RoofUnder Construction64p · 4 filings · 10 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
FILING TO REPAIR CRACKED BRICKS, OPEN MORTAR JOINTS, CRACKED PRE-CAST CONCRETE, WINDOW SILLS, REPLACE CAULK JOINTS, REPAIR EXPANSION JOINTS, AND RESET COPING STONES AT PARAPET. NO ROOF WORK, NO CHANGE IN EGRESS, AND NO CHANGE IN OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Bulkhead13p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 13 drawing sheets
Floor 571p · 1 filing · 2 docs
Plumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 561p · 1 filing · 2 docs
Plumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 551p · 1 filing · 2 docs
Plumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 541p · 1 filing · 2 docs
Plumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 531p · 1 filing · 2 docs
Plumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 521p · 1 filing · 2 docs
Plumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 511p · 1 filing · 2 docs
Plumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 501p · 1 filing · 2 docs
Plumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 491p · 1 filing · 2 docs
Plumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 482p · 1 filing · 2 docs
Fire ProtectionPlumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 2 drawing sheets
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 391p · 1 filing · 2 docs
Mechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 311p · 1 filing · 2 docs
Structural
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 301p · 1 filing · 2 docs
Architecture
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 291p · 1 filing · 2 docs
Fire Protection
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 281p · 1 filing · 2 docs
Mechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 1 drawing sheet
Floor 272p · 1 filing · 2 docs
Mechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 2 drawing sheets
Floor 262p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 2 drawing sheets
Floor 252p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 2 drawing sheets
Floor 242p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 2 drawing sheets
Floor 234p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 4 drawing sheets
Floor 222p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 2 drawing sheets
Floor 213p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 3 drawing sheets
Floor 203p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 3 drawing sheets
Floor 194p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 4 drawing sheets
Floor 184p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 4 drawing sheets
Floor 175p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 5 drawing sheets
Floor 163p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 3 drawing sheets
Floor 154p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 4 drawing sheets
Floor 143p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 3 drawing sheets
Floor 133p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 3 drawing sheets
Floor 125p · 1 filing · 2 docs
ArchitectureMechanical
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 5 drawing sheets
Floor 114p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 4 drawing sheets
Floor 106p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 6 drawing sheets
Floor 95p · 1 filing · 2 docs
ArchitectureMechanicalPlumbingStructural
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 5 drawing sheets
Floor 811p · 1 filing · 2 docs
ArchitectureElectricalMechanicalPlumbingStructural
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 11 drawing sheets
Floor 715p · 2 filings · 12 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Minor alteration to exit passageway and exit discharge at 1st floor.
On file for this project
10 documents · 1 drawing sheet
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 14 drawing sheets
Floor 615p · 2 filings · 12 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Minor alteration to exit passageway and exit discharge at 1st floor.
On file for this project
10 documents · 1 drawing sheet
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 14 drawing sheets
Floor 519p · 2 filings · 12 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Minor alteration to exit passageway and exit discharge at 1st floor.
On file for this project
10 documents · 1 drawing sheet
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 18 drawing sheets
Floor 420p · 2 filings · 12 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Minor alteration to exit passageway and exit discharge at 1st floor.
On file for this project
10 documents · 1 drawing sheet
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 19 drawing sheets
Floor 328p · 2 filings · 12 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Minor alteration to exit passageway and exit discharge at 1st floor.
On file for this project
10 documents · 1 drawing sheet
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 27 drawing sheets
Floor 252p · 2 filings · 12 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralZ
Minor alteration to exit passageway and exit discharge at 1st floor.
On file for this project
10 documents · 1 drawing sheet
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 51 drawing sheets
Floor 160p · 3 filings · 15 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
INSTALLATION OF SELF CONTAINED AIR CONDITIONING SYSTEM ON FLOOR 001, WITH A TOTAL CAPACITY OF 15 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Minor alteration to exit passageway and exit discharge at 1st floor.
On file for this project
10 documents · 2 drawing sheets
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 58 drawing sheets
Mezzanine9p · 1 filing · 2 docs
ArchitectureDMPlumbingStructural
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 9 drawing sheets
Cellar57p · 1 filing · 2 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 57 drawing sheets
Sub-Cellar4p · 1 filing · 2 docs
ArchitectureGeneralMechanicalStructural
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 4 drawing sheets
Basement7p · 1 filing · 2 docs
ArchitectureDMPlumbing
Addition of a dry pipe sprinkler system for the 8th floor corridor only. No change in use, egress, or occupancy under this application.
On file for this project
2 documents · 7 drawing sheets