← Back
Zoned residential, not Manhattan
BREWSTER STREET
STATEN ISLAND · Tompkinsville-Stapleton-Clifton-Fox Hills · BIN 5802609
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3XZoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · 2,500 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanical
Roof3p · 3 filings · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UPC ENGINEERING DPC209/22/2025
CHUN FENG, ARCHITECT108/29/2024
YEN TOY112/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UPC ENGINEERING DPC203/21/2026
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERGY SOLAR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802108/29/2024
YEN TOY & ASSOC-ARCHITECT6294112/08/2021
Building Lifecycle
All (38)Filed (4)Permit Issued (1)Inspection (1)Objection (2)Special Inspection (30)
06/07/2026
Special inspection requirement — Heating Systems
06/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/07/2026
Special inspection requirement — Structural Cold-Formed Steel
06/07/2026
Special inspection requirement — Masonry
06/07/2026
Special inspection requirement — Mechanical Systems
06/07/2026
Special inspection requirement — Chimneys and vents
06/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/07/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/07/2026
Special inspection requirement — Concrete - Cast-In-Place
06/07/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
06/07/2026
Special inspection requirement — Energy Code Compliance Inspections
06/07/2026
Special inspection requirement — Final
06/07/2026
Special inspection requirement — Footing and Foundation
06/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/07/2026
Special inspection requirement — Structural Wood Frame
06/07/2026
Special inspection requirement — Ventilation and air distribution system
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Permanent certificate
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Interior lighting power
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Duct leakage testing, insulation and design
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Air barrier - visual inspection
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Protection of exposed foundation insulation
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Air barrier — testing
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Electric vehicle service equipment requirements
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Fenestration air leakage
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Maintenance information
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — Metering
CHUCK CHARK-YUEN YUNG
06/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
CHUCK CHARK-YUEN YUNG
04/03/2026
Objection resolved — Resolved
10/07/2025
Objection raised — Admin
09/22/2025
Filed — New Building
PROPOSE NEW TWO-FAMILY DETACHED HOUSE BUILDING WITH ONE OPEN PARKING SPACE. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
S00852450-P1
10/02/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/04/2024
Permit issued — Solar
S01098028-I1-SL
08/29/2024
Filed — Alteration
S01098028-I1
06/16/2023
Filed — New Building
PROPOSE NEW TWO-FAMILY DETACHED HOUSE BUILDING WITH ONE OPEN PARKING SPACE. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
S00852450-I1
12/08/2021
Filed — New Building
S00577526-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedAMERGY SOLAR INC09/04/2024
1 project · most recent 09/22/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/22/2025——Heating Systems
Heating
Mitsubishi Electric Outdoor Condensing Unit: MXZ-5C42NA3. Indoor Unit EZ Fit Ceiling Cassette: MLZ-KP09NA, MLZ-KP18NA. 53,600 BTU · Split System ×10
Outdoor Condensing Unit: MXZ-4C36NA3. Indoor Unit Horizontal-ducted: SEZ-KD18NA4. 43,000 BTU · Split System ×3
1 project · most recent 08/28/2024
FiledStatusContractorScope
08/28/2024Permit IssuedI.P. ELECTRIC INC—
1 project · most recent 09/22/2025
Masonry Wood
FiledStatusContractorScope
09/22/2025——Masonry, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/02/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
06/07/2026Heating Systems—special
06/07/2026Fire-Resistant Penetrations and Joints—special
06/07/2026Structural Cold-Formed Steel—special
06/07/2026Masonry—special
06/07/2026Mechanical Systems—special
06/07/2026Chimneys and vents—special
06/07/2026Subsurface Investigations (Borings/Test Pits)—special
06/07/2026Excavations - Sheeting, Shoring, and Bracing—special
06/07/2026Concrete - Cast-In-Place—special
06/07/2026Exterior Insulation and Finish Systems (EIFS)—special
06/07/2026Energy Code Compliance Inspections—progress
06/07/2026Final—progress
06/07/2026Footing and Foundation—progress
06/07/2026Fire-Resistance Rated Construction—progress
06/07/2026Structural Wood Frame—progress
06/07/2026Ventilation and air distribution systemCHUCK CHARK-YUEN YUNGenergy_progress
06/07/2026HVAC-R and service water piping design and insulationCHUCK CHARK-YUEN YUNGenergy_progress
06/07/2026Permanent certificateCHUCK CHARK-YUEN YUNGenergy_progress
06/07/2026Interior lighting powerCHUCK CHARK-YUEN YUNGenergy_progress
06/07/2026Duct leakage testing, insulation and designCHUCK CHARK-YUEN YUNGenergy_progress
06/07/2026HVAC-R and service water heating system controlsCHUCK CHARK-YUEN YUNGenergy_progress
06/07/2026Air barrier - visual inspectionCHUCK CHARK-YUEN YUNGenergy_progress
06/07/2026Protection of exposed foundation insulationCHUCK CHARK-YUEN YUNGenergy_progress
06/07/2026Fenestration and door U-factor and product ratingsCHUCK CHARK-YUEN YUNGenergy_progress
06/07/2026Air barrier — testing CHUCK CHARK-YUEN YUNGenergy_progress
Latest 25 of 32.
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026S00577526-I1Request digital key ↗
08/21/2026S01098028-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026S00852450-I1Open ↗
08/13/2026S00852450-P1Open ↗
08/13/2026S00852450-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026S00852450-P1Open ↗
08/13/2026S00852450-P2Open ↗
08/13/2026S00852450-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00852450-I1Open ↗
08/13/2026S00852450-P1Open ↗
08/13/2026S00852450-P2Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S00577526-I1Open ↗
08/13/2026S01098028-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026S00852450-P2Open ↗
08/13/2026S00852450-P1Open ↗
08/13/2026S00852450-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026S00577526-I1Open ↗
08/13/2026S00852450-P1Open ↗
08/13/2026S00852450-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026S00852450-I1Open ↗
08/13/2026S00852450-P2Open ↗
08/13/2026S00852450-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00852450-I1Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00852450-P1Open ↗
08/13/2026S00577526-I1Open ↗
08/13/2026S00852450-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S00852450-P2Open ↗
08/13/2026S00852450-P1Open ↗
08/13/2026S00852450-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00577526-I1Open ↗