← Back
Five to six families
EAST 222 STREET
BRONX · Eastchester-Edenwald-Baychester · BIN 2130706
💬 Discuss this project
0Year Built
—Stories
C2Building Class
R5Zoning
0 sfGross Floor Area
5Units
0 Open Violations
Five to six families · Owner of record: 3540 TIEMANN LLC · 2,324 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Roof89p · 4 filings · 20 docs
Floor 389p · 4 filings · 20 docs
Floor 286p · 4 filings · 20 docs
Floor 186p · 4 filings · 20 docs
Cellar81p · 4 filings · 20 docs
Site & exterior52p · 3 filings · 20 docs
Filed — no permit issued18p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RND 2223007/08/2026
EVAN CONSTRUCTION803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/20/2021$250K—T.J.C. OPERATIONS, INC. → DNR 222 CORP.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M.S. SAVANI ARCHITECT, PC1301/23/2026
NY BUILDING ASSOCIATES INC110/21/2025
LMW ENGINEERING GROUP LLC505/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCASTLE2603/21/2026
S R SOLAR DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVAN CONSTURCTION CORPGeneral Contractor1307/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAKSHAN MALEK ASSOCIATES3352901/23/2026
NKM ENGINEERING PLLC6244110/21/2025
REGIONAL TESTING CORP.394605/05/2025
Building Lifecycle
All (108)Filed (19)Permit Issued (7)Signed Off (5)Violation (2)Inspection (9)Objection (36)Special Inspection (30)
03/25/2026
Signed off — Alteration
HEREWITH PROPOSE STRUCTURAL WORK FOR A 3 STORY, 5-FAMILY NEW SEMI DETACHED BUILDING.
X00747244-I1
03/25/2026
Signed off — Alteration
HEREWITH TO PROPOSE REINFORCE CONCRETE FOOTING AND FOUNDATION WALL.
X00747067-I1
03/25/2026
Signed off — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED INCONJUNCTION WITH NEW BUILDING, BIS # X00684402.
X00793663-I1
03/25/2026
Signed off — Alteration
HEREWITH TO PROPOSE PLUMBING WORK RELATED TO PROPOSED 3-STORY, 5 FAMILY DWELLING WITH CELLAR.
X00716140-I1
03/25/2026
Signed off — Alteration
HEREWITH TO PROPOSE TEMPORARY 8' HIGH WOOD CONSTRUCTION FENCE. NO CHANGES IN OCCUPANCY, USE, GROUP OR EGRESS UNDER THIS APPLICATION.
X00709507-I1
03/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Interior lighting power
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Ventilation and air distribution system
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Mechanical Systems
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Air barrier — testing
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Protection of exposed foundation insulation
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Maintenance information
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Fenestration air leakage
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Final
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Permanent certificate
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Air barrier - visual inspection
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Insulation placement and R values
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Fenestration areas
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Metering
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MARYAM RAKSHAN
03/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
MARYAM RAKSHAN
02/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/14/2026
Objection resolved — Addressed
02/06/2026
Objection raised — Structural
01/23/2026
Filed — New Building
HEREWITH TO PROPOSE 3 STORY BUILDING WITH 5 FAMILY
X00684402-P3
01/15/2026
Special inspection requirement — Air barrier — testing
MARYAM RAKSHAN
01/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
MARYAM RAKSHAN
01/15/2026
Special inspection requirement — Final
MARYAM RAKSHAN
01/15/2026
Special inspection requirement — Energy Code Compliance Inspections
MARYAM RAKSHAN
01/15/2026
Special inspection requirement — Mechanical Systems
MARYAM RAKSHAN
01/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARYAM RAKSHAN
01/15/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
MARYAM RAKSHAN
11/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/21/2025
Filed — Alteration
X01304573-I1
07/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/25/2025
Permit issued — General Construction
X00684402-I1-GC-CX
06/23/2025
Permit issued — Sprinklers
X00793663-I1-EW-SP
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
06/16/2025
Objection resolved — Addressed
05/13/2025
Objection raised — Scope
05/05/2025
Filed — Alteration
HEREWITH PROPOSE STRUCTURAL WORK FOR A 3 STORY, 5-FAMILY NEW SEMI DETACHED BUILDING.
X00747244-P2
04/24/2025
Objection raised — Scope
04/24/2025
Objection raised — Scope
04/17/2025
Filed — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED INCONJUNCTION WITH NEW BUILDING, BIS # X00684402.
X00793663-P2
04/17/2025
Filed — Alteration
HEREWITH TO PROPOSE PLUMBING WORK RELATED TO PROPOSED 3-STORY, 5 FAMILY DWELLING WITH CELLAR.
X00716140-P2
02/27/2025
Filed — New Building
HEREWITH TO PROPOSE 3 STORY BUILDING WITH 5 FAMILY
X00684402-P2
12/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEVAN CONSTURCTION CORP06/25/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC06/23/2025
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT12/13/2024
DOB NOWMechanical SystemsPermit IssuedEVAN CONSTURCTION CORP07/05/2024
DOB NOWStructuralSigned-offEVAN CONSTURCTION CORP07/03/2024
DOB NOWEarth WorkSigned-offEVAN CONSTURCTION CORP07/03/2024
DOB NOWConstruction FenceSigned-offEVAN CONSTURCTION CORP06/06/2024
1 project · most recent 01/23/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/23/2026Permit IssuedEVAN CONSTURCTION CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
General Electric AZ65H12DBM 11,500 BTU · Heat Pump Outdoor ×30
AZ65H15DBM 14,000 BTU · Heat Pump Outdoor ×25
Mitsubishi Electric MUZ-GS30NA2 30,000 BTU · Heat Pump Outdoor ×5
MXZ-SM36NAMHZ2 36,000 BTU · Heat Pump Outdoor ×3
MXZ-2C20NAHZ3 20,000 BTU · Heat Pump Outdoor ×1
Ventilation
Swegon Gold RX 005 330 CFM · Erv ×5
Zehnder COMFOAIR 350 200 CFM · Erv ×1
MDL#COMFOAIR200 100 CFM · Erv ×1
3 projects · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026Permit IssuedBERGER QUALITY ELEC'L CON—
12/01/2025CompleteAV GROUP ELECTRICAL LLCGeneral Wiring
10/02/2025Permit IssuedAV GROUP ELECTRICAL LLC—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
03/02/2026Permanent certificateMARYAM RAKSHANenergy_progress
03/02/2026Maintenance informationMARYAM RAKSHANenergy_progress
03/02/2026Duct leakage testing, insulation and designMARYAM RAKSHANenergy_progress
03/02/2026Ventilation and air distribution systemMARYAM RAKSHANenergy_progress
03/02/2026HVAC-R and service water heating system controlsMARYAM RAKSHANenergy_progress
03/02/2026HVAC-R and service water piping design and insulationMARYAM RAKSHANenergy_progress
03/02/2026MeteringMARYAM RAKSHANenergy_progress
03/02/2026HVAC-R and service water heating equipmentMARYAM RAKSHANenergy_progress
03/02/2026Fenestration areasMARYAM RAKSHANenergy_progress
03/02/2026Insulation placement and R valuesMARYAM RAKSHANenergy_progress
03/02/2026Interior lighting powerMARYAM RAKSHANenergy_progress
03/02/2026Fire-Resistance Rated ConstructionMARYAM RAKSHANprogress
03/02/2026Protection of exposed foundation insulationMARYAM RAKSHANenergy_progress
03/02/2026Fenestration air leakageMARYAM RAKSHANenergy_progress
03/02/2026Air barrier - visual inspectionMARYAM RAKSHANenergy_progress
03/02/2026Electric vehicle service equipment requirementsMARYAM RAKSHANenergy_progress
03/02/2026Air barrier — testing MARYAM RAKSHANenergy_progress
03/02/2026Fenestration and door U-factor and product ratingsMARYAM RAKSHANenergy_progress
03/02/2026FinalMARYAM RAKSHANprogress
03/02/2026Exterior Insulation and Finish Systems (EIFS)MARYAM RAKSHANspecial
03/02/2026Fire-Resistant Penetrations and JointsMARYAM RAKSHANspecial
03/02/2026Energy Code Compliance InspectionsMARYAM RAKSHANprogress
03/02/2026Mechanical SystemsMARYAM RAKSHANspecial
01/15/2026Fenestration areasMARYAM RAKSHANenergy_progress
01/15/2026Exterior Insulation and Finish Systems (EIFS)MARYAM RAKSHANspecial
Latest 25 of 114.
▾Documents — 208 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/24/2026X00709507-I1Request digital key ↗
08/24/2026X00713487-I1Request digital key ↗
08/24/2026X00747067-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
04/17/2025240317661Open ↗
05/27/2022240317661Open ↗
02/15/2022220745255Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
08/25/2025240317661Open ↗
05/27/2022240317661Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram4
08/17/2026X00684402-I1Open ↗
08/13/2026X00684402-P3Open ↗
08/13/2026X00684402-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 24
08/17/2026X00684402-I1Open ↗
08/13/2026X00684402-P1Open ↗
08/13/2026X00684402-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/17/2026X00684402-I1Open ↗
08/13/2026X00684402-P2Open ↗
08/13/2026X00684402-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 14
08/17/2026X00684402-I1Open ↗
08/13/2026X00684402-P2Open ↗
08/13/2026X00684402-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026X00684402-I1Open ↗
▸Seals & Professional Certifications129
▸DOB NOWProgress Inspector Seal & Signature86
09/01/2026X00747067-I1Open ↗
09/01/2026X00747244-I1Open ↗
09/01/2026X00684402-I1Open ↗
Showing 3 of 86 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/02/2026X00793663-I1Open ↗
09/01/2026X00747067-I1Open ↗
09/01/2026X00747244-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/24/2026X00709507-I1Open ↗
08/24/2026X00713417-I1Open ↗
08/24/2026X00713487-I1Open ↗
Showing 3 of 19 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/27/2022240317661Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/17/2026X00684402-I1Open ↗
08/13/2026X00684402-P2Open ↗
08/13/2026X00684402-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/17/2026X00684402-P2Open ↗
08/17/2026X00684402-I1Open ↗
08/15/2026X00684402-P3Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN2
01/11/2024240317661Open ↗
01/11/2024240317661Open ↗
▸BISSTREET TREE CHECKLIST1
01/11/2024240317661Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026X00684402-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026X00684402-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/17/2026X00684402-I1Open ↗
▸Filing & Intake Forms4
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/27/2022240317661Open ↗
▸BISEFILING COVER SHEET1
02/15/2022220745255Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/27/2022240317661Open ↗
▸BISADDITIONAL INFORMATION1
06/18/2025240317661Open ↗
▸Other Documents20
▸BISBPP - SUPPORTING DOCUMENTATION4
08/25/2025240317661Open ↗
01/11/2024240317661Open ↗
01/11/2024240317661Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/17/2026X00684402-I1Open ↗
08/13/2026X00684402-P3Open ↗
08/13/2026X00684402-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/17/2026X00684402-I1Open ↗
08/13/2026X00684402-P2Open ↗
08/13/2026X00684402-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026X00684402-I1Open ↗
08/17/2026X00684402-P2Open ↗
08/15/2026X00684402-P3Open ↗
Showing 3 of 4 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/27/2022240317661Open ↗
▸DOB NOWFinal Survey1
08/17/2026X00684402-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00747067-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/17/2026X00684402-I1Open ↗