Miscellaneous educational facility
Academic Leadership Cs Upper Es
EAST 139TH STREET · BIN 2128872
💬 Discuss this project
2021Year Built
7Stories
W9Building Class
R6Zoning
83,610 sfGross Floor Area
1Units
LL97 Covered1 Open Violation ▸
Miscellaneous educational facility · Owner of record: ACADEMIC LEADERSHIP CHARTER SCHOOL · 12,500 sf lot · 6.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof9p · 7 filings · 20 docs
Bulkhead2p · 1 filing · 8 docs
Floor 74p · 5 filings · 20 docs
Floor 63p · 4 filings · 20 docs
Floor 52p · 4 filings · 20 docs
Floor 43p · 4 filings · 20 docs
Floor 35p · 6 filings · 20 docs
Floor 22p · 6 filings · 20 docs
Floor 15p · 5 filings · 20 docs
Cellar4p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACADEMIC LEADERSHIP CHARTER SCHOOL6207/08/2026
OWNERS REP2907/08/2026
SIGNATURE CONSTRUCTION1303/22/2026
CORE SCAFFOLD SYSTEMS103/22/2026
ALCS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES3803/21/2026
AE DESIGN SOLUTION3203/21/2026
LOUIS STRIAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor2207/08/2026
SIGNATURE CONSTRUCTION GROUPGeneral Contractor807/08/2026
ASHLAR MECHANICAL CORPFire Protection607/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing507/08/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
A.S.K. ELECTRICAL CORPElectrical103/22/2026
ACTIVE SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8431406/10/2024
LEO Y LEE ASSOCIATES2481309/25/2022
AR-TECH ENGINEERING, P.C.6659108/03/2022
Building Lifecycle
All (215)Filed (48)Permit Issued (35)Signed Off (16)Violation (21)Inspection (16)Objection (50)Special Inspection (29)
04/25/2026
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
12/02/2025
Filed — No Work
X00428748-P2
11/26/2025
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2025
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
07/07/2025
Signed off — Alteration
Install two (2) new boiler(s) in conjunction with NB# 210177672
X00414608-I1
01/28/2025
Filed — No Work
X00415019-P1
12/13/2024
Special inspection requirement — Public Assembly Emergency Lighting
JOHN MCMONAGLE
08/29/2024
Signed off — Alteration
Plumbing work in conjunction with NB# 210177672
X00347464-I1
08/20/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/30/2024
Signed off — Alteration
X00414619-I1
07/01/2024
Signed off — Alteration
INSTALL NEW SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NB#210177672
X00414624-I1
06/10/2024
Filed — Alteration
Plumbing work in conjunction with NB# 210177672
X00347464-P7
06/10/2024
Filed — Alteration
INSTALL NEW SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NB#210177672
X00414624-P3
05/30/2024
Violation issued (ECB, closed)
Construction
05/20/2024
Signed off — Alteration
Mechanical work in conjunction with NB #210177672
X00347471-I1
05/20/2024
Signed off — Alteration
Install two (2) new boiler(s) in conjunction with NB# 210177672
X00414608-S1
05/16/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/13/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/08/2024
Signed off — Alteration
X00380873-I1
05/08/2024
Signed off — Alteration
Structural work in conjunction with NB# 210177672
X00414469-I1
04/30/2024
Signed off — Alteration
X00414474-I1
04/29/2024
Filed — Alteration
Mechanical work in conjunction with NB #210177672
X00347471-P3
04/22/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/16/2024
Filed — Alteration
Structural work in conjunction with NB# 210177672
X00414469-P1
04/12/2024
Signed off — Alteration
Installation of temporary air pressurized alarm system for standpipe system. In conjunction with NB#210177672
X00442226-I1
04/11/2024
Special inspection requirement — Structural Steel - Details
JOHN MCMONAGLE
04/11/2024
Special inspection requirement — Structural Steel - High Strength Bolting
JOHN MCMONAGLE
04/11/2024
Special inspection requirement — Masonry
JOHN MCMONAGLE
04/11/2024
Special inspection requirement — Final
JOHN MCMONAGLE
04/11/2024
Special inspection requirement — Structural Steel - Welding
JOHN MCMONAGLE
04/11/2024
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
04/11/2024
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
04/11/2024
Special inspection requirement — Structural Cold-Formed Steel
JOHN MCMONAGLE
04/08/2024
Permit issued — Structural
X00414469-I1-ST
04/04/2024
Filed — Alteration
INSTALL NEW SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NB#210177672
X00414624-P2
04/03/2024
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
04/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/03/2024
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
03/26/2024
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
03/11/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/08/2024
Permit issued — Standpipe
X00414624-I1-EW-SD
02/06/2024
Filed — Alteration
INSTALL NEW SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NB#210177672
X00414624-P1
02/06/2024
Filed — Alteration
Plumbing work in conjunction with NB# 210177672
X00347464-P6
01/26/2024
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - ACADEMIC LEADERSHIP CHARTER SCHOOL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
X00851749-I1
01/22/2024
Special inspection requirement — Final
JOHN MCMONAGLE
01/18/2024
Signed off — Alteration
X00494941-I1
01/18/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00678058-I1
01/18/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00494940-I1
01/18/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00665588-I1
01/18/2024
Objection resolved — Addressed
01/17/2024
Objection resolved — Addressed
01/17/2024
Objection resolved — Addressed
01/17/2024
Objection resolved — Addressed
01/12/2024
Permit issued — Curb Cut
X00380873-I1-CC
12/21/2023
Filed — Alteration
Plumbing work in conjunction with NB# 210177672
X00347464-P5
12/20/2023
Objection raised — Other
12/20/2023
Objection raised — Other
12/20/2023
Objection raised — Admin
Latest 60 of 215 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSIGNATURE CONSTRUCTION GR04/08/2024
DOB NOWStandpipeSigned-offASHLAR MECHANICAL CORP02/08/2024
DOB NOWCurb CutSigned-offSIGNATURE CONSTRUCTION GR01/12/2024
DOB NOWMechanical SystemsSigned-offSIGNATURE CONSTRUCTION GR09/12/2023
DOB NOWMechanical SystemsSigned-offSIGNATURE CONSTRUCTION GR09/12/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/01/2023
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.06/07/2023
DOB NOWSignSigned-offACTIVE SIGNS INC05/03/2023
DOB NOWStandpipeSigned-offASHLAR MECHANICAL CORP04/20/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/24/2023
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC03/24/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/27/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC01/17/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/20/2022
DOB NOWBoiler EquipmentSigned-offOLYMPIAN FUEL OIL CORP09/16/2022
DOB NOWMechanical SystemsSigned-offSIGNATURE CONSTRUCTION GR09/14/2022
DOB NOWMechanical SystemsSigned-offSIGNATURE CONSTRUCTION GR09/14/2022
DOB NOWBoiler EquipmentSigned-offOLYMPIAN FUEL OIL CORP07/06/2022
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP06/15/2022
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP06/15/2022
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.06/03/2022
DOB NOWStandpipeSigned-offASHLAR MECHANICAL CORP05/27/2022
DOB NOWBoiler EquipmentSigned-offOLYMPIAN FUEL OIL CORP05/27/2022
DOB NOWMechanical SystemsSigned-offSIGNATURE CONSTRUCTION GR04/13/2022
DOB NOWMechanical SystemsSigned-offSIGNATURE CONSTRUCTION GR04/01/2022
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC03/30/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/30/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/16/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC01/24/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/01/2021
DOB NOWStandpipeSigned-offASHLAR MECHANICAL CORP07/13/2021
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC03/31/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/30/2021
BIS—ISSUEDSIGNATURE CONSTRUCTION GROUP09/17/2024
BIS—ISSUEDSIGNATURE CONSTRUCTION GROUP10/26/2023
BIS—ISSUEDSIGNATURE CONSTRUCTION GROUP10/26/2023
BIS—ISSUEDSIGNATURE CONSTRUCTION GROUP10/26/2023
BISOTISSUEDSIGNATURE CONSTRUCTION GROUP09/14/2023
+ 10 more permits on file
4 projects · most recent 01/04/2025
General Wiring
FiledStatusContractorScope
01/04/2025CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
08/16/2024CompleteTUXEDO ELEC'L CONTR'G INC—
02/15/2022CompleteV. VASS ELECTRIC CORP—
03/31/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
08/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/16/2024Pass-Final Boiler Equipment InspectionPassView ↗
05/13/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/22/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
03/26/2024Pass-Final SD - Fire PumpPassView ↗
03/11/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/12/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
05/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/22/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/03/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/31/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/28/2022Pass-Final PL - UndergroundPassView ↗
12/16/2021Pass-Final PL - UndergroundPassView ↗
12/04/2021Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/25/2026Public Assembly Emergency LightingJOHN MCMONAGLEprogress
11/26/2025Public Assembly Emergency LightingJOHN MCMONAGLEprogress
07/22/2025Public Assembly Emergency LightingJOHN MCMONAGLEprogress
12/13/2024Public Assembly Emergency LightingJOHN MCMONAGLEprogress
04/11/2024Structural Steel - DetailsJOHN MCMONAGLEspecial
04/11/2024Structural Steel - High Strength BoltingJOHN MCMONAGLEspecial
04/11/2024MasonryJOHN MCMONAGLEspecial
04/11/2024FinalJOHN MCMONAGLEprogress
04/11/2024Structural Steel - WeldingJOHN MCMONAGLEspecial
04/11/2024Post-installed AnchorsJOHN MCMONAGLEspecial
04/11/2024Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
04/11/2024Structural Cold-Formed SteelJOHN MCMONAGLEspecial
04/03/2024Standpipe SystemsJOHN MCMONAGLEspecial
04/03/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/03/2024Sprinkler SystemsJOHN MCMONAGLEspecial
01/22/2024FinalJOHN MCMONAGLEprogress
11/28/2023Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/28/2023Standpipe SystemsJOHN MCMONAGLEspecial
11/28/2023Sprinkler SystemsJOHN MCMONAGLEspecial
11/06/2023FinalJOHN MCMONAGLEprogress
07/25/2023FinalLEON SKVIRSKYprogress
06/28/2023FinalLEON SKVIRSKYprogress
06/02/2023HVAC and service water heating equipment JOHN MCMONAGLEenergy_progress
06/01/2023HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
05/25/2023HVAC and service water heating equipment JOHN MCMONAGLEenergy_progress
Latest 25 of 29.
▾Documents — 352 on file (BIS + DOB NOW)
▸Plans & Drawings52
▸DOB NOWPlans/Sketch19
08/25/2026X00494940-P2Request digital key ↗
08/25/2026X00494940-P4Request digital key ↗
08/25/2026X00494940-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/23/2026X00347464-P6Request digital key ↗
08/23/2026X00347464-P5Request digital key ↗
08/23/2026X00347464-P4Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
08/21/2026X00414624-P2Request digital key ↗
08/21/2026X00414624-P3Request digital key ↗
08/21/2026X00414624-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
08/24/2026X00428748-P2Request digital key ↗
08/20/2026X00415019-I1Request digital key ↗
08/20/2026X00415019-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/25/2026X00414474-I1Request digital key ↗
08/21/2026X00347471-I1Request digital key ↗
08/21/2026X00347471-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
08/25/2026X00414619-I1Request digital key ↗
08/24/2026X00414608-P1Request digital key ↗
08/15/2026X00414608-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/21/2026X00414624-P2Request digital key ↗
08/21/2026X00414624-P3Request digital key ↗
08/21/2026X00414624-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/21/2026X00414469-P1Request digital key ↗
08/14/2026X00414469-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
08/24/2026X00438045-I1Request digital key ↗
08/15/2026X00438045-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/25/2026X00380873-I1Request digital key ↗
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION25
10/20/2025210177672Open ↗
09/06/2024220563913Open ↗
11/08/2023210177672Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION8
10/27/2023210177672Open ↗
10/27/2023210177672Open ↗
10/27/2023210177672Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
03/22/2021210177672Open ↗
12/12/2016220563913Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/24/2021210177672Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
11/16/2020210177672Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/10/2021210177672Open ↗
▸BISVERIFY TAX LOT1
07/23/2024210177672Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/23/2024210177672Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/10/2021210177672Open ↗
▸Seals & Professional Certifications74
▸DOB NOWDPL-1: Design Professional Seal & Signature48
08/25/2026X00380873-I1Open ↗
08/25/2026X00414619-I1Open ↗
08/25/2026X00414474-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026X00414608-I1Open ↗
09/23/2026X00414608-S1Open ↗
09/01/2026X00438045-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026X00414469-P1Open ↗
09/01/2026X00414624-P2Open ↗
09/01/2026X00414624-P2Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
03/18/2021240301972Open ↗
01/22/2021240300027Open ↗
09/29/2020240282653Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/18/2021240301972Open ↗
09/29/2020240282653Open ↗
▸Trade Schedules & Equipment1
▸BISSTANDPIPE ALARM DRAWINGS & AI1 (OR AI1 PROOF)1
07/28/2021210177672Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
03/10/2021210177672Open ↗
12/12/2016220563913Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
03/10/2021210177672Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/21/2021210177672Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/13/2022240282653Open ↗
▸BISSTREET TREE SIGNOFF1
01/30/2025210177672Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
08/05/2022240301972Open ↗
07/27/2022240301972Open ↗
03/18/2021240301972Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
05/15/2024210177672Open ↗
03/21/2024240301972Open ↗
03/21/2024240300027Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
03/21/2024240301972Open ↗
03/21/2024240300027Open ↗
12/05/2023210177672Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
04/04/2024210177672Open ↗
03/21/2024240301972Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00347471-I1Open ↗
08/13/2026X00414608-I1Open ↗
▸BISINTERIOR LIGHTING POWER1
04/04/2024210177672Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/05/2023210177672Open ↗
▸BISFENESTRATION AREAS1
12/05/2023210177672Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
04/04/2024210177672Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00414608-I1Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY14
01/09/2023240300027Open ↗
08/05/2022240301972Open ↗
07/27/2022240301972Open ↗
Showing 3 of 14 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
03/21/2024240301972Open ↗
12/05/2023210177672Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
03/21/2024240301972Open ↗
12/05/2023210177672Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/31/2024210177672Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
09/11/2023210177672Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/21/2024240301972Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/05/2023210177672Open ↗
▸BISMASONRY1
04/04/2024210177672Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
12/05/2023210177672Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/05/2023210177672Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/11/2023210177672Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
03/08/2024210177672Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/11/2023210177672Open ↗
▸BISSOIL REPORT1
03/22/2021210177672Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/08/2021210177672Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/10/2021210177672Open ↗
▸Approvals, Objections & Sign-offs63
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter46
08/25/2026X00380873-I1Open ↗
08/25/2026X00414619-I1Open ↗
08/25/2026X00414474-I1Open ↗
Showing 3 of 46 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
10/20/2025210177672Open ↗
11/08/2023210177672Open ↗
11/02/2023210177672Open ↗
Showing 3 of 11 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
03/10/2021210177672Open ↗
02/24/2021210177672Open ↗
02/24/2021210177672Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/25/2024240301972Open ↗
03/25/2024240300027Open ↗
▸BISFINAL1
03/21/2024240300027Open ↗
▸Cost, Insurance & Ownership9
▸BISPROJECT-SPECIFIC GL INSURANCE5
10/27/2023210177672Open ↗
07/21/2021210177672Open ↗
04/08/2021210177672Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT2
12/30/2022240300027Open ↗
12/30/2022240300027Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/21/2024240300027Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
03/10/2021210177672Open ↗
▸Filing & Intake Forms27
▸BISADDITIONAL INFORMATION18
05/16/2025210177672Open ↗
07/31/2024210177672Open ↗
12/26/2023210177672Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET4
08/24/2020210177672Open ↗
08/24/2020210177672Open ↗
08/24/2020210177672Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/18/2021240301972Open ↗
01/22/2021240300027Open ↗
09/29/2020240282653Open ↗
▸BISBOROUGH INTAKE FORM2
10/27/2023210177672Open ↗
08/24/2020210177672Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/31/2024210177672Open ↗
03/10/2021210177672Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/24/2021210177672Open ↗
▸BISBSA VARIANCE1
06/07/2021210177672Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
12/05/2023210177672Open ↗
▸BISVESTIBULES1
12/05/2023210177672Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/05/2023210177672Open ↗
▸BISPLOT DIAGRAM1
12/12/2016220563913Open ↗