← Back
BuildNYC
BROOKLYN
1912 NEPTUNE AVENUE
BROOKLYN · BIN 3430571
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Arena Renewables1 filing · 3 docs
Filed — no permit issuedInstallation of unenclosed energy storage system11p · 1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS Designs410/14/2026
Building Lifecycle
All (9)Filed (4)Objection (1)Special Inspection (4)
10/15/2026
Objection raised — Other
10/14/2026
Filed — Alteration CO
PROPOSED INSTALLATION OF UNENCLOSED NON-ACCESSORY ENERGY STORAGE SYSTEM WITH ASSOCIATED EQUIPMENT IN CONJUNCTION WITH APPLICATION #B01444791-I1 FOR EESE TAX ABATEMENT
B01441474-S3
10/14/2026
Filed — Alteration
PROPOSED EESE TAX ABATEMENT APPLICATION FOR INSTALLATION OF UNENCLOSED NON-ACCESSORY ENERGY STORAGE SYSTEM WITH ASSOCIATED EQUIPMENT FILED IN CONJUNCTION WITH ALT-CO B01441474-I1
B01444791-I1
10/14/2026
Filed — Alteration CO
PROPOSED INSTALLATION OF UNENCLOSED NON-ACCESSORY ENERGY STORAGE SYSTEM WITH ASSOCIATED EQUIPMENT IN CONJUNCTION WITH APPLICATION #B01444791-I1 FOR EESE TAX ABATEMENT
B01441474-S2
10/01/2026
Filed — Alteration CO
PROPOSED INSTALLATION OF UNENCLOSED NON-ACCESSORY ENERGY STORAGE SYSTEM WITH ASSOCIATED EQUIPMENT IN CONJUNCTION WITH APPLICATION #B01444791-I1 FOR EESE TAX ABATEMENT
B01441474-I1
08/12/2026
Special inspection requirement — Final
08/12/2026
Special inspection requirement — Concrete - Cast-In-Place
08/12/2026
Special inspection requirement — Masonry
08/12/2026
Special inspection requirement — Subgrade Inspections
Nothing on file for this building.
2 projects · most recent 10/14/2026
Concrete
FiledStatusContractorScope
10/14/2026——3 scope_items
10/14/2026——Concrete
1 project · most recent 10/14/2026
Fence
FiledStatusContractorScope
10/14/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/12/2026Final—progress
08/12/2026Concrete - Cast-In-Place—special
08/12/2026Masonry—special
08/12/2026Subgrade Inspections—special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Arena RenewablesSports / RecreationFloor 1
Project B01441474 Alteration CO · Plan Examiner Review · 10/01/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
10/15/2026B01444791-I1Request digital key ↗
10/04/2026B01441474-I1Request digital key ↗
10/04/2026B01441474-S2Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
10/15/2026B01444791-I1Open ↗
10/04/2026B01441474-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
10/04/2026B01441474-I1Open ↗