← Back
Elevator apt, fireproof without stores
The Cedar Tower
CEDAR STREET · BIN 3429267
💬 Discuss this project
2023Year Built
19Stories
D3Building Class
R6Zoning
118,265 sfGross Floor Area
139Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: CEDAR TOWER LLC · 15,000 sf lot · 7.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof237p · 2 filings · 20 docs
Floor 121p · 1 filing · 2 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4218p · 1 filing · 20 docs
Floor 3221p · 1 filing · 20 docs
Floor 2234p · 1 filing · 20 docs
Floor 1227p · 1 filing · 20 docs
Cellar229p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP2007/08/2026
CEDAR TOWER LLC303/22/2026
CITY BUILDERS NYC1803/22/2026
BTE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING6603/21/2026
AE DESIGN SOLUTION2003/21/2026
JM ZONING, LLC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY BUILDERS NYC LLCGeneral Contractor2107/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor2007/08/2026
PRIME PIPING & HEATING INFire Protection607/08/2026
STAR ELECL CONTRACTORS C 003267General Contractor303/22/2026
MOSES ROSENBERGERElectrical303/21/2026
FQE ELECTRIC LLC 004868General Contractor303/22/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
FQE ELECTRIC LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91682312/24/2025
LEO Y LEE ASSOCIATES2481208/25/2023
CITYSCAPE ENGINEERING, PL5517204/17/2023
REGIONAL TESTING CORP.394302/07/2023
Building Lifecycle
All (201)Filed (44)Permit Issued (31)Signed Off (17)Violation (25)Inspection (16)Objection (38)Special Inspection (30)
02/28/2026
Violation issued (FDNY_NOV, closed)
02/28/2026
Violation issued (FDNY_NOV, closed)
02/13/2026
Signed off — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-I1
12/31/2025
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
12/31/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Soorjbally Harilall
12/31/2025
Special inspection requirement — Air barrier continuity plan testing
Soorjbally Harilall
12/31/2025
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
12/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
12/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
12/31/2025
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
12/31/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
12/31/2025
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
12/31/2025
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
12/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
12/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
12/31/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
12/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
12/31/2025
Special inspection requirement — Metering
Soorjbally Harilall
12/31/2025
Special inspection requirement — Interior lighting power
Soorjbally Harilall
12/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
12/31/2025
Special inspection requirement — Maintenance information
Soorjbally Harilall
12/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
12/31/2025
Special inspection requirement — Lighting controls
Soorjbally Harilall
12/31/2025
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
12/31/2025
Special inspection requirement — Fenestration areas
Soorjbally Harilall
12/24/2025
Filed — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-B7
12/24/2025
Special inspection requirement — Fenestration areas
Soorjbally Harilall
12/24/2025
Special inspection requirement — Air barrier continuity plan testing
Soorjbally Harilall
12/24/2025
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
12/24/2025
Special inspection requirement — Maintenance information
Soorjbally Harilall
12/24/2025
Special inspection requirement — Interior lighting power
Soorjbally Harilall
12/24/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
12/24/2025
Special inspection requirement — Metering
Soorjbally Harilall
12/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
09/15/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2025
Violation issued (ECB, closed)
Construction
08/19/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/06/2025
Filed — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-B4
06/16/2025
Violation issued (HPD, closed)
A
04/21/2025
Signed off — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-S4
04/18/2025
Signed off — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-S1
04/18/2025
Signed off — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-S2
04/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/17/2025
Signed off — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-S3
10/29/2024
Filed — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-B3
10/08/2024
Violation issued (ECB, closed)
Construction
09/24/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OROCCUPANCY.
B00886901-I1
09/19/2024
Filed — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-B2
09/18/2024
Signed off — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-S7
09/18/2024
Signed off — New Building
Plumbing Specifications filed in conjunction with NB
B00653212-S6
09/18/2024
Permit issued — Construction Fence
B00886901-I1-FN
09/17/2024
Signed off — Alteration
Installation of temporary air pressurized standpipe system during construction per LL 64/09, in conjunction with NB B00653212
B00672398-I1
09/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB #B00653212-I1
B00674627-I1
08/29/2024
Permit issued — Curb Cut
B00653212-S4-CC
08/28/2024
Filed — Alteration
Filing for tenant protection plan in conjunction with NB #B00653212.
B01097657-I1
08/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/12/2024
Violation issued (ECB, closed)
Unknown
08/12/2024
Violation issued (ECB, closed)
Unknown
07/30/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00874403-I1
Latest 60 of 201 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offCITY BUILDERS NYC09/18/2024
DOB NOWCurb CutSigned-offCITY BUILDERS NYC08/29/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/03/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC05/10/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/10/2024
DOB NOWConstruction FenceSigned-offCITY BUILDERS NYC05/01/2024
DOB NOWGeneral ConstructionPermit IssuedCITY BUILDERS NYC03/20/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN03/12/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC02/27/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC02/26/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC02/26/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/30/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/10/2023
DOB NOWStructuralSigned-offCITY BUILDERS NYC06/05/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC05/23/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/17/2023
DOB NOWEarth WorkSigned-offCITY BUILDERS NYC05/11/2023
DOB NOWConstruction FenceSigned-offCITY BUILDERS NYC05/03/2023
DOB NOWStructuralSigned-offCITY BUILDERS NYC04/26/2023
DOB NOWMechanical SystemsSigned-offCITY BUILDERS NYC03/16/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN03/16/2023
DOB NOWGeneral ConstructionPermit IssuedCITY BUILDERS NYC03/14/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC03/02/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC03/01/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC03/01/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC11/04/2022
DOB NOWSupport of ExcavationSigned-offCITY BUILDERS NYC05/27/2022
DOB NOWEarth WorkSigned-offCITY BUILDERS NYC05/09/2022
DOB NOWConstruction FenceSigned-offCITY BUILDERS NYC05/06/2022
1 project · most recent 12/24/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/24/2025Signed-offCITY BUILDERS NYC LLCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PURY-P120TNU-A 120,000 BTU · Vrf Outdoor ×19
MXZ-SM36NAM-U1 36,000 BTU · Heat Pump Outdoor ×12
PURY-P96TNU-A 96,000 BTU · Vrf Outdoor ×8
PUHY-P96TNU-A 96,000 BTU · Vrf Outdoor ×2
PUZ-A36NKA7 36,000 BTU · Heat Pump Outdoor ×2
Amana PMH073G15AXXX 7,600 BTU · Ptac ×1
Heating
Qmark ECP1524 5,120 BTU · Electric Heater ×42
Indeeco ULIR 12,800 BTU · Electric Heater ×5
Ventilation
Greenheck GJX-41-160-0623-M30 6,010 CFM · Exhaust Fan ×4
G-120-VG 1,680 CFM · Exhaust Fan ×2
AX-41-160-0415-M20 3,000 CFM · Exhaust Fan ×1
AX-47-160-0411-A3 2,000 BTU · Exhaust Fan ×1
AX-72-190-0415-A13 11,200 CFM · Exhaust Fan ×1
CUE-095-VG 480 CFM · Exhaust Fan ×1
G-100-VG 960 CFM · Exhaust Fan ×1
G-99-VG 810 CFM · Exhaust Fan ×1
SCR3-24-410-A 3,000 CFM · Exhaust Fan ×1
SQ-90 360 CFM · Exhaust Fan ×1
Enervex BEF 355x 1,620 CFM · Exhaust Fan ×2
Renewaire HE1.5XRTH-F 940 CFM · Erv ×1
1 project · most recent 12/24/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/24/2025Signed-offA M B MECHANICAL INCGas, Storm, Water/Sanitary
7 projects · most recent 07/31/2025
General Wiring
FiledStatusContractorScope
07/31/2025CompleteSTAR ELEC'L CONTRACTORS C—
05/30/2025CompleteSTAR ELEC'L CONTRACTORS C—
05/22/2025CompleteFQE ELECTRIC LLCGeneral Wiring
08/02/2023CompleteFQE ELECTRIC LLC1 meters, 1 new_meters
05/19/2023CompleteSOLAS ELECTRICAL CORP—
11/04/2022CompleteSOLAS ELECTRICAL CORP—
05/12/2022CompleteCONTACT ELECTRIC CORPGeneral Wiring
1 project · most recent 12/24/2025
Concrete
FiledStatusContractorScope
12/24/2025Signed-offCITY BUILDERS NYC LLCConcrete
1 project · most recent 12/24/2025
Earthwork
FiledStatusContractorScope
12/24/2025Signed-offCITY BUILDERS NYC LLCEarthwork
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
04/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
08/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/23/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
05/23/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/21/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/15/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/22/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
06/29/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
06/29/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/05/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/05/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/21/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
12/31/2025Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
12/31/2025Air barrier - visual inspectionSoorjbally Harilallenergy_progress
12/31/2025Lighting in dwelling unitsSoorjbally Harilallenergy_progress
12/31/2025Exterior lighting powerSoorjbally Harilallenergy_progress
12/31/2025Fenestration areasSoorjbally Harilallenergy_progress
12/31/2025Insulation placement and R valuesSoorjbally Harilallenergy_progress
12/31/2025Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
12/31/2025Lighting controlsSoorjbally Harilallenergy_progress
12/31/2025HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
12/31/2025Air barrier continuity plan testingSoorjbally Harilallenergy_progress
12/31/2025Fenestration air leakageSoorjbally Harilallenergy_progress
12/31/2025Maintenance informationSoorjbally Harilallenergy_progress
12/31/2025Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
12/31/2025Electrical motors and elevatorsSoorjbally Harilallenergy_progress
12/31/2025Interior lighting powerSoorjbally Harilallenergy_progress
12/31/2025MeteringSoorjbally Harilallenergy_progress
12/31/2025HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
12/31/2025HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
12/31/2025Energy Code Compliance InspectionsSoorjbally Harilallprogress
12/31/2025Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
12/31/2025Alternative Materials - OTCR Buildings Bulletin NumberSoorjbally Harilallspecial
12/31/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
12/24/2025Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
12/24/2025Lighting controlsSoorjbally Harilallenergy_progress
12/24/2025HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
Latest 25 of 150.
▾Documents — 283 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch44
08/31/2026B00672398-I1Request digital key ↗
08/31/2026B00672398-P1Request digital key ↗
08/27/2026B00874403-I1Request digital key ↗
Showing 3 of 44 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
08/15/2023340834235Open ↗
02/16/2022340834235Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/16/2022340834235Open ↗
▸Zoning, Tax Lot & Property Records46
▸DOB NOWRestrictive Declaration/Easement 122
08/13/2026B00653212-A1Open ↗
08/13/2026B00653212-B7Open ↗
08/13/2026B00653212-S6Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram10
08/13/2026B00653212-B4Open ↗
08/13/2026B00653212-A1Open ↗
08/13/2026B00653212-B1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZoning Exhibit form (1-5)10
08/13/2026B00653212-A1Open ↗
08/13/2026B00653212-B7Open ↗
08/13/2026B00653212-A2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWRestrictive Declaration/Easement 22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/16/2022340834235Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications105
▸DOB NOWDPL-1: Design Professional Seal & Signature44
08/28/2026B00674627-I1Open ↗
08/28/2026B00674627-P1Open ↗
08/28/2026B00674627-P2Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/27/2026B00653212-P4Open ↗
09/27/2026B00653212-P4Open ↗
09/27/2026B00653212-P4Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/21/2026B00653212-A1Open ↗
09/21/2026B00653212-A1Open ↗
09/19/2026B00653212-P8Open ↗
Showing 3 of 24 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/16/2022340834235Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/26/2026B00653212-I1—
▸Safety & Tenant Protection17
▸DOB NOWStreet Tree Checklist10
08/26/2026B00653212-B4Open ↗
08/26/2026B00653212-B3Open ↗
08/26/2026B00653212-B1Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST2
10/06/2022340834235Open ↗
02/16/2022340834235Open ↗
▸BISBPP: STREET TREES SITE PLAN1
09/21/2022340834235Open ↗
▸BISSTREET TREE SIGNOFF1
04/08/2025340834235Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026B00653212-S6Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00653212-S6Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00653212-S6Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
08/22/2023340834235Open ↗
09/21/2022340834235Open ↗
09/09/2022340834235Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/16/2022340834235Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/16/2022340834235Open ↗
▸Other Documents44
▸DOB NOWProperty Ownership Certification16
08/26/2026B00653212-P1Open ↗
08/26/2026B00653212-B4Open ↗
08/26/2026B00653212-B3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSite Survey: Initial10
08/13/2026B00653212-A2Open ↗
08/13/2026B00653212-B1Open ↗
08/13/2026B00653212-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
08/22/2023340834235Open ↗
09/21/2022340834235Open ↗
09/09/2022340834235Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00653212-S6Open ↗
08/13/2026B00653212-S5Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/16/2022340834235Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00653212-I1Open ↗