| Owner | Filings | Most Recent |
|---|---|---|
| SK DEVELOPMENT | 5 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ANCORA ENGINEERING, PLLC | 1 | 04/02/2025 |
| COSENTINI ASSOCIATES | 2 | 03/31/2025 |
| DXA STUDIO | 1 | 12/17/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 4 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/02/2025 | — | — | Heating and Air Conditioning Systems | Heat / Cool Hitachi HVAHR096B32S 96,000 BTU · Vrf Outdoor ×3 HVAHR120B32S 120,000 BTU · Vrf Outdoor ×3 HVAHR144B32S 144,000 BTU · Vrf Outdoor ×2 PAS-24BUFASDQU/PPIM-B24UFA1DQ 22,000 BTU · Condensing Unit ×1 VAHP036B21S 36,000 BTU · Condensing Unit ×1 Aaon RN-006-3-0-GJAD-BA-A1-OOO-A 1,700 CFM · Rooftop Unit ×1 RN-010-3-0-GJBD-BA-A1-OOO-A 2,485 CFM · Rooftop Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/02/2025 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/02/2025 | — | — | Wood |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/27/2025 | Lighting controls | — | energy_progress |
| 03/27/2025 | Interior lighting power | — | energy_progress |
| 03/11/2025 | Construction Operations Influencing Adjacent Structures | — | special |
| 03/11/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 02/21/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 02/21/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 02/21/2025 | Energy Code Compliance Inspections | — | progress |
| 02/21/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 02/21/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 02/21/2025 | Shutoff dampers | — | energy_progress |
| 12/17/2024 | Fire-Resistance Rated Construction | — | progress |
| 12/17/2024 | Sprayed fire-resistant materials | — | special |
| 12/05/2024 | Final | — | progress |
| 12/05/2024 | Mechanical Systems | — | special |
| 12/03/2024 | Energy Code Compliance Inspections | — | progress |
| 11/01/2024 | Fire-Resistant Penetrations and Joints | — | special |
| 11/01/2024 | Construction Utilizing CLT or SCL, Type IV | — | special |