Zoned residential, not Manhattan
GERVIL STREET
STATEN ISLAND · BIN 5175452
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R3XZoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: MASON MCGUIRE LLC · 4,180 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH M. MORACE, A.I.A., ARCHITECT103/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BLUE STAR HOLDING203/21/2026
Building Lifecycle
All (32)Filed (1)Objection (1)Special Inspection (30)
04/20/2022
Objection raised — Scope
03/29/2022
Filed — New Building
PROPOSED DETACHED TWO FAMILY RESIDENCE WITH AND ACCESSORY DETACHED ONE CAR GARAGE AND ACCESSORY OPEN PARKING FOR TWO CARS.
S00702820-I1
03/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
03/24/2022
Special inspection requirement — Wood – Prefabricated I-Joists
03/24/2022
Special inspection requirement — Concrete - Cast-In-Place
03/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/24/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
03/24/2022
Special inspection requirement — Subgrade Inspections
03/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
03/24/2022
Special inspection requirement — Ventilation and air distribution system
03/24/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/24/2022
Special inspection requirement — Electric vehicle service equipment requirements
03/24/2022
Special inspection requirement — Air barrier — testing
03/24/2022
Special inspection requirement — Interior lighting power
03/24/2022
Special inspection requirement — Air barrier - visual inspection
03/24/2022
Special inspection requirement — Air barrier continuity plan testing
03/24/2022
Special inspection requirement — Fenestration air leakage
03/24/2022
Special inspection requirement — Energy Code Compliance Inspections
03/24/2022
Special inspection requirement — Fire-Resistance Rated Construction
03/24/2022
Special inspection requirement — Structural Wood Frame
03/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
03/24/2022
Special inspection requirement — Duct leakage testing, insulation and design
03/24/2022
Special inspection requirement — Lighting in dwelling units
03/24/2022
Special inspection requirement — Fenestration areas
03/24/2022
Special inspection requirement — Insulation placement and R values
03/24/2022
Special inspection requirement — Maintenance information
03/24/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
03/24/2022
Special inspection requirement — Permanent certificate
03/24/2022
Special inspection requirement — Protection of exposed foundation insulation
03/21/2022
Special inspection requirement — Mechanical Systems
03/21/2022
Special inspection requirement — Footing and Foundation
03/21/2022
Special inspection requirement — Final
Nothing on file for this building.
1 project · most recent 12/03/2025
General Wiring
FiledStatusContractorScope
12/03/2025CancelledD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 03/29/2022
Concrete Wood
FiledStatusContractorScope
03/29/2022——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
03/24/2022HVAC-R and service water piping design and insulation—energy_progress
03/24/2022Wood – Prefabricated I-Joists—special
03/24/2022Concrete - Cast-In-Place—special
03/24/2022Fire-Resistant Penetrations and Joints—special
03/24/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/24/2022Subgrade Inspections—special
03/24/2022HVAC-R and service water heating system controls—energy_progress
03/24/2022Ventilation and air distribution system—energy_progress
03/24/2022Subsurface Investigations (Borings/Test Pits)—special
03/24/2022Electric vehicle service equipment requirements—energy_progress
03/24/2022Air barrier — testing —energy_progress
03/24/2022Interior lighting power—energy_progress
03/24/2022Air barrier - visual inspection—energy_progress
03/24/2022Air barrier continuity plan testing—energy_progress
03/24/2022Fenestration air leakage—energy_progress
03/24/2022Energy Code Compliance Inspections—progress
03/24/2022Fire-Resistance Rated Construction—progress
03/24/2022Structural Wood Frame—progress
03/24/2022HVAC-R and service water heating equipment—energy_progress
03/24/2022Duct leakage testing, insulation and design—energy_progress
03/24/2022Lighting in dwelling units—energy_progress
03/24/2022Fenestration areas—energy_progress
03/24/2022Insulation placement and R values—energy_progress
03/24/2022Maintenance information—energy_progress
03/24/2022Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 30.
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026S00702820-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00702820-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00702820-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S00702820-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00702820-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S00702820-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026S00702820-I1Open ↗
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00702820-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S00702820-I1Open ↗