← Back
Two family brick
COYLE STREET
BROOKLYN · BIN 3430052
💬 Discuss this project
2023Year Built
4Stories
B1Building Class
R5Zoning
2,828 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: YUAN 888 INC. · 3,159 sf lot · 0.9 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITISCAPE CONSULTING LTD1907/08/2026
TOPLINE NYC CONTRACTING407/08/2026
RCM GROUP303/22/2026
SHEPHERD DT CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/23/2025$1.6M—SHEPHERD DT CORP. → YUAN 888 INC.$558/sf building
06/12/2017$151K—Private party → R AND K-3 REALTY 2016 LLC— not available
06/12/2017$180K—R AND K-3 REALTY 2016 LLC → SHEPHERD DT CORP.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION105/24/2023
CITISCAPE CONSULTING LTD504/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITISCAPE CONSULTING LTD1003/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REMAX CONSTRUCTION LLCGeneral Contractor607/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor407/08/2026
MEGA PLBG CORPFire Protection107/08/2026
JV FAST CONSTRUCTION LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519304/26/2023
Building Lifecycle
All (60)Filed (6)Permit Issued (8)Signed Off (6)Violation (3)Inspection (3)Objection (20)Special Inspection (14)
08/07/2024
Signed off — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-S3
07/05/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/13/2024
Permit issued — Curb Cut
B00690655-S3-CC
06/11/2024
Signed off — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-S4
06/11/2024
Signed off — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-S2
06/11/2024
Signed off — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-I1
06/11/2024
Signed off — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-S1
05/20/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/13/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/21/2024
Permit issued — Sprinklers
B00690655-S4-EW-SP
01/31/2024
Permit issued — Construction Fence
B00690655-S2-FN
12/19/2023
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, PIPE SCAFFOLDING AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00877232-I1
09/13/2023
Violation issued (ECB, closed)
Construction
07/17/2023
Objection resolved — Addressed
07/17/2023
Objection resolved — Addressed
06/29/2023
Objection raised — Fire_Protection
06/29/2023
Objection raised — Fire_Protection
06/27/2023
Objection resolved — Addressed
06/27/2023
Objection resolved — Addressed
05/24/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED, PIPE SCAFFOLDING AND NEEDLE BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00877232-I1
05/24/2023
Permit issued — Sidewalk Shed
B00877232-I1-SH
05/24/2023
Permit issued — Supported Scaffold
B00877232-I1-SF
05/17/2023
Violation issued (ECB, closed)
Construction
05/17/2023
Violation issued (ECB, closed)
Construction
04/27/2023
Objection raised — Fire_Protection
04/27/2023
Objection raised — Fire_Protection
04/26/2023
Filed — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-S4
04/25/2023
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
03/02/2023
Permit issued — Foundation
B00690655-I1-FO
03/02/2023
Permit issued — Structural
B00690655-S1-ST
03/01/2023
Objection resolved — Addressed
03/01/2023
Objection resolved — Addressed
02/28/2023
Permit issued — Construction Fence
B00690655-S2-FN
02/27/2023
Objection raised — Scope
02/27/2023
Objection raised — Zoning
02/20/2023
Filed — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-S3
01/31/2023
Objection raised — Scope
01/31/2023
Objection resolved — Addressed
01/31/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
01/31/2023
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
01/31/2023
Special inspection requirement — Sprayed fire-resistant materials
Younes Abouyaala
01/31/2023
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
01/31/2023
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/27/2023
Filed — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-S2
01/27/2023
Objection raised — Energy
01/27/2023
Objection resolved — Addressed
01/27/2023
Objection raised — Admin
01/27/2023
Objection resolved — Addressed
01/27/2023
Objection raised — Inspections
01/27/2023
Objection resolved — Addressed
01/26/2023
Filed — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-I1
01/26/2023
Filed — Alteration
SUBSEQUENT FENCE APPLICATION IN CONJUNCTION WITH APPROVED NB #321802288.
B00690655-S1
01/26/2023
Special inspection requirement — Structural Cold-Formed Steel
Younes Abouyaala
01/26/2023
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
01/26/2023
Special inspection requirement — Designated Seismic System
Younes Abouyaala
01/26/2023
Special inspection requirement — Final
NAVEEN KUMAR
01/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
01/26/2023
Special inspection requirement — Masonry
Younes Abouyaala
03/02/2022
Special inspection requirement — Final
NAVEEN KUMAR
03/02/2022
Special inspection requirement — Footing and Foundation
Younes Abouyaala
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offJV FAST CONSTRUCTION LLC06/13/2024
DOB NOWSprinklersSigned-offREAL PLUMBING CORP03/21/2024
DOB NOWConstruction FenceSigned-offREMAX CONSTRUCTION LLC01/31/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/24/2023
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING05/24/2023
DOB NOWFoundationSigned-offREMAX CONSTRUCTION LLC03/02/2023
DOB NOWStructuralSigned-offREMAX CONSTRUCTION LLC03/02/2023
DOB NOWConstruction FenceSigned-offREMAX CONSTRUCTION LLC02/28/2023
BIS—ISSUEDRCM GROUP INC01/24/2024
BISPLISSUEDVSP MECHANICAL INC09/27/2023
BIS—ISSUEDRCM GROUP INC05/05/2023
BIS—ISSUEDRCM GROUP INC03/28/2023
2 projects · most recent 11/02/2023
General Wiring
FiledStatusContractorScope
11/02/2023CompleteKINGS ELECTRIC CO., INC.General Wiring
06/29/2023CompleteKINGS ELECTRIC CO., INC.3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/05/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/20/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/13/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/25/2023Sprinkler SystemsYounes Abouyaalaspecial
01/31/2023Structural Steel - High Strength BoltingYounes Abouyaalaspecial
01/31/2023Structural Steel - DetailsYounes Abouyaalaspecial
01/31/2023Sprayed fire-resistant materialsYounes Abouyaalaspecial
01/31/2023Structural Steel - WeldingYounes Abouyaalaspecial
01/31/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/26/2023Structural Cold-Formed SteelYounes Abouyaalaspecial
01/26/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
01/26/2023Designated Seismic SystemYounes Abouyaalaspecial
01/26/2023FinalNAVEEN KUMARprogress
01/26/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
01/26/2023MasonryYounes Abouyaalaspecial
03/02/2022FinalNAVEEN KUMARprogress
03/02/2022Footing and FoundationYounes Abouyaalaprogress
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00690655-S2Request digital key ↗
08/27/2026B00690655-S1Request digital key ↗
08/27/2026B00690655-S4Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION17
12/18/2024321802288Open ↗
12/13/2024321802288Open ↗
12/12/2024321802288Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION2
09/27/2023321802288Open ↗
04/07/2023321802288Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/14/2024321802288Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/08/2023340840031Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
12/20/2024321802288Open ↗
03/04/2022321802288Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/03/2022321802288Open ↗
▸BISVERIFY TAX LOT1
10/22/2024321802288Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/04/2022321802288Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/17/2024321802288Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
03/04/2022321802288Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/04/2022321802288Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B00690655-S4Open ↗
09/01/2026B00690655-S1Open ↗
09/01/2026B00690655-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026B00690655-S1Open ↗
08/13/2026B00690655-S4Open ↗
08/13/2026B00690655-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00690655-S1Open ↗
08/27/2026B00690655-I1Open ↗
08/27/2026B00690655-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/08/2022340840031Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/08/2022340840031Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/16/2018321802288Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING5
10/25/2024321802288Open ↗
08/22/2024321802288Open ↗
07/16/2024321802288Open ↗
Showing 3 of 5 on file for this type
▸BISDEP STORMWATER SEWER CERTIFICATION (1
10/30/2024321802288Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HC1
10/30/2024321802288Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
08/06/2024321802288Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/16/2018321802288Open ↗
▸BISSPRINKLER SYSTEMS1
12/14/2023321802288Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/30/2024321802288Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/30/2024321802288Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
08/22/2024321802288Open ↗
▸BISSTANDPIPE (SD) SIGNOFF1
10/30/2024321802288Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/06/2024321802288Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST3
12/26/2024321802288Open ↗
03/03/2022321802288Open ↗
07/16/2018321802288Open ↗
▸BISSTREET TREES SITE PLAN1
08/08/2023340840031Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
03/27/2023321802288Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/27/2023321802288Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/08/2022340840031Open ↗
▸BISSTREET TREE SIGNOFF1
08/06/2024321802288Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/06/2024321802288Open ↗
10/30/2023321802288Open ↗
03/27/2023321802288Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/06/2024321802288Open ↗
10/30/2023321802288Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/02/2024321802288Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/16/2018321802288Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY14
01/06/2025321802288Open ↗
01/06/2025321802288Open ↗
01/06/2025321802288Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/22/2024321802288Open ↗
03/27/2023321802288Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
01/08/2025321802288Open ↗
▸BISSOIL REPORT1
03/03/2022321802288Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/03/2022321802288Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/27/2023321802288Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B00690655-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸BISSCHEDULE A - OCCUPANCY / USE7
12/13/2024321802288Open ↗
12/12/2024321802288Open ↗
07/16/2024321802288Open ↗
Showing 3 of 7 on file for this type
▸BISBSA/CPC APPROVAL1
03/04/2022321802288Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
10/28/2024321802288Open ↗
▸BISFOUNDATION PLAN APPROVAL1
03/27/2023321802288Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
10/30/2024321802288Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/06/2024340840031Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
04/07/2023321802288Open ↗
▸BISCOST AFFIDAVIT1
07/16/2018321802288Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION10
12/24/2024321802288Open ↗
12/24/2024321802288Open ↗
12/20/2024321802288Open ↗
Showing 3 of 10 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/08/2023340840031Open ↗
▸BISEFILING COVER SHEET1
07/16/2018321802288Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/08/2022340840031Open ↗
▸Other Documents13
▸BISBPP - SUPPORTING DOCUMENTATION3
08/08/2023340840031Open ↗
08/08/2023340840031Open ↗
04/08/2022340840031Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
08/08/2023340840031Open ↗
03/04/2022321802288Open ↗
02/03/2022321802288Open ↗
▸BISPLOT DIAGRAM3
08/06/2024321802288Open ↗
08/31/2018321802288Open ↗
07/16/2018321802288Open ↗
▸BISBSA VARIANCE1
10/28/2024321802288Open ↗
▸BISBPP: FILING REQUIRED1
03/04/2022321802288Open ↗
▸BISVIOLATIONS SEARCH1
10/30/2024321802288Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
10/30/2024321802288Open ↗