Elevator apt, fireproof with stores
FOSTER AVENUE
BROOKLYN · BIN 3429486
💬 Discuss this project
2023Year Built
7Stories
D6Building Class
R7AZoning
54,278 sfGross Floor Area
56Units
Rent Stabilized2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 1341-1351 FLATBUSH LLC · 9,998 sf lot · 5.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingLandscapeGeneral
Roof13p · 2 filings · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
311 JEFFERSON STREETLLC4107/08/2026
OWNER'S REP1303/22/2026
1341-1351 FLATBUSH LLC403/22/2026
PARK MANAGEMENT USA403/22/2026
1341-51 FLATBUSH AVE103/22/2026
311 JEFFERSON203/21/2026
CBO1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S. WIEDER ARCHITECT P.C.2405/23/2025
TECHNEMOTION DESIGN205/13/2024
FL&M ENGINEERING DESIGN &INSPECTION308/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING4803/21/2026
GREEN STUDIO603/21/2026
HIGHRISE GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARK MANAGEMENT USA CORPGeneral Contractor1807/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor903/21/2026
ALL PRO PLBG & HTG INCPlumbing307/08/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56162205/23/2025
Building Lifecycle
All (155)Filed (29)Permit Issued (17)Signed Off (12)Violation (15)Inspection (18)Objection (34)Special Inspection (30)
05/26/2026
Violation issued (ECB, open)
Elevators
05/20/2026
Violation issued (HPD, closed)
C
02/11/2026
Violation issued (HPD, open)
B
10/20/2025
Violation issued (HPD, closed)
B
10/20/2025
Violation issued (HPD, closed)
C
05/29/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/29/2025
Special inspection requirement — Air barrier continuity plan testing
FAHAD FATEH
05/29/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
05/29/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/29/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/29/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
05/29/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/29/2025
Special inspection requirement — Metering
FAHAD FATEH
05/29/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
05/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/29/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/29/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
05/29/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/29/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
05/29/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/29/2025
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
05/23/2025
Filed — New Building
Plumbing Fixtures and Related Piping filed in conjunction with NB B00529604.
B00529604-A9
05/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/23/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
05/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/23/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/23/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/23/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
05/23/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
05/23/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
05/23/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
02/06/2025
Violation issued (HPD, closed)
C
11/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/24/2024
Signed off — Alteration
Interior renovation to the commercial space on the first floor.
B01049645-S1
09/16/2024
Signed off — Alteration
Interior renovation to the commercial space on the first floor.
B01049645-I1
09/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2024
Permit issued — Plumbing
B01049645-S1-PL
07/22/2024
Permit issued — General Construction
B01049645-I1-GC
07/09/2024
Objection resolved — Addressed
07/08/2024
Objection resolved — Addressed
07/08/2024
Objection resolved — Addressed
07/08/2024
Objection resolved — Addressed
07/05/2024
Objection raised — Accessibility
07/03/2024
Objection raised — Other
07/03/2024
Objection resolved — Addressed
06/27/2024
Objection raised — Other
06/27/2024
Objection resolved — Addressed
06/19/2024
Objection resolved — Addressed
06/19/2024
Objection resolved — Addressed
06/19/2024
Objection resolved — Addressed
06/19/2024
Objection resolved — Addressed
06/19/2024
Objection resolved — Addressed
06/19/2024
Objection resolved — Addressed
06/19/2024
Objection resolved — Addressed
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC07/25/2024
DOB NOWGeneral ConstructionSigned-offPARK MANAGEMENT USA CORP07/22/2024
DOB NOWCurb CutSigned-offPARK MANAGEMENT USA CORP11/21/2023
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP07/26/2023
DOB NOWProtection and Mechanical MethodsSigned-offMANHATTAN D ENTERPRISES06/29/2023
DOB NOWStructuralSigned-offPARK MANAGEMENT USA CORP05/11/2023
DOB NOWMechanical SystemsSigned-offPARK MANAGEMENT USA CORP04/27/2023
DOB NOWGeneral ConstructionPermit IssuedPARK MANAGEMENT USA CORP04/27/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES04/27/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES04/27/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN03/02/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC03/02/2023
DOB NOWStandpipeSigned-offA M B MECHANICAL INC03/02/2023
DOB NOWConstruction FenceSigned-offPARK MANAGEMENT USA CORP12/07/2022
DOB NOWFoundationSigned-offPARK MANAGEMENT USA CORP11/25/2022
DOB NOWSupport of ExcavationSigned-offPARK MANAGEMENT USA CORP11/22/2022
DOB NOWFoundationSigned-offPARK MANAGEMENT USA CORP05/24/2022
BISPLISSUEDORION PLUMBING & HTG CORP11/01/2011
BISPLISSUEDORION PLUMBING & HTG CORP09/07/2011
BISPLISSUEDORION PLUMBING & HTG CORP09/07/2011
BISPLISSUEDORION PLUMBING & HTG CORP09/07/2011
BISPLISSUEDORION PLUMBING & HTG CORP09/07/2011
BISPLISSUEDORION PLUMBING & HTG CORP09/02/2011
BISPLISSUEDORION PLUMBING & HTG CORP09/02/2011
BISFPISSUEDMASTER FIRE SYSTEMS, INC09/17/2007
1 project · most recent 05/23/2025
Sprinkler System
FiledStatusContractorScope
05/23/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 05/23/2025
Storm Water/Sanitary
FiledStatusContractorScope
05/23/2025Signed-offPRIME PIPING & HEATING INStorm, Water/Sanitary
4 projects · most recent 02/16/2024
General Wiring
FiledStatusContractorScope
02/16/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
07/31/2023CompletePOWER DIRECT ELECTRIC INC—
04/24/2023CompleteSOLAS ELECTRICAL CORP—
02/27/2023CompletePOWER DIRECT ELECTRIC INC—
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
11/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/08/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
01/19/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
01/17/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/05/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/03/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/03/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/28/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/05/2023Pass-Final PL - UndergroundPassView ↗
03/21/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/29/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/29/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
05/29/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/29/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/29/2025Interior lighting powerFAHAD FATEHenergy_progress
05/29/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/29/2025Maintenance informationFAHAD FATEHenergy_progress
05/29/2025Fenestration areasFAHAD FATEHenergy_progress
05/29/2025Electrical motors and elevatorsFAHAD FATEHenergy_progress
05/29/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/29/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/29/2025Lighting controlsFAHAD FATEHenergy_progress
05/29/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/29/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
05/29/2025MeteringFAHAD FATEHenergy_progress
05/29/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
05/29/2025Air barrier continuity plan testingFAHAD FATEHenergy_progress
05/29/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
05/29/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
05/29/2025Fenestration air leakageFAHAD FATEHenergy_progress
05/29/2025Exterior lighting powerFAHAD FATEHenergy_progress
05/23/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/23/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
05/23/2025Maintenance informationFAHAD FATEHenergy_progress
05/23/2025Ventilation and air distribution systemFAHAD FATEHenergy_progress
Latest 25 of 150.
▾Documents — 303 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
08/27/2026B00861905-P1Request digital key ↗
08/27/2026B00861905-I1Request digital key ↗
08/27/2026B00529604-A9Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION22
01/25/2024320341493Open ↗
01/25/2024320341000Open ↗
01/25/2024320338130Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION10
11/07/2011320338728Open ↗
09/28/2011320338149Open ↗
09/28/2011320340993Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
10/26/2021340821365Open ↗
▸Zoning, Tax Lot & Property Records26
▸DOB NOWRestrictive Declaration/Easement 19
08/13/2026B00529604-A4Open ↗
08/13/2026B00529604-A8Open ↗
08/13/2026B00529604-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026B00529604-A8Open ↗
08/13/2026B00529604-P1Open ↗
08/13/2026B00529604-A7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026B00529604-A9Open ↗
08/13/2026B00529604-I1Open ↗
08/13/2026B00529604-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/15/2022321601049Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/15/2022321601049Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
11/15/2022321601049Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/15/2022321601049Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00529604-I1Open ↗
▸Seals & Professional Certifications88
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/27/2026B00861905-I1Open ↗
08/27/2026B00529604-A8Open ↗
08/27/2026B00529604-S3Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/24/2026B00529604-A7Open ↗
09/24/2026B00529604-A7Open ↗
09/02/2026B00529604-A3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/29/2026B00529604-P4Open ↗
09/24/2026B00529604-A7Open ↗
09/24/2026B00529604-A7Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
07/29/2011320338728Open ↗
07/28/2011320341493Open ↗
07/27/2011320338130Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/29/2011320338728Open ↗
07/27/2011320338130Open ↗
07/27/2011320340993Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
07/29/2011320338728Open ↗
07/27/2011320338149Open ↗
07/27/2011320338130Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/26/2021340821365Open ↗
▸Trade Schedules & Equipment35
▸BISSELF-CERT PLUMBING NOTICE16
01/09/2012320338719Open ↗
01/09/2012320338130Open ↗
12/20/2011320341000Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING13
12/07/2011320341000Open ↗
12/07/2011320338728Open ↗
12/07/2011320338130Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026B00529604-A7Open ↗
08/13/2026B00529604-A8Open ↗
08/13/2026B00529604-A9Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection16
▸BISSTREET TREE CHECKLIST6
10/26/2021340821365Open ↗
07/29/2011320338728Open ↗
07/27/2011320338149Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Tree Checklist6
08/27/2026B00529604-A7Open ↗
08/27/2026B00529604-A4Open ↗
08/27/2026B00529604-I1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
10/26/2021340821365Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00529604-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00529604-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00529604-I1Open ↗
▸Environmental & Asbestos7
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
07/29/2011320338728Open ↗
07/28/2011320341493Open ↗
07/27/2011320338149Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY5
07/29/2011320338728Open ↗
07/27/2011320338149Open ↗
07/27/2011320338130Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00529604-I1Open ↗
08/13/2026B00529604-S2Open ↗
08/13/2026B00529604-S1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00529604-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026B00529604-P3Open ↗
08/13/2026B00529604-P8Open ↗
08/13/2026B00529604-S5Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/17/2021340821365Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00529604-S5Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00529604-S5Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS7
07/29/2011320338728Open ↗
07/28/2011320341493Open ↗
07/27/2011320338130Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT7
07/29/2011320338728Open ↗
07/27/2011320338149Open ↗
07/27/2011320338130Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00529604-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00529604-I1Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET6
07/29/2011320338728Open ↗
07/28/2011320341493Open ↗
07/27/2011320338149Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
11/17/2021340821365Open ↗
12/09/2011320341493Open ↗
12/09/2011320341000Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/26/2021340821365Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/17/2021340821365Open ↗
▸Other Documents25
▸DOB NOWSite Survey: Initial6
08/13/2026B00529604-A7Open ↗
08/13/2026B00529604-I1Open ↗
08/13/2026B00529604-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026B00529604-I1Open ↗
08/13/2026B00529604-A8Open ↗
08/13/2026B00529604-A7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSURVEY: INITIAL6
08/13/2026B00529604-A4Open ↗
08/13/2026B00529604-P1Open ↗
08/13/2026B00529604-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00529604-S5Open ↗
08/13/2026B00529604-S6Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/26/2021340821365Open ↗
▸BISBPP: SIDEWALK & ROADWAY THICKNESS CORES1
01/29/2024340821365Open ↗
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
01/18/2008310014953Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00529604-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00529604-I1Open ↗