← Back
Two family frame
DOLE STREET
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5175689
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3XZoning
2,595 sfGross Floor Area
2Units
Two family frame · 4,360 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire ProtectionCivil
Floor 210p · 2 filings · 20 docs
Floor 15p · 1 filing · 20 docs
Basement8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELAIR RIDGE DEVELOPMENT CORP.2607/08/2026
BLOCK 7092203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC405/20/2024
A TECH ENGINEERING NYC, PLLC.103/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP203/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor603/21/2026
DUO PLUMBING & HTG CORP.Plumbing407/08/2026
DESIGN PLBG & HTG SVC INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738305/20/2024
Building Lifecycle
All (61)Filed (5)Permit Issued (8)Signed Off (3)Inspection (15)Special Inspection (30)
02/07/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
02/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
06/12/2024
Permit issued — Foundation
S08034050-I1-GC-CX
05/30/2024
Signed off — New Building
10' TOTAL CURB CUTS
S08034050-S1
05/30/2024
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00834763-I1
05/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/21/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/20/2024
Filed — New Building
10' TOTAL CURB CUTS
S08034050-P1
05/14/2024
Signed off — New Building
10' TOTAL CURB CUTS
S08034050-S2
05/14/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/25/2024
Permit issued — Curb Cut
S08034050-S2-CC
03/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
01/05/2024
Filed — New Building
10' TOTAL CURB CUTS
S08034050-S2
10/27/2023
Permit issued — Plumbing
S00834763-I1-PL
10/27/2023
Permit issued — Plumbing
S08034050-S1-PL
10/05/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2023
Permit issued — Plumbing
S00834763-I1-PL
04/12/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/24/2023
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00834763-I1
03/22/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/09/2023
Permit issued — Plumbing
S75000099-S1-PL
02/24/2023
Permit issued — Plumbing
S08034050-S1-PL
01/12/2023
Permit issued — Earth Work
S08034050-I1-GC-CX
12/20/2022
Filed — New Building
10' TOTAL CURB CUTS
S08034050-S1
11/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/04/2022
Filed — New Building
10' TOTAL CURB CUTS
S08034050-I1
11/04/2022
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
11/04/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
anthony santoro
11/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
11/04/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
11/04/2022
Special inspection requirement — Subgrade Inspections
anthony santoro
11/04/2022
Special inspection requirement — Permanent certificate
anthony santoro
11/04/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/04/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
11/04/2022
Special inspection requirement — Interior lighting power
anthony santoro
11/04/2022
Special inspection requirement — Metering
anthony santoro
11/04/2022
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
11/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
11/04/2022
Special inspection requirement — Structural Wood Frame
anthony santoro
11/04/2022
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
11/04/2022
Special inspection requirement — Fenestration areas
anthony santoro
11/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
11/04/2022
Special inspection requirement — Air barrier — testing
anthony santoro
11/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
11/04/2022
Special inspection requirement — Insulation placement and R values
anthony santoro
11/04/2022
Special inspection requirement — Air barrier - visual inspection
anthony santoro
11/04/2022
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
11/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
11/04/2022
Special inspection requirement — Fenestration air leakage
anthony santoro
11/04/2022
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
11/04/2022
Special inspection requirement — Maintenance information
anthony santoro
11/04/2022
Special inspection requirement — Ventilation and air distribution system
anthony santoro
11/03/2022
Special inspection requirement — Final
anthony santoro
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedBEYER CONSTRUCTION06/12/2024
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION04/25/2024
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/27/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/27/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.06/02/2023
DOB NOWPlumbingSigned-offDESIGN PLBG & HTG SVC IN03/09/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.02/24/2023
DOB NOWEarth WorkPermit IssuedBEYER CONSTRUCTION01/12/2023
1 project · most recent 05/20/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2024Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 04/18/2024
General Wiring
FiledStatusContractorScope
04/18/2024CompleteLASER LITE ELECT'L INC.General Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/07/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
02/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
05/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/13/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
03/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/05/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/12/2023Pass-Final PL - UndergroundPassView ↗
03/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
05/14/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
11/04/2022Concrete - Cast-In-Placeanthony santorospecial
11/04/2022Exterior Insulation and Finish Systems (EIFS)anthony santorospecial
11/04/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
11/04/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
11/04/2022Subgrade Inspectionsanthony santorospecial
11/04/2022Permanent certificateanthony santoroenergy_progress
11/04/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/04/2022Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
11/04/2022Interior lighting poweranthony santoroenergy_progress
11/04/2022Meteringanthony santoroenergy_progress
11/04/2022Energy Code Compliance Inspectionsanthony santoroprogress
11/04/2022Fire-Resistance Rated Constructionanthony santoroprogress
11/04/2022Structural Wood Frameanthony santoroprogress
11/04/2022Electric vehicle service equipment requirementsanthony santoroenergy_progress
11/04/2022Fenestration areasanthony santoroenergy_progress
11/04/2022HVAC-R and service water heating equipmentanthony santoroenergy_progress
11/04/2022Air barrier — testing anthony santoroenergy_progress
11/04/2022HVAC-R and service water heating system controlsanthony santoroenergy_progress
11/04/2022Insulation placement and R valuesanthony santoroenergy_progress
11/04/2022Air barrier - visual inspectionanthony santoroenergy_progress
11/04/2022Protection of exposed foundation insulationanthony santoroenergy_progress
11/04/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
11/04/2022Fenestration air leakageanthony santoroenergy_progress
Latest 25 of 31.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00834763-I1Request digital key ↗
08/21/2026S08034050-S2Request digital key ↗
08/21/2026S08034050-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
11/04/2022540234566Open ↗
08/19/2022540234566Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/19/2022540234566Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/19/2022540234566Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S08034050-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08034050-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S08034050-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026S08034050-S1Open ↗
08/27/2026S08034050-P1Open ↗
08/25/2026S08034050-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026S08034050-S1Open ↗
08/13/2026S08034050-P1Open ↗
08/13/2026S00834763-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026S08034050-I1Open ↗
08/25/2026S08034050-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/19/2022540234566Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/19/2022540234566Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S08034050-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08034050-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S08034050-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08034050-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08034050-I1Open ↗
▸Inspections & Test Reports3
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
08/19/2022540234566Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08034050-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S08034050-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
11/04/2022540234566Open ↗
08/19/2022540234566Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
08/19/2022540234566Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/19/2022540234566Open ↗
▸BISADDITIONAL INFORMATION1
10/13/2022540234566Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/19/2022540234566Open ↗
▸BISWAIVER OF LEGAL GRADE1
10/13/2022540234566Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
08/19/2022540234566Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
10/13/2022540234566Open ↗
▸BISWAIVER FOR NO SIDEWALK.1
10/13/2022540234566Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S08034050-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S08034050-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S08034050-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08034050-I1Open ↗