← Back
Two family brick
CLARENCE AVENUE
BRONX · BIN 2072970
💬 Discuss this project
2024Year Built
3Stories
B1Building Class
R4AZoning
3,310 sfGross Floor Area
2Units
Two family brick · 3,563 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalFire ProtectionCivil
Floor 28p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar11p · 1 filing · 20 docs
Basement7p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC102/26/2025
AMERILAND BROOK LLC601/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERGY SOLAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EZ BUILDER CORPGeneral Contractor1307/08/2026
AMERGY SOLAR INCGeneral Contractor303/21/2026
MPS PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802102/26/2025
AMERILAND BROOK LLC1506401/06/2025
Building Lifecycle
All (75)Filed (7)Permit Issued (9)Signed Off (5)Inspection (8)Objection (16)Special Inspection (30)
09/19/2025
Signed off — New Building
FILE PL & SP WORKTYPE IN CONJUNCTION WITH NB JOB#X00838237
X00838237-I1
07/08/2025
Signed off — New Building
FILE PL & SP WORKTYPE IN CONJUNCTION WITH NB JOB#X00838237
X00838237-S2
06/27/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/18/2025
Signed off — New Building
FILE PL & SP WORKTYPE IN CONJUNCTION WITH NB JOB#X00838237
X00838237-S1
06/18/2025
Signed off — New Building
FILE PL & SP WORKTYPE IN CONJUNCTION WITH NB JOB#X00838237
X00838237-S3
05/29/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/19/2025
Permit issued — Curb Cut
X00838237-S2-CC
05/02/2025
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
X01182107-I1
02/28/2025
Permit issued — Solar
X01182107-I1-SL
02/26/2025
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
X01182107-I1
02/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/07/2025
Special inspection requirement — Sprinkler Systems
XIAOHONG ZHAO
01/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
01/07/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
01/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
01/07/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
01/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
01/07/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
01/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
01/07/2025
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
01/06/2025
Filed — New Building
FILE PL & SP WORKTYPE IN CONJUNCTION WITH NB JOB#X00838237
X00838237-P2
12/25/2024
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
12/25/2024
Special inspection requirement — Sprinkler Systems
XIAOHONG ZHAO
12/25/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
12/25/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
12/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
12/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
12/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
12/25/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
12/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
12/03/2024
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Structural Steel - Welding
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Masonry
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Structural Steel - Details
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
12/03/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
11/19/2024
Objection resolved — Addressed
11/11/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
11/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2024
Objection raised — Fire_Protection
11/02/2024
Filed — New Building
FILE PL & SP WORKTYPE IN CONJUNCTION WITH NB JOB#X00838237
X00838237-P1
08/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
08/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/27/2024
Permit issued — Earth Work
X00838237-I1-GC
05/07/2024
Permit issued — Plumbing
X00838237-S1-PL
03/21/2024
Permit issued — Earth Work
X00838237-I1-MS
03/21/2024
Permit issued — Mechanical Systems
X00838237-I1-ST
03/20/2024
Permit issued — Foundation
X00838237-I1-FO-EA
03/19/2024
Permit issued — Foundation
X00838237-I1-GC
01/30/2024
Objection resolved — Addressed
09/02/2023
Objection resolved — Addressed
07/05/2023
Permit issued — Construction Fence
X00838237-S3-FN
05/05/2023
Objection resolved — Addressed
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offEZ BUILDER CORP05/19/2025
DOB NOWSolarSigned-offAMERGY SOLAR INC02/28/2025
DOB NOWEarth WorkPermit IssuedEZ BUILDER CORP06/27/2024
DOB NOWPlumbingSigned-offMPS PLUMBING & HEATING IN05/07/2024
DOB NOWEarth WorkSigned-offEZ BUILDER CORP03/21/2024
DOB NOWMechanical SystemsSigned-offEZ BUILDER CORP03/21/2024
DOB NOWFoundationSigned-offEZ BUILDER CORP03/20/2024
DOB NOWFoundationPermit IssuedEZ BUILDER CORP03/19/2024
DOB NOWConstruction FenceSigned-offEZ BUILDER CORP07/05/2023
BIS—ISSUEDEZ BUILDER CORP07/17/2023
1 project · most recent 01/06/2025
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/06/2025Signed-offEZ BUILDER CORPAssociated Ducts and Piping, Heating Systems
Heating
Williamson GWA-100-N-T 100,000 BTU · Boiler ×4
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×14
Air King EB30BL 130 CFM · Kitchen Exhaust ×4
1 project · most recent 01/06/2025
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
01/06/2025Signed-offMPS PLUMBING & HEATING INGas, Plumbing-Sprinkler, Storm, Water/Sanitary
2 projects · most recent 04/15/2025
General Wiring
FiledStatusContractorScope
04/15/2025CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
04/03/2025CompleteI.P. ELECTRIC INC—
1 project · most recent 01/06/2025
Concrete Masonry Wood
FiledStatusContractorScope
01/06/2025Signed-offEZ BUILDER CORPConcrete, Masonry, Wood
1 project · most recent 01/06/2025
Fence
FiledStatusContractorScope
01/06/2025Signed-offEZ BUILDER CORPFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/27/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
05/29/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
02/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/11/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
11/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2024Pass-Final PL - UndergroundPassView ↗
08/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
01/07/2025Sprinkler SystemsXIAOHONG ZHAOspecial
01/07/2025Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
01/07/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
01/07/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
01/07/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
01/07/2025HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
01/07/2025Maintenance informationXIAOHONG ZHAOenergy_progress
01/07/2025HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
01/07/2025HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
12/25/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
12/25/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
12/25/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
12/25/2024Sprinkler SystemsXIAOHONG ZHAOspecial
12/25/2024Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
12/25/2024Maintenance informationXIAOHONG ZHAOenergy_progress
12/25/2024HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
12/25/2024HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
12/25/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
12/03/2024Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
12/03/2024Mechanical SystemsXIAOHONG ZHAOspecial
12/03/2024Structural Steel - DetailsXIAOHONG ZHAOspecial
12/03/2024Heating SystemsXIAOHONG ZHAOspecial
12/03/2024Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
12/03/2024Subgrade InspectionsXIAOHONG ZHAOspecial
12/03/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
Latest 25 of 82.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026X00838237-S2Request digital key ↗
08/20/2026X00838237-S3Request digital key ↗
08/20/2026X00838237-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION4
09/20/2024240347488Open ↗
05/10/2023220749037Open ↗
12/12/2022220749019Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
07/21/2023220749019Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
10/01/2024240347488Open ↗
01/19/2024220749037Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00838237-P1Open ↗
08/13/2026X00838237-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026X00838237-P1Open ↗
08/13/2026X00838237-I1Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/19/2024220749037Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/19/2024220749037Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00838237-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026X00838237-I1Open ↗
08/31/2026X00838237-I1Open ↗
08/28/2026X00838237-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026X00838237-P2Open ↗
08/20/2026X00838237-S1Open ↗
08/20/2026X00838237-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026X00838237-I1Open ↗
08/31/2026X00838237-I1Open ↗
08/28/2026X00838237-P2Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/01/2023240347488Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026X00838237-I1Open ↗
08/13/2026X00838237-P1Open ↗
▸BISGAS CUT-OFF1
07/21/2023220749019Open ↗
▸BISSEWER CUT-OFF1
07/21/2023220749019Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
07/21/2023220749019Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist2
08/15/2026X00838237-I1Open ↗
08/14/2026X00838237-P1Open ↗
▸BISSTREET TREES SITE PLAN1
10/01/2024240347488Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/21/2023220749019Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/21/2023220749019Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
07/21/2023220749019Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
07/21/2023220749019Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/01/2024240347488Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00838237-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00838237-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00838237-I1Open ↗
▸Environmental & Asbestos2
▸BISRODENT CONTROL1
07/21/2023220749019Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/21/2023220749019Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026X00838237-P1Open ↗
08/13/2026X00838237-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026X00838237-P1Open ↗
08/13/2026X00838237-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00838237-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/09/2024240347488Open ↗
07/21/2023220749019Open ↗
07/21/2023220749019Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01182107-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
07/23/2025240347488Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
07/21/2023220749019Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM3
07/21/2023220749019Open ↗
12/12/2022220749019Open ↗
12/12/2022220749037Open ↗
▸BISEFILING COVER SHEET2
12/12/2022220749019Open ↗
12/12/2022220749037Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/01/2023240347488Open ↗
▸Other Documents20
▸BISBPP - SUPPORTING DOCUMENTATION5
07/23/2025240347488Open ↗
07/23/2025240347488Open ↗
07/23/2025240347488Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026X00838237-I1Open ↗
08/13/2026X00838237-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00838237-P1Open ↗
08/13/2026X00838237-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/15/2026X00838237-I1Open ↗
08/14/2026X00838237-P1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
10/01/2024240347488Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
07/21/2023220749019Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/01/2024240347488Open ↗
▸BISRESTRICTION: DEED1
01/19/2024220749037Open ↗
▸BISPLOT DIAGRAM PD11
01/19/2024220749037Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/19/2024220749037Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
07/21/2023220749019Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00838237-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00838237-I1Open ↗