← Back
Over six families without stores
DELMONICO PLACE
BROOKLYN · BIN 3428846
💬 Discuss this project
2022Year Built
4Stories
C1Building Class
R6AZoning
5,768 sfGross Floor Area
8Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: P36 LLC · 1,770 sf lot · 3.26 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof2p · 4 filings · 20 docs
Bulkhead3p · 2 filings · 11 docs
Floor 46p · 4 filings · 20 docs
Floor 35p · 3 filings · 20 docs
Floor 24p · 4 filings · 20 docs
Floor 15p · 4 filings · 20 docs
Cellar5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
P36903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/11/2019$1.2M—Private party → P36 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC710/12/2023
TITAN ENGINEERS PC101/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSB WORKS INCGeneral Contractor1203/22/2026
PIPE SOLUTIONS ADVIS INCPlumbing307/08/2026
NEW YORK STANDARD MECH COFire Protection107/08/2026
MPI PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616610/12/2023
Building Lifecycle
All (68)Filed (8)Permit Issued (5)Signed Off (4)Violation (8)Inspection (9)Objection (4)Special Inspection (30)
11/18/2025
Violation issued (HPD, closed)
I
11/29/2024
Violation issued (HPD, closed)
I
04/18/2024
Violation issued (HPD, closed)
A
01/25/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/20/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/30/2023
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #321592095.
B00372068-I1
10/30/2023
Signed off — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #321592095.
B00370093-I1
10/18/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
10/18/2023
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
10/18/2023
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
10/18/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
10/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/18/2023
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
10/12/2023
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #321592095.
B00372068-P2
10/12/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
10/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/10/2023
Signed off — Alteration
MECHANICAL APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB # 321592095.
B00370133-I1
10/10/2023
Filed — Alteration
SPRINKLER APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #321592095.
B00370093-P1
09/28/2023
Permit issued — Mechanical Systems
B00370133-I1-MS
09/28/2023
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
09/28/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/28/2023
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
09/28/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
09/28/2023
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
09/27/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/26/2023
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
09/26/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
09/26/2023
Special inspection requirement — Heating Systems
FAHAD FATEH
09/26/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/26/2023
Special inspection requirement — Final
FAHAD FATEH
09/26/2023
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
09/26/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
09/26/2023
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
09/26/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/20/2023
Objection resolved — Addressed
09/19/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/18/2023
Signed off — Alteration
STRUCTURAL APPLICATION FILED IN CONJUNCTION TO NEW BUILDING JOB #3215921095.
B00413389-I1
07/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/12/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/05/2023
Permit issued — Sprinklers
B00370093-I1-EW-SP
06/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2023
Violation issued (ECB, closed)
Unknown
06/05/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/01/2023
Violation issued (ECB, closed)
Unknown
06/01/2023
Violation issued (ECB, closed)
Construction
06/01/2023
Violation issued (ECB, closed)
Construction
05/23/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/16/2023
Permit issued — Plumbing
B00372068-I1-PL
08/16/2022
Permit issued — Structural
B00413389-I1-ST
07/20/2022
Violation issued (ECB, closed)
Unknown
04/29/2022
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #321592095.
B00372068-P1
01/26/2022
Objection raised — Admin
01/26/2022
Objection resolved — Addressed
01/11/2022
Filed — Alteration
STRUCTURAL APPLICATION FILED IN CONJUNCTION TO NEW BUILDING JOB #3215921095.
B00413389-I1
01/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/11/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/11/2022
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJSB WORKS INC09/28/2023
DOB NOWSprinklersSigned-offNEW YORK STANDARD MECH CO07/05/2023
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC05/16/2023
DOB NOWStructuralSigned-offJSB WORKS INC08/16/2022
DOB NOWPlumbingSigned-offYG SERVICES INC12/10/2021
BIS—ISSUEDJSB WORKS INC07/11/2023
BIS—ISSUEDJSB WORKS INC07/06/2022
BIS—ISSUEDJSB WORKS INC07/06/2022
BIS—ISSUEDY.N.H. CONSTRUCTION INC01/27/2022
BIS—ISSUEDY.N.H. CONSTRUCTION INC01/27/2022
BIS—ISSUEDY.N.H. CONSTRUCTION INC11/30/2021
BIS—ISSUEDY.N.H. CONSTRUCTION INC11/30/2021
1 project · most recent 10/31/2023
General Wiring
FiledStatusContractorScope
10/31/2023CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
01/25/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/20/2023Fail-Final General Construction Non-Directive 14FailView ↗
09/27/2023Pass-Final PL - UndergroundPassView ↗
09/19/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/23/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
10/18/2023Maintenance informationFAHAD FATEHenergy_progress
10/18/2023HVAC and service water heating system controls FAHAD FATEHenergy_progress
10/18/2023HVAC and service water heating equipment FAHAD FATEHenergy_progress
10/18/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
10/18/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
10/18/2023HVAC insulation and sealing FAHAD FATEHenergy_progress
10/12/2023Sprinkler SystemsFAHAD FATEHspecial
10/12/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/28/2023HVAC insulation and sealing FAHAD FATEHenergy_progress
09/28/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
09/28/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/28/2023HVAC and service water heating equipment FAHAD FATEHenergy_progress
09/28/2023Maintenance informationFAHAD FATEHenergy_progress
09/28/2023HVAC and service water heating system controls FAHAD FATEHenergy_progress
09/26/2023HVAC insulation and sealing FAHAD FATEHenergy_progress
09/26/2023Mechanical SystemsFAHAD FATEHspecial
09/26/2023Heating SystemsFAHAD FATEHspecial
09/26/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
09/26/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/26/2023FinalFAHAD FATEHprogress
09/26/2023HVAC and service water heating system controls FAHAD FATEHenergy_progress
09/26/2023Maintenance informationFAHAD FATEHenergy_progress
09/26/2023HVAC and service water heating equipment FAHAD FATEHenergy_progress
09/26/2023Shutoff dampersFAHAD FATEHenergy_progress
09/26/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 47.
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00372068-I1Request digital key ↗
09/02/2026B00372068-P1Request digital key ↗
09/02/2026B00372068-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00370133-I1Request digital key ↗
08/14/2026B00370133-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00370093-P1Request digital key ↗
09/02/2026B00370093-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026B00413389-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION13
11/09/2023321592095Open ↗
09/25/2023321592095Open ↗
04/28/2023321592095Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION11
07/08/2022321592095Open ↗
07/08/2022321592095Open ↗
07/08/2022321592095Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/19/2023321592095Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISZONING DIAGRAM3
10/19/2023321592095Open ↗
05/12/2023321592095Open ↗
06/08/2021321592095Open ↗
▸BISPLEASE PROVIDE EASEMENT DOCUMENT FORCOMMON MAT FOUNDATION FOR 2 TAX LOTS1
12/07/2023321592095Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/07/2020321592095Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/08/2021321592095Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
05/12/2023321592095Open ↗
▸BISVERIFY TAX LOT1
07/06/2023321592095Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/08/2021321592095Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/05/2023321592095Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/08/2021321592095Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature9
08/30/2026B00413389-I1Open ↗
08/29/2026B00372068-P1Open ↗
08/29/2026B00372068-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026B00413389-I1Open ↗
08/13/2026B00370093-P1Open ↗
08/13/2026B00372068-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/30/2026B00413389-I1Open ↗
08/29/2026B00372068-P1Open ↗
08/28/2026B00372068-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/30/2021321592095Open ↗
▸Trade Schedules & Equipment4
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
11/07/2023321592095Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/28/2020321592095Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/08/2023321592095Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
11/08/2023321592095Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
06/08/2021321592095Open ↗
08/28/2020321592095Open ↗
▸BISSTREET TREE SIGNOFF1
12/05/2023321592095Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/05/2023321592095Open ↗
12/05/2023321592095Open ↗
03/22/2022321592095Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/30/2021321592095Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/05/2023321592095Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00372068-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/05/2023321592095Open ↗
12/05/2023321592095Open ↗
03/22/2022321592095Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/19/2023321592095Open ↗
11/30/2021321592095Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/31/2022321592095Open ↗
11/30/2021321592095Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
11/26/2021321592095Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
11/26/2021321592095Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/28/2020321592095Open ↗
▸BISSOIL REPORT1
08/28/2020321592095Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/10/2023321592095Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION13
05/12/2023321592095Open ↗
05/12/2023321592095Open ↗
04/14/2022321592095Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
12/01/2022321592095Open ↗
06/03/2021321592095Open ↗
▸Cost, Insurance & Ownership5
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
11/30/2021321592095Open ↗
11/26/2021321592095Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/08/2022321592095Open ↗
11/30/2021321592095Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
11/26/2021321592095Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION14
11/27/2023321592095Open ↗
10/19/2023321592095Open ↗
05/12/2023321592095Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET2
11/04/2020321592095Open ↗
06/19/2020321592095Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM2
06/08/2021321592095Open ↗
10/29/2020321592095Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/08/2021321592095Open ↗