FIXTURES AND PLUMBING PIPING FOR A NEW 2-FAMILY BUILDING.
Q00571020-I1
07/05/2022
Permit issued — Structural
Q00583563-I1-GC-CX
07/03/2022
Filed — Alteration
Q00571021-I1
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJ&J DESIGNS INC02/16/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR08/11/2022
DOB NOWConstruction FenceSigned-offJ&J DESIGNS INC07/06/2022
DOB NOWStructuralPermit IssuedJ&J DESIGNS INC07/05/2022
BISOTISSUEDPRO CUSTOM SOLAR LLC11/21/2023
1 project · most recent 02/13/2023
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/13/2023Permit IssuedJ&J DESIGNS INCHeating Systems, Ventilation Systems
Heating
Navien NCB-150E 100,000 BTU · Boiler ×2
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×4
FV-150VQ5 150 CFM · Exhaust Fan ×2
2 projects · most recent 11/22/2023
General Wiring Boiler Controls
FiledStatusContractorScope
11/22/2023CompleteISLAND ELECTRIC CORP—
02/07/2023CompleteSKY ELECTRIC LLCGeneral Wiring, Boiler Controls
1 project · most recent 02/13/2023
Wood
FiledStatusContractorScope
02/13/2023Permit IssuedJ&J DESIGNS INCWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/09/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
02/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
02/07/2023Concrete - Cast-In-PlaceVictor Subenspecial
02/07/2023Excavations - Sheeting, Shoring, and BracingVictor Subenspecial
02/07/2023Fire-Resistant Penetrations and JointsVictor Subenspecial
02/07/2023Heating SystemsVictor Subenspecial
02/07/2023MasonryVictor Subenspecial
02/07/2023Mechanical SystemsVictor Subenspecial
02/07/2023Structural Cold-Formed SteelVictor Subenspecial
02/07/2023Subgrade InspectionsVictor Subenspecial
02/07/2023Subsurface Conditions – Fill Placement & In-Place DensityINDARDEO PARBHUNATHspecial
02/07/2023Subsurface Investigations (Borings/Test Pits)INDARDEO PARBHUNATHspecial
02/07/2023Energy Code Compliance InspectionsVictor Subenprogress
02/07/2023FinalNAVEEN KUMARprogress
02/07/2023Fire-Resistance Rated ConstructionVictor Subenprogress
02/07/2023Footing and FoundationVictor Subenprogress
02/07/2023Lowest Floor ElevationVictor Subenprogress
02/07/2023PreliminaryVictor Subenprogress
02/07/2023Structural Wood FrameVictor Subenprogress
02/07/2023HVAC-R and service water heating system controlsVictor Subenenergy_progress
02/07/2023Air barrier — testing Victor Subenenergy_progress
02/07/2023Fenestration and door U-factor and product ratingsVictor Subenenergy_progress
02/07/2023Interior lighting powerVictor Subenenergy_progress
02/07/2023HVAC-R and service water piping design and insulationVictor Subenenergy_progress
02/07/2023Fenestration areasVictor Subenenergy_progress
02/07/2023Air barrier - visual inspectionVictor Subenenergy_progress
02/07/2023Maintenance informationVictor Subenenergy_progress
Latest 25 of 38.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00571019-I1Request digital key ↗
08/26/2026Q00571021-I1Request digital key ↗
08/25/2026Q00583563-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/09/2023440812890Open ↗
▸BISWORK PERMIT APPLICATION1
11/21/2023440812890Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00583563-I1Open ↗
08/13/2026Q00583563-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00583563-I1Open ↗
08/13/2026Q00583563-P1Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
11/09/2023440812890Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00583563-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026Q00583563-P1Open ↗
08/28/2026Q00583563-P1Open ↗
08/28/2026Q00583563-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/26/2026Q00571019-I1Open ↗
08/25/2026Q00583563-P1Open ↗
08/25/2026Q00583563-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026Q00583563-P1Open ↗
08/28/2026Q00583563-P1Open ↗
08/28/2026Q00583563-P1Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/09/2023440812890Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/09/2023440812890Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/09/2023440812890Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00583563-P1Open ↗
08/13/2026Q00583563-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00583563-I1Open ↗
08/13/2026Q00583563-P1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
11/14/2023440812890Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00583563-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00583563-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00583563-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/09/2023440812890Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/02/2024440812890Open ↗
11/09/2023440812890Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00583563-I1Open ↗
08/13/2026Q00571020-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/09/2023440812890Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/02/2024440812890Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
11/09/2023440812890Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
02/02/2024440812890Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY4
02/02/2024440812890Open ↗
11/21/2023440812890Open ↗
11/14/2023440812890Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026Q00583563-P1Open ↗
08/13/2026Q00583563-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00583563-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00583563-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/05/2024440812890Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/05/2024440812890Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/09/2023440812890Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/02/2024440812890Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/09/2023440812890Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/13/2026Q00583563-P1Open ↗
08/13/2026Q00583563-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00583563-P1Open ↗
08/13/2026Q00583563-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/25/2026Q00583563-P1Open ↗
08/25/2026Q00583563-I1Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
11/09/2023440812890Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00583563-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00583563-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00583563-I1Open ↗