← Back
Zoned residential, not Manhattan
ENFIELD PLACE
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3-2Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: MADISON 26 LLC · 9,952 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 28p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Basement8p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR107/24/2025
JOSEPH M. MORACE, A.I.A., ARCHITECT604/25/2024
A TECH ENGINEERING NYC, PLLC.103/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FATIMA FALCONETTI EXPEDITOR603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTER BUILT HOMES INCGeneral Contractor1007/08/2026
JB BUZCO PLUMBING LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281107/24/2025
SRA PLANNING & EXPEDITING5677404/25/2024
Building Lifecycle
All (55)Filed (8)Permit Issued (7)Signed Off (4)Inspection (6)Special Inspection (30)
11/21/2025
Signed off — Alteration
S01260848-I1
07/28/2025
Permit issued — Solar
S01260848-I1-SL
07/24/2025
Filed — Alteration
S01260848-I1
07/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
07/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
07/24/2025
Special inspection requirement — Final
Mina Makar
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/24/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
05/08/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Protection of exposed foundation insulation
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Wood – Prefabricated I-Joists
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN ARONE
05/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Final
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Fireplaces
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
05/08/2024
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
04/25/2024
Filed — New Building
PROPOSED DETACHED ONE FAMILY DWELLING WITH BUILT-IN ONE CAR GARAGE AND ACCESSORY OFF STREET PARKING FOR ONE CAR.
S00565318-P3
04/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/04/2024
Signed off — New Building
PROPOSED DETACHED ONE FAMILY DWELLING WITH BUILT-IN ONE CAR GARAGE AND ACCESSORY OFF STREET PARKING FOR ONE CAR.
S00565318-S1
11/08/2023
Signed off — Alteration
Design of wood piles with reinforced concrete combination pile cap/grade beam for a residential house.
S00527693-I1
09/06/2023
Permit issued — Foundation
S00527693-I1-FO
08/18/2023
Filed — New Building
PROPOSED DETACHED ONE FAMILY DWELLING WITH BUILT-IN ONE CAR GARAGE AND ACCESSORY OFF STREET PARKING FOR ONE CAR.
S00565318-P2
08/10/2023
Filed — New Building
PROPOSED DETACHED ONE FAMILY DWELLING WITH BUILT-IN ONE CAR GARAGE AND ACCESSORY OFF STREET PARKING FOR ONE CAR.
S00565318-P1
07/25/2023
Signed off — New Building
PROPOSED DETACHED ONE FAMILY DWELLING WITH BUILT-IN ONE CAR GARAGE AND ACCESSORY OFF STREET PARKING FOR ONE CAR.
S00565318-S2
07/24/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/17/2023
Filed — New Building
PROPOSED DETACHED ONE FAMILY DWELLING WITH BUILT-IN ONE CAR GARAGE AND ACCESSORY OFF STREET PARKING FOR ONE CAR.
S00565318-S2
07/17/2023
Permit issued — Curb Cut
S00565318-S2-CC
07/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/27/2023
Permit issued — Plumbing
S00565318-S1-PL
02/27/2023
Permit issued — General Construction
S00565318-I1-GC-CX
09/22/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/04/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/29/2022
Permit issued — Plumbing
S00565318-S1-PL
04/27/2022
Filed — New Building
PROPOSED DETACHED ONE FAMILY DWELLING WITH BUILT-IN ONE CAR GARAGE AND ACCESSORY OFF STREET PARKING FOR ONE CAR.
S00565318-S1
03/30/2022
Filed — Alteration
Design of wood piles with reinforced concrete combination pile cap/grade beam for a residential house.
S00527693-I1
02/26/2022
Permit issued — Mechanical Systems
S00565318-I1-GC-CX
09/07/2021
Filed — New Building
PROPOSED DETACHED ONE FAMILY DWELLING WITH BUILT-IN ONE CAR GARAGE AND ACCESSORY OFF STREET PARKING FOR ONE CAR.
S00565318-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR07/28/2025
DOB NOWFoundationSigned-offMASTER BUILT HOMES INC09/06/2023
DOB NOWCurb CutSigned-offMASTER BUILT HOMES INC07/17/2023
DOB NOWPlumbingSigned-offJB BUZCO PLUMBING LLC04/27/2023
DOB NOWGeneral ConstructionPermit IssuedMASTER BUILT HOMES INC02/27/2023
DOB NOWPlumbingSigned-offJB BUZCO PLUMBING LLC04/29/2022
DOB NOWMechanical SystemsPermit IssuedMASTER BUILT HOMES INC02/26/2022
2 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteISLAND ELECTRIC CORP—
11/06/2022CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
1 project · most recent 04/25/2024
Concrete Wood
FiledStatusContractorScope
04/25/2024Signed-offMASTER BUILT HOMES INCConcrete, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/24/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/22/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/04/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
07/24/2025Fire-Resistant Penetrations and JointsMina Makarspecial
07/24/2025Air barrier - visual inspectionMina Makarenergy_progress
07/24/2025FinalMina Makarprogress
07/24/2025Energy Code Compliance InspectionsMina Makarprogress
07/24/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
05/08/2024Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
05/08/2024Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
05/08/2024Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
05/08/2024HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
05/08/2024Air barrier — testing WILLIAM MONTAGUEenergy_progress
05/08/2024Interior lighting powerWILLIAM MONTAGUEenergy_progress
05/08/2024HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
05/08/2024Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
05/08/2024Fenestration air leakageWILLIAM MONTAGUEenergy_progress
05/08/2024FireplacesWILLIAM MONTAGUEenergy_progress
05/08/2024Permanent certificateWILLIAM MONTAGUEenergy_progress
05/08/2024Fenestration areasWILLIAM MONTAGUEenergy_progress
05/08/2024Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
05/08/2024Structural Wood FrameWILLIAM MONTAGUEprogress
05/08/2024Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
05/08/2024Footing and FoundationWILLIAM MONTAGUEprogress
05/08/2024Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
05/08/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
05/08/2024Subsurface Investigations (Borings/Test Pits)BRIAN ARONEspecial
05/08/2024Mechanical SystemsWILLIAM MONTAGUEspecial
Latest 25 of 97.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026S00527693-I1Request digital key ↗
08/22/2026S00565318-I1Request digital key ↗
08/22/2026S00565318-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00565318-I1Open ↗
08/13/2026S00565318-P3Open ↗
08/13/2026S00565318-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00565318-P3Open ↗
08/13/2026S00565318-I1Open ↗
08/13/2026S00565318-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00565318-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026S01260848-I1Open ↗
09/01/2026S01260848-I1Open ↗
09/01/2026S00527693-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026S01260848-I1Open ↗
09/01/2026S00527693-I1Open ↗
09/01/2026S00527693-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026S00527693-I1Open ↗
08/22/2026S00565318-P3Open ↗
08/22/2026S00565318-P2Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00565318-P3Open ↗
08/13/2026S00565318-I1Open ↗
08/13/2026S00565318-P2Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/22/2026S00565318-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/22/2026S00565318-P3Open ↗
08/22/2026S00565318-P2Open ↗
08/22/2026S00565318-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00565318-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00565318-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00565318-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00565318-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026S00565318-I1Open ↗
08/13/2026S00565318-P2Open ↗
08/13/2026S00565318-P3Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026S00527693-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00565318-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00565318-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01260848-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial3
08/13/2026S00565318-I1Open ↗
08/13/2026S00565318-P3Open ↗
08/13/2026S00565318-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00565318-P3Open ↗
08/13/2026S00565318-P2Open ↗
08/13/2026S00565318-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00565318-I1Open ↗