Elevator apt, fireproof without stores
EAST 229TH STREET
BRONX · Eastchester-Edenwald-Baychester · BIN 2094137
💬 Discuss this project
1951Year Built
14Stories
D3Building Class
R5Zoning
1,028,976 sfGross Floor Area
1,019Units
LL97 CoveredRent Stabilized122 Open Violations 110 unresolved · 12 paperwork only ▸
Elevator apt, fireproof without stores · Owner of record: CSA PRESERVATION PARTNERS LLC · 1,003,262 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction7p · 2 filings · 20 docs
BasementUnder Construction3p · 1 filing · 20 docs
Sub-BasementUnder Construction32p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CSA PRESERVATION PARTNERS LLC4907/08/2026
NEW YOURK CITY HOUSING AUTHORITY1407/08/2026
NYCHA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2003/21/2026
A1 EXPEDITING SERVICE403/21/2026
JULIAN A. GOMEZ403/21/2026
AE DESIGN SOLUTION203/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIVER CITY BUILDERS LLCGeneral Contractor1307/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor607/08/2026
ENDRE BANYAElectrical203/21/2026
4 BROTHERS & SONS FENCEGeneral Contractor207/08/2026
ACCORD POWER INCGeneral Contractor207/08/2026
CAPONE ELECL CONTRS CORPElectrical203/22/2026
DOUGLAS HEDBERGElectrical203/21/2026
NIETO CONTRACTORS INCGeneral Contractor107/08/2026
THOMAS KELLYElectrical103/21/2026
STEPHENS, KENNETHElectrical103/21/2026
SNS ORGNIZATION LTDGeneral Contractor104/09/2026
HAY MECHANICAL SOLUTIONSPlumbing106/27/2026
INPRO PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266208/12/2025
TECTONIC ENGINEERING CONS106904/14/2025
SYNERGIC DESIGN LLC8561111/05/2024
DEMERARA ENGINEERING, PLL4248109/01/2023
Building Lifecycle
All (145)Filed (18)Permit Issued (20)Signed Off (2)Violation (60)Inspection (3)Objection (12)Special Inspection (30)
06/27/2026
Violation issued (HPD, open)
C
06/27/2026
Violation issued (HPD, open)
C
06/12/2026
Violation issued (HPD, open)
C
04/30/2026
Signed off — Alteration
Limited Exterior Repairs & Roof Replacement not to include replacement of the entire underlying roof deck or assembly. No change to use, egress or occupancy.
X00883266-I1
04/16/2026
Violation issued (HPD, closed)
C
04/16/2026
Violation issued (HPD, closed)
C
04/16/2026
Violation issued (HPD, closed)
C
04/16/2026
Violation issued (HPD, open)
C
04/16/2026
Violation issued (HPD, open)
C
04/16/2026
Violation issued (HPD, open)
B
04/16/2026
Violation issued (HPD, closed)
B
04/16/2026
Violation issued (HPD, closed)
C
04/16/2026
Violation issued (HPD, closed)
B
04/01/2026
Permit issued — Plumbing
X08053655-S3-PL
03/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/25/2026
Permit issued — Mechanical Systems
X08053655-S4-MS
02/23/2026
Permit issued — Mechanical Systems
X08053655-S4-MS
02/10/2026
Permit issued — General Construction
X08053655-I1-GC
02/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/04/2026
Permit issued — Mechanical Systems
X08053655-S2-MS
01/30/2026
Violation issued (HPD, open)
C
01/30/2026
Violation issued (HPD, closed)
A
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
A
01/30/2026
Violation issued (HPD, closed)
A
01/08/2026
Permit issued — Solar
X01118992-I1-SL
12/30/2025
Permit issued — Plumbing
X08053655-S1-PL
10/12/2025
Violation issued (HPD, closed)
C
10/12/2025
Violation issued (HPD, closed)
B
10/12/2025
Violation issued (HPD, closed)
C
10/12/2025
Violation issued (HPD, closed)
C
10/12/2025
Violation issued (HPD, closed)
C
10/12/2025
Violation issued (HPD, closed)
C
10/12/2025
Violation issued (HPD, closed)
C
10/12/2025
Violation issued (HPD, closed)
A
09/22/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
09/22/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
09/11/2025
Objection resolved — Addressed
08/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
08/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
08/22/2025
Special inspection requirement — Final
John Monroe
08/22/2025
Special inspection requirement — Post-installed Anchors
John Monroe
08/22/2025
Special inspection requirement — Masonry
John Monroe
08/12/2025
Filed — Alteration
Limited Exterior Repairs & Roof Replacement not to include replacement of the entire underlying roof deck or assembly. No change to use, egress or occupancy.
X00883266-P1
07/25/2025
Special inspection requirement — Post-installed Anchors
John Monroe
07/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/25/2025
Special inspection requirement — Final
John Monroe
07/25/2025
Special inspection requirement — Masonry
John Monroe
07/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
05/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
05/01/2025
Objection resolved — Addressed
04/29/2025
Filed — Alteration
INSTALLATION OF NEW INTAKE AND EXHAUST VENT PIPING FOR PROPOSED GAS DOMESTIC HOT WATER HEATERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X08053655-P4
04/24/2025
Objection raised — Scope
04/23/2025
Filed — Alteration
INSTALLATION OF NEW INTAKE AND EXHAUST VENT PIPING FOR PROPOSED GAS DOMESTIC HOT WATER HEATERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X08053655-P5
04/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHAY MECHANICAL SOLUTIONS04/01/2026
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD02/25/2026
DOB NOWMechanical SystemsSigned-offRIVER CITY BUILDERS LLC02/23/2026
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/10/2026
DOB NOWMechanical SystemsSigned-offRIVER CITY BUILDERS LLC02/04/2026
DOB NOWSolarPermit IssuedACCORD POWER INC01/08/2026
DOB NOWPlumbingSigned-offINPRO PLUMBING CORP12/30/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC03/12/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/05/2025
DOB NOWSolarPermit IssuedACCORD POWER INC11/25/2024
DOB NOWConstruction FencePermit Issued4 BROTHERS SONS FENCE10/31/2024
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP10/08/2024
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP10/08/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC05/13/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/01/2024
DOB NOWSupported ScaffoldSigned-offNIETO CONTRACTORS INC11/17/2023
DOB NOWConstruction FencePermit Issued4 BROTHERS SONS FENCE10/26/2023
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP10/13/2023
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP10/12/2023
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC07/12/2023
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/23/2010
BISPLISSUEDNEPTUNE MECHANICAL INC12/11/2009
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY11/30/2009
BISPLISSUEDOLYMPIA MECHANICAL08/18/2004
1 project · most recent 04/29/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/29/2025Signed-offSNS ORGNIZATION LTDVentilation Systems
Ventilation
Greenheck ESD 202 70 CFM · Exhaust Fan ×4
SQ-70-VG 70 CFM · Exhaust Fan ×4
AER-20-03-0610-VG 250 CFM · Exhaust Fan ×2
ESD 635 150 CFM · Exhaust Fan ×2
SQ-90-VG 150 CFM · Exhaust Fan ×2
1 project · most recent 04/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/29/2025Permit IssuedHAY MECHANICAL SOLUTIONSGas, Water/Sanitary
9 projects · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026Permit IssuedY ELECTRIC INC—
11/24/2025Permit IssuedCAPONE ELECL CONTRS CORPGeneral Wiring
11/14/2025CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
11/05/2025CancelledGM-POWER ELECTRIC CORPGeneral Wiring
11/05/2025CancelledGM-POWER ELECTRIC CORPGeneral Wiring
10/27/2025CompleteWIRETECH ELECTRIC CORPGeneral Wiring
10/27/2025CompleteWIRETECH ELECTRIC CORPGeneral Wiring
10/23/2024CompleteACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
10/11/2023Permit IssuedANTHONY G FERRY INC—
1 project · most recent 09/01/2023
FiledStatusContractorScope
09/01/2023——1 scope_items
2 projects · most recent 10/25/2023
Fence Sidewalk Shed
FiledStatusContractorScope
10/25/2023Permit Issued4 BROTHERS & SONS FENCEFence
10/11/2023Permit IssuedROCKLEDGE SCAFFOLD CORPFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
09/22/2025FinalGEORGE GHEBRYALprogress
09/22/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
09/22/2025Mechanical SystemsGEORGE GHEBRYALspecial
09/22/2025Heating SystemsGEORGE GHEBRYALspecial
08/22/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
08/22/2025Structural Stability – Alterations of existing buildingsJohn Monroespecial
08/22/2025FinalJohn Monroeprogress
08/22/2025Post-installed AnchorsJohn Monroespecial
08/22/2025MasonryJohn Monroespecial
07/25/2025Post-installed AnchorsJohn Monroespecial
07/25/2025Tenant Protection Plan Compliance—special
07/25/2025FinalJohn Monroeprogress
07/25/2025MasonryJohn Monroespecial
07/25/2025Structural Stability – Alterations of existing buildingsJohn Monroespecial
05/09/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
04/23/2025Fire-Resistant Penetrations and Joints—special
04/07/2025Tenant Protection Plan Compliance—special
04/01/2025Tenant Protection Plan Compliance—special
02/25/2025FinalGEORGE GHEBRYALprogress
02/25/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
02/25/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
02/25/2025Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
02/25/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
02/25/2025Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
02/25/2025Fenestration areasGEORGE GHEBRYALenergy_progress
Latest 25 of 43.
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/23/2026X00883266-P1Request digital key ↗
08/23/2026X00883266-I1Request digital key ↗
08/22/2026X00925356-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
02/04/2013220001842Open ↗
05/30/2012220001842Open ↗
09/03/2009220001842Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
08/25/2010220001842Open ↗
12/11/2009220001842Open ↗
11/30/2009220001842Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X08053655-P1Open ↗
08/13/2026X08053655-I1Open ↗
08/13/2026X08053655-P3Open ↗
▸Seals & Professional Certifications56
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/23/2026X00883266-I1Open ↗
08/23/2026X00883266-P1Open ↗
08/22/2026X00925356-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026X08053655-S2Open ↗
09/01/2026X00883266-P1Open ↗
08/31/2026X08053655-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026X08053655-S1Open ↗
09/02/2026X08053655-S2Open ↗
09/02/2026X08053655-S2Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
02/04/2013220001842Open ↗
02/04/2013220001842Open ↗
09/12/2012220001842Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/16/2009220001842Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/16/2009220001842Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
05/27/2010220001842Open ↗
05/27/2010220001842Open ↗
▸BISSCHEDULE B - PLUMBING1
04/16/2009220001842Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/20/2026X01118992-I1Open ↗
08/19/2026X08053655-P6Open ↗
08/13/2026X08053655-P5Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS-WORK UNDET 1000 SQ FT (DEP ACP7)1
02/04/2013220001842Open ↗
▸BISASBESTOS INSPECTION REPORT1
04/16/2009220001842Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026X00883266-I1Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/19/2026X08053655-P6Open ↗
08/13/2026X00883266-I1Open ↗
08/13/2026X01118992-I1Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/04/2013220001842Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/16/2009220001842Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/16/2009220001842Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X00883266-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/16/2009220001842Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION2
02/04/2013220001842Open ↗
09/12/2012220001842Open ↗
▸Other Documents16
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026X00883266-I1Open ↗
08/13/2026X08053655-P3Open ↗
08/13/2026X08053655-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProof of Historic Building5
08/13/2026X00883266-P1Open ↗
08/13/2026X08053655-P3Open ↗
08/13/2026X08053655-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026X08053655-P1Open ↗
08/13/2026X08053655-P3Open ↗
08/13/2026X08053655-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026X08053655-P1Open ↗
08/13/2026X08053655-P3Open ↗
08/13/2026X08053655-I1Open ↗