← Back
Two family frame
DOLE STREET
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5175686
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3XZoning
2,595 sfGross Floor Area
2Units
Two family frame · 4,384 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 213p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Basement13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELAIR RIDGE DEVELOPMENT CORP.2507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC405/20/2024
A TECH ENGINEERING NYC, PLLC.103/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP203/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEYER CONSTRUCTION CORPGeneral Contractor603/21/2026
DUO PLUMBING & HTG CORP.Plumbing407/08/2026
LASER LITE ELECT'L INC.Electrical103/22/2026
DESIGN PLBG & HTG SVC INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738305/20/2024
Building Lifecycle
All (56)Filed (5)Permit Issued (8)Signed Off (3)Inspection (10)Special Inspection (30)
06/12/2024
Permit issued — Mechanical Systems
S08034042-I1-GC-CX
05/31/2024
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00834755-I1
05/30/2024
Signed off — New Building
10' TOTAL CURB CUT
S08034042-S1
05/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/21/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/20/2024
Filed — New Building
10' TOTAL CURB CUT
S08034042-P1
05/14/2024
Signed off — New Building
10' TOTAL CURB CUT
S08034042-S2
05/14/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/25/2024
Permit issued — Curb Cut
S08034042-S2-CC
03/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/22/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
01/05/2024
Filed — New Building
10' TOTAL CURB CUT
S08034042-S2
10/27/2023
Permit issued — Plumbing
S08034042-S1-PL
10/27/2023
Permit issued — Plumbing
S00834755-I1-PL
10/05/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2023
Permit issued — Plumbing
S00834755-I1-PL
04/06/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/24/2023
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00834755-I1
03/22/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/09/2023
Permit issued — Plumbing
S78239235-S1-PL
02/24/2023
Permit issued — Plumbing
S08034042-S1-PL
01/12/2023
Permit issued — General Construction
S08034042-I1-GC-CX
12/20/2022
Filed — New Building
10' TOTAL CURB CUT
S08034042-S1
11/04/2022
Filed — New Building
10' TOTAL CURB CUT
S08034042-I1
11/04/2022
Special inspection requirement — Fenestration air leakage
anthony santoro
11/04/2022
Special inspection requirement — Insulation placement and R values
anthony santoro
11/04/2022
Special inspection requirement — Air barrier - visual inspection
anthony santoro
11/04/2022
Special inspection requirement — Interior lighting power
anthony santoro
11/04/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
11/04/2022
Special inspection requirement — Metering
anthony santoro
11/04/2022
Special inspection requirement — Protection of exposed foundation insulation
anthony santoro
11/04/2022
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
11/04/2022
Special inspection requirement — Fenestration areas
anthony santoro
11/04/2022
Special inspection requirement — Ventilation and air distribution system
anthony santoro
11/04/2022
Special inspection requirement — Permanent certificate
anthony santoro
11/04/2022
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
11/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
11/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
11/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
11/04/2022
Special inspection requirement — Air barrier — testing
anthony santoro
11/04/2022
Special inspection requirement — Maintenance information
anthony santoro
11/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
11/03/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
11/03/2022
Special inspection requirement — Subgrade Inspections
anthony santoro
11/03/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/03/2022
Special inspection requirement — Final
anthony santoro
11/03/2022
Special inspection requirement — Footing and Foundation
anthony santoro
11/03/2022
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
11/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
11/03/2022
Special inspection requirement — Structural Wood Frame
anthony santoro
11/03/2022
Special inspection requirement — Mechanical Systems
anthony santoro
11/03/2022
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBEYER CONSTRUCTION06/12/2024
DOB NOWCurb CutSigned-offBEYER CONSTRUCTION04/25/2024
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/27/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.10/27/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.06/05/2023
DOB NOWPlumbingSigned-offDESIGN PLBG & HTG SVC IN03/09/2023
DOB NOWPlumbingSigned-offDUO PLUMBING & HTG CORP.02/24/2023
DOB NOWGeneral ConstructionPermit IssuedBEYER CONSTRUCTION01/12/2023
1 project · most recent 05/20/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/20/2024Signed-offDUO PLUMBING & HTG CORP.Gas, Storm, Water/Sanitary
1 project · most recent 04/18/2024
General Wiring
FiledStatusContractorScope
04/18/2024CompleteLASER LITE ELECT'L INC.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/13/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
03/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/05/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2023Pass-Final PL - UndergroundPassView ↗
03/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
05/14/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
11/04/2022Fenestration air leakageanthony santoroenergy_progress
11/04/2022Insulation placement and R valuesanthony santoroenergy_progress
11/04/2022Air barrier - visual inspectionanthony santoroenergy_progress
11/04/2022Interior lighting poweranthony santoroenergy_progress
11/04/2022Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
11/04/2022Meteringanthony santoroenergy_progress
11/04/2022Protection of exposed foundation insulationanthony santoroenergy_progress
11/04/2022Duct leakage testing, insulation and designanthony santoroenergy_progress
11/04/2022Fenestration areasanthony santoroenergy_progress
11/04/2022Ventilation and air distribution systemanthony santoroenergy_progress
11/04/2022Permanent certificateanthony santoroenergy_progress
11/04/2022Electric vehicle service equipment requirementsanthony santoroenergy_progress
11/04/2022HVAC-R and service water heating equipmentanthony santoroenergy_progress
11/04/2022HVAC-R and service water heating system controlsanthony santoroenergy_progress
11/04/2022HVAC-R and service water piping design and insulationanthony santoroenergy_progress
11/04/2022Air barrier — testing anthony santoroenergy_progress
11/04/2022Maintenance informationanthony santoroenergy_progress
11/03/2022Fire-Resistant Penetrations and Jointsanthony santorospecial
11/03/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
11/03/2022Subgrade Inspectionsanthony santorospecial
11/03/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/03/2022Finalanthony santoroprogress
11/03/2022Footing and Foundationanthony santoroprogress
Latest 25 of 31.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00834755-I1Request digital key ↗
08/21/2026S08034042-P1Request digital key ↗
08/21/2026S08034042-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S08034042-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S08034042-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S08034042-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026S08034042-I1Open ↗
09/01/2026S08034042-I1Open ↗
09/01/2026S08034042-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00834755-I1Open ↗
08/21/2026S08034042-S2Open ↗
08/21/2026S08034042-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S08034042-I1Open ↗
09/01/2026S08034042-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S08034042-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S08034042-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S08034042-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S08034042-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S08034042-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S08034042-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S08034042-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S08034042-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026S08034042-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S08034042-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S08034042-I1Open ↗