← Back
BuildNYC
QUEENS
135-15 218TH STREET
QUEENS · Laurelton · BIN 4626286
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
8 Active Violations 7 unresolved · 1 paperwork only ▸
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21 filing · 14 docs
Floor 11 filing · 14 docs
Cellar1 filing · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/04/2025$700K—Private party → CHAI 5555 LLC$402/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sion Consulting Engineering510/14/2026
Building Lifecycle
All (55)Filed (5)Violation (8)Objection (12)Special Inspection (30)
10/14/2026
Filed — New Building
THIS APPLICATION IS FILED FOR 33.34 FEET FRONTAGE BPP
Q01457911-S3
10/07/2026
Objection raised — Other
10/07/2026
Objection raised — Other
10/02/2026
Objection raised — Other
10/02/2026
Objection raised — Other
10/02/2026
Objection raised — Other
10/02/2026
Objection raised — Other
10/02/2026
Objection raised — Other
10/02/2026
Objection resolved — Resolved
10/01/2026
Objection raised — Other
09/29/2026
Objection raised — Energy
09/28/2026
Objection raised — Other
09/28/2026
Objection raised — Other
09/17/2026
Filed — New Building
THIS APPLICATION IS FILED FOR 33.34 FEET FRONTAGE BPP
Q01457911-S4
09/17/2026
Filed — New Building
THIS APPLICATION IS FILED FOR 33.34 FEET FRONTAGE BPP
Q01457911-S2
09/16/2026
Filed — New Building
THIS APPLICATION IS FILED FOR 33.34 FEET FRONTAGE BPP
Q01457911-S1
09/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/16/2026
Special inspection requirement — Permanent certificate
09/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/16/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
09/16/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
09/16/2026
Special inspection requirement — Maintenance information
09/16/2026
Special inspection requirement — Energy Code Compliance Inspections
09/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/11/2026
Filed — New Building
THIS APPLICATION IS FILED FOR 33.34 FEET FRONTAGE BPP
Q01457911-I1
09/11/2026
Special inspection requirement — Air barrier — testing
09/09/2026
Special inspection requirement — Footing and Foundation
09/09/2026
Special inspection requirement — Energy Code Compliance Inspections
09/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/09/2026
Special inspection requirement — Preliminary
09/09/2026
Special inspection requirement — Structural Wood Frame
09/09/2026
Special inspection requirement — Fenestration air leakage
09/09/2026
Special inspection requirement — Protection of exposed foundation insulation
09/09/2026
Special inspection requirement — Lighting in dwelling units
09/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/09/2026
Special inspection requirement — Maintenance information
09/09/2026
Special inspection requirement — Fenestration areas
09/09/2026
Special inspection requirement — Permanent certificate
09/09/2026
Special inspection requirement — Metering
09/09/2026
Special inspection requirement — Electric vehicle service equipment requirements
09/09/2026
Special inspection requirement — Air barrier - visual inspection
09/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/09/2026
Special inspection requirement — Ventilation and air distribution system
09/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/09/2026
Special inspection requirement — Insulation placement and R values
03/03/2026
Violation issued (ECB, open)
Construction
10/29/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/29/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/22/2025
Violation issued (ECB, open)
Construction
06/09/2025
Violation issued (ECB, open)
Construction
06/09/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Nothing on file for this building.
1 project · most recent 10/14/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/14/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Cooper & Hunter CH-N60LCU-230VO 60,000 BTU · Heat Pump Outdoor ×3
Ventilation
Honeywell VNT5200E1000/U 200 CFM · Erv ×3
Fantech FIT80E 80 CFM · Erv ×2
1 project · most recent 10/14/2026
Storm Water/Sanitary
FiledStatusContractorScope
10/14/2026——Storm, Water/Sanitary
1 project · most recent 10/14/2026
Wood
FiledStatusContractorScope
10/14/2026——Wood
1 project · most recent 10/14/2026
Fence
FiledStatusContractorScope
10/14/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
09/16/2026Fire-Resistant Penetrations and Joints—special
09/16/2026HVAC-R and service water heating system controls—energy_progress
09/16/2026Permanent certificate—energy_progress
09/16/2026HVAC-R and service water piping design and insulation—energy_progress
09/16/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
09/16/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
09/16/2026Maintenance information—energy_progress
09/16/2026Energy Code Compliance Inspections—progress
09/16/2026HVAC-R and service water heating equipment—energy_progress
09/11/2026Air barrier — testing —energy_progress
09/09/2026Footing and Foundation—progress
09/09/2026Energy Code Compliance Inspections—progress
09/09/2026Fire-Resistance Rated Construction—progress
09/09/2026Preliminary—progress
09/09/2026Structural Wood Frame—progress
09/09/2026Fenestration air leakage—energy_progress
09/09/2026Protection of exposed foundation insulation—energy_progress
09/09/2026Lighting in dwelling units—energy_progress
09/09/2026HVAC-R and service water piping design and insulation—energy_progress
09/09/2026Maintenance information—energy_progress
09/09/2026Fenestration areas—energy_progress
09/09/2026Permanent certificate—energy_progress
09/09/2026Metering—energy_progress
09/09/2026Electric vehicle service equipment requirements—energy_progress
09/09/2026Air barrier - visual inspection—energy_progress
Latest 25 of 39.
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
10/04/2026Q01457911-I1Request digital key ↗
10/04/2026Q01457911-S4Request digital key ↗
10/04/2026Q01457911-S3Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
10/04/2026Q01457911-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature5
10/04/2026Q01457911-S4Open ↗
10/04/2026Q01457911-S1Open ↗
10/04/2026Q01457911-S3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
10/04/2026Q01457911-S3Open ↗
10/04/2026Q01457911-I1Open ↗
▸DOB NOWStreet Trees: Receipt Of Street Trees Site Plan P241
10/04/2026Q01457911-S3Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
10/04/2026Q01457911-I1Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial2
10/04/2026Q01457911-S3Open ↗
10/04/2026Q01457911-I1Open ↗
▸DOB NOWExisting Sidewalk Photographs1
10/04/2026Q01457911-S3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
10/04/2026Q01457911-I1Open ↗
▸DOB NOWProperty Ownership Certification1
10/04/2026Q01457911-I1Open ↗