← Back
Two family frame
EDGEGROVE AVENUE
STATEN ISLAND · BIN 5175249
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3XZoning
3,014 sfGross Floor Area
2Units
Two family frame · 5,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
Architecture
Floor 219p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Basement19p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NELLO DEVELOPMENT2407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANNA & LOCCISANO ARCHITECTS, PC706/05/2024
A TECH ENGINEERING NYC, PLLC.108/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANNA LOCCISANO ARCHITECTS P C1403/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NELLO HOMES, INCGeneral Contractor407/08/2026
FINE MECHANICAL CORPPlumbing207/08/2026
LASER LITE ELECT'L INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738306/05/2024
Building Lifecycle
All (70)Filed (8)Permit Issued (4)Signed Off (3)Inspection (11)Objection (14)Special Inspection (30)
06/26/2024
Signed off — Alteration
S00594648-I1
06/18/2024
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVE AND METER FOR SAME.
S00922295-I1
06/18/2024
Signed off — Alteration
FILING IS IN CONJUNCTION W/ NB APPLICATION #S00600676
S00595061-I1
06/17/2024
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
06/17/2024
Special inspection requirement — Interior lighting power
anthony santoro
06/17/2024
Special inspection requirement — Metering
anthony santoro
06/17/2024
Special inspection requirement — Mechanical Systems
anthony santoro
06/17/2024
Special inspection requirement — Ventilation and air distribution system
anthony santoro
06/17/2024
Special inspection requirement — Fenestration areas
anthony santoro
06/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
06/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
06/17/2024
Special inspection requirement — Structural Steel - Details
anthony santoro
06/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
06/17/2024
Special inspection requirement — Footing and Foundation
anthony santoro
06/17/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
06/17/2024
Special inspection requirement — Air barrier — testing
anthony santoro
06/17/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
06/17/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
06/17/2024
Special inspection requirement — Structural Steel - Welding
anthony santoro
06/17/2024
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
06/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
06/17/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
06/17/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
06/17/2024
Special inspection requirement — Duct leakage testing, insulation and design
anthony santoro
06/17/2024
Special inspection requirement — Permanent certificate
anthony santoro
06/17/2024
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
06/17/2024
Special inspection requirement — Structural Wood Frame
anthony santoro
06/17/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
06/17/2024
Special inspection requirement — Final
anthony santoro
06/17/2024
Special inspection requirement — Maintenance information
anthony santoro
06/17/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
06/17/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
06/05/2024
Filed — New Building
NEW BUILDING APPLICATION FOR TWO-FAMILY, THREE-STORY DETACHED RESIDENCE W/TWO 8'-6"x18'-0" PARKING PADS (AND A ONE-CAR DETACHED GARAGE FILED UNDER SEPARATE APPLICATION #S00768546).
S00600676-P2
06/03/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
05/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/29/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/07/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/02/2024
Filed — Alteration
FILING IS IN CONJUNCTION W/ NB APPLICATION #S00600676
S00595061-P2
04/18/2024
Filed — Alteration
FILING IS IN CONJUNCTION W/ NB APPLICATION #S00600676
S00595061-P1
04/18/2024
Permit issued — Curb Cut
S00594648-I1-CC
04/12/2024
Filed — New Building
NEW BUILDING APPLICATION FOR TWO-FAMILY, THREE-STORY DETACHED RESIDENCE W/TWO 8'-6"x18'-0" PARKING PADS (AND A ONE-CAR DETACHED GARAGE FILED UNDER SEPARATE APPLICATION #S00768546).
S00600676-P1
02/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/01/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
01/30/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
10/18/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/06/2023
Permit issued — Plumbing
S00922295-I1-PL
08/25/2023
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVE AND METER FOR SAME.
S00922295-I1
08/23/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/06/2023
Permit issued — Plumbing
S00595061-I1-PL
05/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2023
Permit issued — General Construction
S00600676-I1-GC-CX
10/03/2022
Filed — Alteration
FILING IS IN CONJUNCTION W/ NB APPLICATION #S00600676
S00595061-I1
06/30/2022
Objection raised — Structural
06/30/2022
Objection resolved — Addressed
06/02/2022
Objection raised — Zoning
06/02/2022
Objection resolved — Addressed
06/02/2022
Objection raised — Fire_Protection
06/02/2022
Objection resolved — Addressed
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNELLO HOMES, INC04/18/2024
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP09/06/2023
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP06/06/2023
DOB NOWGeneral ConstructionPermit IssuedNELLO HOMES, INC03/10/2023
1 project · most recent 06/05/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/05/2024Permit IssuedNELLO HOMES, INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Comfort Aire A-VMH18SV-1 18,000 BTU · Heat Pump Outdoor ×2
B-VMH18SV-1 18,000 BTU · Heat Pump Outdoor ×2
Rheem RA13NZ48AJ1NA 4 tons · Condensing Unit ×4
Heating
Navien NPE-210S2 180,000 BTU · Water Heater ×4
Rheem R801T1005A21UHSNAS 100,000 BTU · Furnace ×2
R921T1005A21M4SNAS 100,000 BTU · Furnace ×2
Ventilation
Aprilaire 8100 150 CFM · Erv ×2
2 projects · most recent 05/30/2024
General Wiring
FiledStatusContractorScope
05/30/2024CompleteLASER LITE ELECT'L INC.General Wiring
04/17/2023CompleteLASER LITE ELECT'L INC.1 meters, 1 new_meters
1 project · most recent 06/05/2024
Steel Wood
FiledStatusContractorScope
06/05/2024Permit IssuedNELLO HOMES, INCSteel, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/29/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/07/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/01/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
01/30/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/18/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
06/17/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
06/17/2024Interior lighting poweranthony santoroenergy_progress
06/17/2024Electric vehicle service equipment requirementsanthony santoroenergy_progress
06/17/2024Meteringanthony santoroenergy_progress
06/17/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
06/17/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
06/17/2024Fenestration areasanthony santoroenergy_progress
06/17/2024Fenestration air leakageanthony santoroenergy_progress
06/17/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
06/17/2024Air barrier — testing anthony santoroenergy_progress
06/17/2024Air barrier - visual inspectionanthony santoroenergy_progress
06/17/2024Maintenance informationanthony santoroenergy_progress
06/17/2024Ventilation and air distribution systemanthony santoroenergy_progress
06/17/2024Insulation placement and R valuesanthony santoroenergy_progress
06/17/2024Finalanthony santoroprogress
06/17/2024Energy Code Compliance Inspectionsanthony santoroprogress
06/17/2024Footing and Foundationanthony santoroprogress
06/17/2024Structural Wood Frameanthony santoroprogress
06/17/2024Fire-Resistance Rated Constructionanthony santoroprogress
06/17/2024Structural Steel - Weldinganthony santorospecial
06/17/2024Mechanical Systemsanthony santorospecial
06/17/2024HVAC-R and service water heating system controlsanthony santoroenergy_progress
06/17/2024Permanent certificateanthony santoroenergy_progress
06/17/2024Duct leakage testing, insulation and designanthony santoroenergy_progress
06/17/2024Structural Steel - Detailsanthony santorospecial
Latest 25 of 97.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026S00594648-I1Request digital key ↗
08/23/2026S00595061-I1Request digital key ↗
08/23/2026S00595061-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation3
02/23/2022540206043Open ↗
02/16/2022540206043Open ↗
11/12/2021540206043Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/12/2021540206043Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00600676-I1Open ↗
08/13/2026S00600676-P2Open ↗
08/13/2026S00600676-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00600676-I1Open ↗
08/13/2026S00600676-P1Open ↗
08/13/2026S00600676-P2Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
02/16/2022540206043Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00600676-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026S00600676-I1Open ↗
09/01/2026S00600676-I1Open ↗
09/01/2026S00600676-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026S00595061-P1Open ↗
08/23/2026S00595061-I1Open ↗
08/21/2026S00600676-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026S00600676-I1Open ↗
09/01/2026S00600676-I1Open ↗
08/24/2026S00600676-P2Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/12/2021540206043Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/12/2021540206043Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00600676-I1Open ↗
08/13/2026S00600676-P2Open ↗
08/13/2026S00600676-P1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00600676-I1Open ↗
08/13/2026S00600676-P1Open ↗
08/13/2026S00600676-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00600676-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00600676-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00600676-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00600676-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026S00600676-P2Open ↗
08/13/2026S00600676-I1Open ↗
08/13/2026S00600676-P1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/12/2021540206043Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/12/2021540206043Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00600676-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
02/23/2022540206043Open ↗
11/12/2021540206043Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
02/23/2022540206043Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/12/2021540206043Open ↗
▸Other Documents19
▸BISBPP - SUPPORTING DOCUMENTATION4
02/23/2022540206043Open ↗
02/16/2022540206043Open ↗
11/12/2021540206043Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S00600676-I1Open ↗
08/13/2026S00600676-P2Open ↗
08/13/2026S00600676-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00600676-I1Open ↗
08/13/2026S00600676-P1Open ↗
08/13/2026S00600676-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026S00600676-P2Open ↗
08/21/2026S00600676-P1Open ↗
08/15/2026S00600676-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
11/12/2021540206043Open ↗
▸BISWAIVER OF 7? CLEARANCE FOR EXISTINGUTILITY POLE / TREE1
02/23/2022540206043Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
11/12/2021540206043Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
02/16/2022540206043Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00600676-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00600676-I1Open ↗