← Back
Zoned residential, not Manhattan
COLON AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5158423
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3-1Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: COLIN PARK CORP. · 2,424 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Basement3p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS309/05/2025
STANLEY M. KREBUSHEVSKI, R.A.112/13/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BETHEL BUILDING CORPGeneral Contractor1007/08/2026
PREMIER PL,HTG & MECH INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472309/05/2025
Building Lifecycle
All (56)Filed (4)Permit Issued (7)Signed Off (3)Inspection (8)Objection (4)Special Inspection (30)
12/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2025
Signed off — New Building
1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00975476-S3
11/20/2025
Signed off — New Building
1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00975476-S2
11/16/2025
Signed off — New Building
1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00975476-S1
11/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/26/2025
Permit issued — General Construction
S00975476-I1-GC
09/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/16/2025
Permit issued — Mechanical Systems
S00975476-S3-MS
09/05/2025
Filed — New Building
1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00975476-S3
05/14/2025
Permit issued — Curb Cut
S00975476-S1-CC
05/12/2025
Filed — New Building
1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00975476-S1
05/12/2025
Permit issued — Foundation
S00975476-I1-ST
05/09/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
12/09/2024
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
12/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
12/09/2024
Special inspection requirement — Heating Systems
Stanislav Pilipenko
12/09/2024
Special inspection requirement — Chimneys and vents
Stanislav Pilipenko
12/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
12/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
12/09/2024
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
12/09/2024
Special inspection requirement — Maintenance information
Stanislav Pilipenko
12/09/2024
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
12/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
11/04/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/22/2024
Permit issued — Plumbing
S00975476-S2-PL
10/15/2024
Filed — New Building
1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00975476-S2
10/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
10/14/2024
Special inspection requirement — Final
Stanislav Pilipenko
10/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
10/14/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
10/14/2024
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
10/14/2024
Special inspection requirement — Maintenance information
Stanislav Pilipenko
10/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
10/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
10/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
10/14/2024
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
10/11/2024
Permit issued — General Construction
S00975476-I1-FO
09/24/2024
Permit issued — Structural
S00975476-I1-GC
03/05/2024
Objection resolved — Addressed
02/10/2024
Objection resolved — Addressed
12/29/2023
Objection raised — Scope
12/29/2023
Objection raised — Inspections
12/13/2023
Filed — New Building
1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.
S00975476-I1
12/11/2023
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
12/11/2023
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
12/11/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
12/11/2023
Special inspection requirement — Final
Stanislav Pilipenko
12/11/2023
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
12/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
12/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
12/11/2023
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBETHEL BUILDING CORP09/26/2025
DOB NOWMechanical SystemsSigned-offBETHEL BUILDING CORP09/16/2025
DOB NOWCurb CutSigned-offBETHEL BUILDING CORP05/14/2025
DOB NOWFoundationSigned-offBETHEL BUILDING CORP05/12/2025
DOB NOWPlumbingSigned-offPREMIER PL,HTG & MECH INC10/22/2024
DOB NOWGeneral ConstructionSigned-offBETHEL BUILDING CORP10/11/2024
DOB NOWStructuralPermit IssuedBETHEL BUILDING CORP09/24/2024
1 project · most recent 09/05/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/05/2025Permit IssuedBETHEL BUILDING CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Comfort Aire RSG14442s1R 55,500 BTU · Split System ×1
N/A N/A - Not Installed 40,000 BTU · Split System ×1
Heating
Comfort Aire GUH92C090C4M 100,000 BTU · Furnace ×1
N/A N/A - Not Installed 75,000 BTU · Furnace ×1
Ventilation
Broan B130E65RS 110 CFM · Erv ×1
N/A N/A - Not Installed 70 CFM · Erv ×1
1 project · most recent 09/05/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/05/2025Signed-offPREMIER PL,HTG & MECH INCGas, Storm, Water/Sanitary
1 project · most recent 05/27/2025
General Wiring
FiledStatusContractorScope
05/27/2025CompleteFLIP CITY ELECT & FIRE LLGeneral Wiring
1 project · most recent 09/05/2025
Wood
FiledStatusContractorScope
09/05/2025Permit IssuedBETHEL BUILDING CORPWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
09/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
12/09/2024HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
12/09/2024Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
12/09/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
12/09/2024Heating SystemsStanislav Pilipenkospecial
12/09/2024Chimneys and ventsStanislav Pilipenkospecial
12/09/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
12/09/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
12/09/2024Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
12/09/2024Maintenance informationStanislav Pilipenkoenergy_progress
12/09/2024Permanent certificateStanislav Pilipenkoenergy_progress
12/09/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
10/14/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
10/14/2024FinalStanislav Pilipenkoprogress
10/14/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
10/14/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
10/14/2024Mechanical SystemsStanislav Pilipenkospecial
10/14/2024Maintenance informationStanislav Pilipenkoenergy_progress
10/14/2024HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
10/14/2024HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
10/14/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
10/14/2024Permanent certificateStanislav Pilipenkoenergy_progress
12/11/2023Concrete - Cast-In-PlaceStanislav Pilipenkospecial
12/11/2023Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
12/11/2023Subgrade InspectionsStanislav Pilipenkospecial
12/11/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
Latest 25 of 41.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026S00975476-S3Request digital key ↗
08/18/2026S00975476-I1Request digital key ↗
08/18/2026S00975476-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
02/26/2024540262507Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00975476-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00975476-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00975476-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026S00975476-S3Open ↗
09/23/2026S00975476-S3Open ↗
08/31/2026S00975476-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026S00975476-S3Open ↗
08/31/2026S00975476-S2Open ↗
08/29/2026S00975476-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026S00975476-I1Open ↗
08/18/2026S00975476-S2Open ↗
08/18/2026S00975476-S3Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/26/2024540262507Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/26/2024540262507Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00975476-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00975476-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00975476-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00975476-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00975476-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
02/26/2024540262507Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00975476-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00975476-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/26/2024540262507Open ↗
▸Other Documents8
▸BISWAIVER OF 7'CLEARANCE TO THE EXISTING TREE1
02/26/2024540262507Open ↗
▸BISWAIVER OF 7'CLEARANCE TO THE EXISTING UTILITY POLE1
02/26/2024540262507Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
02/26/2024540262507Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/26/2024540262507Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00975476-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/18/2026S00975476-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00975476-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00975476-I1Open ↗