← Back
Three families
BENSON AVENUE
BROOKLYN · BIN 3856312
💬 Discuss this project
2023Year Built
2Stories
C0Building Class
R5Zoning
6,163 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 1,800 sf lot · 3.42 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof15p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 6 docs
Floor 215p · 4 filings · 20 docs
Floor 113p · 3 filings · 20 docs
Cellar18p · 5 filings · 20 docs
Sub-Basement12p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GRANDEUR REALTY409/13/2026
JIMM W21909/01/2026
STELLAR INDUSTRIES303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MEI BUILDINGS SERVICES203/21/2026
S M TAM ARCHITECT203/21/2026
VIBEN BUILDING203/21/2026
H Z BUILDING NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & L PLUMBING INCPlumbing1006/28/2026
JOHN EVAN CONTRACTING CORGeneral Contractor603/21/2026
LXC CONSTRUCTION INCGeneral Contractor603/21/2026
LOXTON INCGeneral Contractor407/08/2026
CASE PLUMBING LLCFire Protection107/04/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244607/27/2026
JIAN ENGINEERING PLLC7397102/10/2023
Building Lifecycle
All (82)Filed (12)Permit Issued (9)Signed Off (1)Violation (11)Inspection (13)Objection (6)Special Inspection (30)
08/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/21/2026
Special inspection requirement — HVAC and service water heating system controls
NARESH MAHANGU
08/21/2026
Special inspection requirement — HVAC insulation and sealing
NARESH MAHANGU
08/21/2026
Special inspection requirement — Maintenance information
NARESH MAHANGU
08/21/2026
Special inspection requirement — HVAC and service water heating equipment
NARESH MAHANGU
08/21/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
07/27/2026
Filed — Alteration
PROPOSED ONE 10'-0" WIDE CURB CUT WITH TWO 1'-6" SPRAYS AS PER PLAN, ANOTHER CURB CUT TO BE FILED UNDER #B01436337-I1.
B01436337-S1
07/27/2026
Filed — Alteration
PROPOSED ONE 10'-0" WIDE CURB CUT WITH TWO 1'-6" SPRAYS AS PER PLAN, ANOTHER CURB CUT TO BE FILED UNDER #B01436337-I1.
B01436337-I1
07/27/2026
Filed — Alteration
SUBSEQUENT FILE PLUMBING WORK FOR NEW SEWER WORK IN THE FRONT OF BUILDING ONLY.
B00379873-P2
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
07/24/2026
Special inspection requirement — HVAC and service water heating equipment
NARESH MAHANGU
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
07/24/2026
Special inspection requirement — HVAC insulation and sealing
NARESH MAHANGU
07/24/2026
Special inspection requirement — Maintenance information
NARESH MAHANGU
07/24/2026
Special inspection requirement — HVAC and service water heating system controls
NARESH MAHANGU
07/23/2026
Signed off — Alteration
B00721368-I1
07/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/16/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
07/09/2026
Special inspection requirement — Sprinkler Systems
NARESH MAHANGU
07/02/2026
Filed — Alteration
PROPOSED SPRINKLER WORK FOR 2-STORY BUILDING WITH BASEMENT AND CELLAR
B01253858-P1
06/24/2026
Special inspection requirement — Sprinkler Systems
NARESH MAHANGU
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/27/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/23/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
03/06/2026
Permit issued — Plumbing
B00379873-S1-PL
03/03/2026
Filed — Alteration
SUBSEQUENT FILE PLUMBING WORK FOR NEW SEWER WORK IN THE FRONT OF BUILDING ONLY.
B00379873-S1
11/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/30/2025
Permit issued — Sprinklers
B01253858-I1-EW-SP
10/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/20/2025
Objection raised — Other
10/20/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
09/25/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/25/2025
Objection raised — Other
09/25/2025
Objection raised — Other
09/19/2025
Filed — Alteration
SUBSEQUENT FILE PLUMBING WORK FOR NEW SEWER WORK IN THE FRONT OF BUILDING ONLY.
B00379873-P1
09/18/2025
Filed — Alteration
PROPOSED SPRINKLER WORK FOR 2-STORY BUILDING WITH BASEMENT AND CELLAR
B01253858-I1
09/17/2025
Special inspection requirement — HVAC and service water heating equipment
NARESH MAHANGU
09/17/2025
Special inspection requirement — HVAC insulation and sealing
NARESH MAHANGU
09/17/2025
Special inspection requirement — HVAC and service water heating system controls
NARESH MAHANGU
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
09/17/2025
Special inspection requirement — Maintenance information
NARESH MAHANGU
09/17/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
06/26/2025
Permit issued — Plumbing
B00379873-I1-PL
05/23/2025
Permit issued — Structural
B00422246-I1-ST
05/05/2025
Permit issued — Construction Fence
B00721368-I1-FN
07/06/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/06/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2023
Violation issued (ECB, closed)
Construction
05/30/2023
Violation issued (ECB, closed)
Construction
05/30/2023
Violation issued (ECB, closed)
Construction
04/11/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC03/06/2026
DOB NOWSprinklersSigned-offS & L PLUMBING INC10/30/2025
DOB NOWPlumbingPermit IssuedS & L PLUMBING INC06/26/2025
DOB NOWStructuralPermit IssuedLXC CONSTRUCTION INC05/23/2025
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC05/05/2025
DOB NOWConstruction FencePermit IssuedJOHN EVAN CONTRACTING COR04/06/2023
DOB NOWStructuralPermit IssuedJOHN EVAN CONTRACTING COR03/09/2023
DOB NOWConstruction FenceSigned-offLOXTON INC01/10/2023
DOB NOWConstruction FenceSigned-offLOXTON INC08/04/2022
BIS—ISSUEDLXC CONSTRUCTION INC05/19/2025
BIS—ISSUEDLXC CONSTRUCTION INC05/16/2025
BIS—ISSUEDLXC CONSTRUCTION INC05/09/2025
BIS—ISSUEDSTELLAR INDUSTRIES INC04/10/2023
BIS—ISSUEDSTRUCTURE R US INC01/18/2023
BIS—ISSUEDSTRUCTURE R US INC08/26/2022
1 project · most recent 07/02/2026
FiledStatusContractorScope
07/02/2026Signed-offCASE PLUMBING LLC78 heads
1 project · most recent 07/27/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/27/2026Signed-offNYC MAINMAN CORPGas, Storm, Water/Sanitary
1 project · most recent 06/12/2025
General Wiring
FiledStatusContractorScope
06/12/2025CompleteERIC & NG ELEC'L, INC.General Wiring
2 projects · most recent 02/10/2023
Steel Masonry Wood
FiledStatusContractorScope
02/10/2023——1 scope_items
11/17/2020Permit IssuedLXC CONSTRUCTION INCSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2026Pass-Final PL - UndergroundPassView ↗
03/23/2026Fail-Final PL - UndergroundFailView ↗
11/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/25/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/25/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/25/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
08/21/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/21/2026HVAC and service water heating system controls NARESH MAHANGUenergy_progress
08/21/2026HVAC insulation and sealing NARESH MAHANGUenergy_progress
08/21/2026Maintenance informationNARESH MAHANGUenergy_progress
08/21/2026HVAC and service water heating equipment NARESH MAHANGUenergy_progress
08/21/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/24/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/24/2026HVAC and service water heating equipment NARESH MAHANGUenergy_progress
07/24/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
07/24/2026HVAC insulation and sealing NARESH MAHANGUenergy_progress
07/24/2026Maintenance informationNARESH MAHANGUenergy_progress
07/24/2026HVAC and service water heating system controls NARESH MAHANGUenergy_progress
07/09/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
07/09/2026Sprinkler SystemsNARESH MAHANGUspecial
06/24/2026Sprinkler SystemsNARESH MAHANGUspecial
06/24/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
09/17/2025HVAC and service water heating equipment NARESH MAHANGUenergy_progress
09/17/2025HVAC insulation and sealing NARESH MAHANGUenergy_progress
09/17/2025HVAC and service water heating system controls NARESH MAHANGUenergy_progress
09/17/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
09/17/2025Maintenance informationNARESH MAHANGUenergy_progress
09/17/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
02/09/2023Concrete - Cast-In-PlaceJIAN DENGspecial
02/09/2023Subgrade InspectionsJIAN DENGspecial
02/09/2023Subsurface Conditions – Fill Placement & In-Place DensityJIAN DENGspecial
Latest 25 of 38.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch7
08/29/2026B00721368-I1Request digital key ↗
08/27/2026B00825534-I1Request digital key ↗
08/20/2026B01253858-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/29/2026B00379873-I1Request digital key ↗
08/29/2026B00379873-P2Request digital key ↗
08/18/2026B00379873-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural1
08/15/2026B00422246-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION9
06/05/2025321589955Open ↗
12/07/2020321589955Open ↗
12/01/2020321589955Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
05/20/2025321589955Open ↗
05/12/2025321589955Open ↗
05/07/2025321589955Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
06/30/2025321589955Open ↗
12/18/2020321589955Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/09/2020321589955Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/09/2020321589955Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/09/2020321589955Open ↗
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026B00422246-I1Open ↗
08/29/2026B00721368-I1Open ↗
08/20/2026B01253858-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026B00379873-I1Open ↗
08/29/2026B00379873-I1Open ↗
08/29/2026B00422246-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/07/2026B01253858-I1Open ↗
08/29/2026B00379873-I1Open ↗
08/29/2026B00422246-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/07/2022321589955Open ↗
09/07/2022321589955Open ↗
▸Trade Schedules & Equipment1
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
12/09/2020321589955Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/09/2020321589955Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/12/2023321589955Open ↗
12/09/2020321589955Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/07/2022321589955Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/12/2023321589955Open ↗
04/12/2023321589955Open ↗
12/09/2020321589955Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
04/12/2023321589955Open ↗
09/07/2022321589955Open ↗
09/07/2022321589955Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/12/2023321589955Open ↗
09/07/2022321589955Open ↗
▸BISSOIL REPORT1
12/09/2020321589955Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
12/09/2020321589955Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00825534-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00825534-I1Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION9
09/07/2022321589955Open ↗
09/07/2022321589955Open ↗
09/07/2022321589955Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
11/30/2020321589955Open ↗
07/21/2020321589955Open ↗
▸Cost, Insurance & Ownership4
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
05/20/2025321589955Open ↗
08/11/2022321589955Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
04/10/2023321589955Open ↗
08/11/2022321589955Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION8
06/30/2025321589955Open ↗
12/18/2020321589955Open ↗
12/09/2020321589955Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET3
12/01/2020321589955Open ↗
12/01/2020321589955Open ↗
04/30/2020321589955Open ↗
▸Other Documents1
▸BISSUSTAINABLE ROOF ZONE FORM1
12/09/2020321589955Open ↗