← Back
Elevator apt, fireproof without stores
EAST 229TH STREET
BRONX · Eastchester-Edenwald-Baychester · BIN 2094142
💬 Discuss this project
1951Year Built
14Stories
D3Building Class
R5Zoning
1,028,976 sfGross Floor Area
1,019Units
LL97 CoveredRent Stabilized122 Open Violations 110 unresolved · 12 paperwork only ▸
Elevator apt, fireproof without stores · Owner of record: CSA PRESERVATION PARTNERS LLC · 1,003,262 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
Roof6p · 2 filings · 20 docs
Floor 1Under Construction8p · 1 filing · 20 docs
CellarUnder Construction4p · 2 filings · 20 docs
BasementUnder Construction3p · 1 filing · 20 docs
Sub-BasementUnder Construction8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CSA PRESERVATION PARTNERS LLC5509/22/2026
NEW YORK CITY HOUSING AUTHORITY1006/28/2026
N.Y.C. HOUSING AUTHORITY103/22/2026
NYCHA703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2003/21/2026
A1 EXPEDITING SERVICE403/21/2026
HIERARCH-E203/21/2026
JULIAN A. GOMEZ403/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIVER CITY BUILDERS LLCGeneral Contractor1807/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor507/08/2026
STEPHENS, KENNETHElectrical403/21/2026
4 BROTHERS & SONS FENCEGeneral Contractor307/08/2026
CAPONE ELECL CONTRS CORPElectrical203/22/2026
ACCORD POWER INCGeneral Contractor207/08/2026
THOMAS KELLYElectrical103/21/2026
SNS ORGNIZATION LTDGeneral Contractor104/09/2026
HAY MECHANICAL SOLUTIONSPlumbing106/27/2026
INPRO PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061009/10/2026
RAND ENGINEERING & ARCHIT266208/12/2025
SYNERGIC DESIGN LLC8561111/05/2024
Building Lifecycle
All (87)Filed (18)Permit Issued (22)Signed Off (3)Violation (13)Inspection (1)Special Inspection (30)
09/10/2026
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT BASEMENT LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053588-P6
08/19/2026
Signed off — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT BASEMENT LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053588-I1
08/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/02/2026
Permit issued — Plumbing
X08053588-S4-PL
02/25/2026
Permit issued — Mechanical Systems
X08053588-S5-MS
02/23/2026
Permit issued — Mechanical Systems
X08053588-S5-MS
02/04/2026
Permit issued — Mechanical Systems
X08053588-S2-MS
01/08/2026
Permit issued — Solar
X01118985-I1-SL
01/06/2026
Permit issued — General Construction
X08053588-I1-GC
11/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/05/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, closed)
B
10/22/2025
Permit issued — Plumbing
X08053588-S1-PL
10/16/2025
Violation issued (HPD, closed)
B
10/16/2025
Violation issued (HPD, closed)
C
10/16/2025
Violation issued (HPD, closed)
B
10/08/2025
Signed off — Alteration
Limited Exterior Repairs & Roof Replacement not to include replacement of the entire underlying roof deck or assembly. No change to use, egress or occupancy.
X00882978-I1
09/18/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
09/18/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
09/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
09/18/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
09/11/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT BASEMENT LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053588-P5
08/20/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
08/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/20/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
08/20/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
08/20/2025
Special inspection requirement — Final
John Monroe
08/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
08/20/2025
Special inspection requirement — Masonry
John Monroe
08/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
08/20/2025
Special inspection requirement — Post-installed Anchors
John Monroe
08/12/2025
Filed — Alteration
Limited Exterior Repairs & Roof Replacement not to include replacement of the entire underlying roof deck or assembly. No change to use, egress or occupancy.
X00882978-P1
07/24/2025
Special inspection requirement — Masonry
John Monroe
07/24/2025
Special inspection requirement — Post-installed Anchors
John Monroe
07/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
John Monroe
07/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/24/2025
Special inspection requirement — Final
John Monroe
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
04/30/2025
Permit issued — General Construction
X08053588-I1-GC
04/29/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT BASEMENT LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053588-P3
04/23/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT BASEMENT LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053588-P4
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/17/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT BASEMENT LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053588-S5
02/19/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
02/19/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
02/19/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
02/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
02/10/2025
Permit issued — General Construction
X08053588-I1-GC
02/05/2025
Permit issued — General Construction
X00882978-I1-GC
01/18/2025
Violation issued (HPD, closed)
C
01/18/2025
Violation issued (HPD, closed)
C
01/18/2025
Violation issued (HPD, closed)
A
01/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
12/26/2024
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT BASEMENT LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053588-P2
12/04/2024
Filed — Alteration
REMOVAL AND REPLACEMENT OF THE EXISTING STEAM SUPPLIED HOT WATER GENERATION TO A DIRECT NATURAL GAS FIRED WATER HEATING SYSTEM. ADDITIONAL SUPPLY AND RETURN PIPING AT BASEMENT LEVEL. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS.
X08053588-S4
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHAY MECHANICAL SOLUTIONS04/02/2026
DOB NOWMechanical SystemsSigned-offSNS ORGNIZATION LTD02/25/2026
DOB NOWMechanical SystemsSigned-offRIVER CITY BUILDERS LLC02/23/2026
DOB NOWMechanical SystemsSigned-offRIVER CITY BUILDERS LLC02/04/2026
DOB NOWSolarPermit IssuedACCORD POWER INC01/08/2026
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC01/06/2026
DOB NOWPlumbingSigned-offINPRO PLUMBING CORP10/22/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC04/30/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/10/2025
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/05/2025
DOB NOWSolarPermit IssuedACCORD POWER INC11/25/2024
DOB NOWConstruction FencePermit Issued4 BROTHERS SONS FENCE10/31/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC10/27/2024
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP10/08/2024
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP10/07/2024
DOB NOWSuspended ScaffoldSigned-offC.C.C. RENOVATION INC06/26/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC05/13/2024
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC02/02/2024
DOB NOWConstruction FencePermit Issued4 BROTHERS SONS FENCE10/26/2023
DOB NOWSidewalk ShedPermit IssuedROCKLEDGE SCAFFOLD CORP10/12/2023
DOB NOWConstruction FencePermit IssuedROCKLEDGE SCAFFOLD CORP10/05/2023
DOB NOWGeneral ConstructionSigned-offRIVER CITY BUILDERS LLC07/12/2023
BISPLISSUEDNEPTUNE MECHANICAL INC11/25/2009
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY11/24/2009
BISPLISSUEDOLYMPIA MECHANICAL08/16/2004
1 project · most recent 09/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/10/2026Permit IssuedHAY MECHANICAL SOLUTIONSGas, Water/Sanitary
5 projects · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026Permit IssuedY ELECTRIC INC—
11/26/2025Permit IssuedCAPONE ELECL CONTRS CORPGeneral Wiring
11/14/2025CompleteCAPONE ELECL CONTRS CORPGeneral Wiring
10/23/2024CompleteACCORD POWER ELECTRIC LLC2 meters, 1 new_meters
10/11/2023Permit IssuedANTHONY G FERRY INC—
1 project · most recent 10/04/2023
Fence Sidewalk Shed
FiledStatusContractorScope
10/04/2023Permit IssuedROCKLEDGE SCAFFOLD CORPFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
08/05/2026Tenant Protection Plan Compliance—special
08/05/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/18/2025FinalGEORGE GHEBRYALprogress
09/18/2025Mechanical SystemsGEORGE GHEBRYALspecial
09/18/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
09/18/2025Heating SystemsGEORGE GHEBRYALspecial
08/20/2025FinalGEORGE GHEBRYALprogress
08/20/2025Tenant Protection Plan Compliance—special
08/20/2025Heating SystemsGEORGE GHEBRYALspecial
08/20/2025Mechanical SystemsGEORGE GHEBRYALspecial
08/20/2025FinalJohn Monroeprogress
08/20/2025Structural Stability – Alterations of existing buildingsJohn Monroespecial
08/20/2025MasonryJohn Monroespecial
08/20/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
08/20/2025Post-installed AnchorsJohn Monroespecial
07/24/2025MasonryJohn Monroespecial
07/24/2025Post-installed AnchorsJohn Monroespecial
07/24/2025Structural Stability – Alterations of existing buildingsJohn Monroespecial
07/24/2025Tenant Protection Plan Compliance—special
07/24/2025FinalJohn Monroeprogress
05/06/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
05/06/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
04/22/2025Fire-Resistant Penetrations and Joints—special
04/07/2025Tenant Protection Plan Compliance—special
04/01/2025Tenant Protection Plan Compliance—special
Latest 25 of 55.
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/22/2026X00936761-S1Request digital key ↗
08/22/2026X00936761-I1Request digital key ↗
08/22/2026X00941658-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
06/18/2012220001940Open ↗
05/30/2012220001940Open ↗
09/03/2009220001940Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
08/20/2010220001940Open ↗
11/25/2009220001940Open ↗
11/24/2009220001940Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026X08053588-P1Open ↗
08/20/2026X08053588-P2Open ↗
08/13/2026X08053588-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026X08053588-S5Open ↗
09/21/2026X08053588-I1Open ↗
09/21/2026X08053588-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/22/2026X00936761-I1Open ↗
08/22/2026X00936761-S1Open ↗
08/22/2026X00941658-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/23/2026X08053588-P6Open ↗
09/23/2026X08053588-S5Open ↗
09/21/2026X08053588-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/04/2013220001940Open ↗
02/04/2013220001940Open ↗
09/12/2012220001940Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/16/2009220001940Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/16/2009220001940Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE4
04/29/2010220001940Open ↗
04/26/2010220001940Open ↗
04/19/2010220001940Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
04/16/2009220001940Open ↗
09/12/2008210067452Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/20/2026X08053588-S2Open ↗
08/20/2026X08053588-S1Open ↗
08/20/2026X08053588-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS-WORK UNDET 1000 SQ FT (DEP ACP7)1
02/04/2013220001940Open ↗
▸BISASBESTOS INSPECTION REPORT1
04/16/2009220001940Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/12/2008210067452Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/18/2026X00882978-I1Open ↗
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/20/2026X08053588-S2Open ↗
08/20/2026X08053588-S1Open ↗
08/20/2026X08053588-I1Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/28/2011220001940Open ↗
04/16/2009220001940Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/04/2013220001940Open ↗
07/28/2011220001940Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
04/16/2009220001940Open ↗
09/12/2008210067452Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/18/2026X00882978-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
07/28/2011220001940Open ↗
04/16/2009220001940Open ↗
09/12/2008210067452Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
02/04/2013220001940Open ↗
09/12/2012220001940Open ↗
▸BISEFILING COVER SHEET1
09/12/2008210067452Open ↗
▸Other Documents16
▸DOB NOWProof of Historic Building5
08/20/2026X08053588-P2Open ↗
08/20/2026X08053588-P1Open ↗
08/13/2026X00882978-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/20/2026X08053588-P2Open ↗
08/20/2026X08053588-P1Open ↗
08/13/2026X08053588-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/20/2026X08053588-P2Open ↗
08/20/2026X08053588-P1Open ↗
08/13/2026X08053588-I1Open ↗
▸DOB NOWPlot Diagram3
08/20/2026X08053588-P2Open ↗
08/20/2026X08053588-P1Open ↗
08/13/2026X08053588-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01071977-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01071977-I1Open ↗