← Back
Zoned residential, not Manhattan
GLASSBORO AVENUE
QUEENS · South Jamaica · BIN 4614871
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R4Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · 3,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 2Under Construction7p · 1 filing · 20 docs
Floor 1Under Construction7p · 1 filing · 20 docs
CellarUnder Construction7p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT708/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABG CONSTRUCTION NY INCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642208/07/2026
Building Lifecycle
All (60)Filed (7)Permit Issued (3)Objection (20)Special Inspection (30)
08/07/2026
Filed — New Building
Prososed (2) story + cellar and attic, two-family house with one open parking space in the driveway as per drawings herewith filed.
Q01150593-P1
07/23/2026
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Ventilation and air distribution system
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Metering
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Duct leakage testing, insulation and design
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Masonry
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Structural Cold-Formed Steel
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Structural Steel - Details
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Final
Syed Naqvi
07/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Electric vehicle service equipment requirements
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Footing and Foundation
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Air barrier — testing
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
07/23/2026
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
06/02/2026
Permit issued — Structural
Q01150593-I1-GC-CX
06/02/2026
Permit issued — General Construction
Q01150593-I1-FO-EA
05/19/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND SPRINKLER SYSTEM AND THEIR RELATED PIPING AS PER DRAWINGS.
Q01150598-S1
05/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
02/03/2026
Permit issued — Construction Fence
Q01154083-I1-FN
01/23/2026
Objection raised — Scope
01/06/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND SPRINKLER SYSTEM AND THEIR RELATED PIPING AS PER DRAWINGS.
Q01150598-P1
01/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/01/2026
Objection resolved — Addressed
08/29/2025
Objection resolved — Addressed
08/29/2025
Objection resolved — Addressed
08/29/2025
Objection resolved — Addressed
04/03/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
01/13/2025
Objection resolved — Addressed
01/09/2025
Objection raised — Zoning
01/09/2025
Objection raised — Zoning
01/09/2025
Objection raised — Inspections
01/09/2025
Objection raised — Fire_Protection
01/09/2025
Objection raised — Zoning
01/09/2025
Objection raised — Energy
01/09/2025
Objection raised — Fire_Protection
01/09/2025
Objection raised — Scope
01/02/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND SPRINKLER SYSTEM AND THEIR RELATED PIPING AS PER DRAWINGS.
Q01150598-I1
12/27/2024
Filed — New Building
Prososed (2) story + cellar and attic, two-family house with one open parking space in the driveway as per drawings herewith filed.
Q01150593-I1
12/27/2024
Objection raised — Other
12/27/2024
Objection raised — Other
12/27/2024
Objection raised — Other
12/14/2024
Filed — Alteration
Q01150601-I1
12/14/2024
Filed — Alteration
Install temporary fence on property line as per drawings.
Q01154083-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedABG CONSTRUCTION NY INC06/02/2026
DOB NOWGeneral ConstructionPermit IssuedABG CONSTRUCTION NY INC06/02/2026
DOB NOWConstruction FencePermit IssuedABG CONSTRUCTION NY02/03/2026
1 project · most recent 08/07/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026Permit IssuedABG CONSTRUCTION NY INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Carrier 24VNA924B*030* 36,000 BTU · Condensing Unit ×4
Goodman MBVC1601AA-1 4 tons · Furnace ×4
Heating
A.O. Smith UPVA 18K Electric Heater ×6
Ventilation
Greenheck SP-C50-QD 50 CFM · Exhaust Fan ×8
SP-B90 100 CFM · Exhaust Fan ×4
1 project · most recent 05/19/2026
FiledStatusContractorScope
05/19/2026——46 heads
1 project · most recent 05/19/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
05/19/2026——Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 08/07/2026
Steel Wood
FiledStatusContractorScope
08/07/2026Permit IssuedABG CONSTRUCTION NY INCSteel, Wood
1 project · most recent 12/14/2024
Fence
FiledStatusContractorScope
12/14/2024Permit IssuedABG CONSTRUCTION NY INCFence
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
07/23/2026Maintenance informationMUZAFFAR JAMALenergy_progress
07/23/2026Ventilation and air distribution systemMUZAFFAR JAMALenergy_progress
07/23/2026Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
07/23/2026Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
07/23/2026Fenestration areasMUZAFFAR JAMALenergy_progress
07/23/2026Duct leakage testing, insulation and designMUZAFFAR JAMALenergy_progress
07/23/2026MeteringMUZAFFAR JAMALenergy_progress
07/23/2026Concrete - Cast-In-PlaceMUZAFFAR JAMALspecial
07/23/2026Excavations - Sheeting, Shoring, and BracingMUZAFFAR JAMALspecial
07/23/2026Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
07/23/2026MasonryMUZAFFAR JAMALspecial
07/23/2026Mechanical SystemsMUZAFFAR JAMALspecial
07/23/2026Structural Cold-Formed SteelMUZAFFAR JAMALspecial
07/23/2026Structural Steel - DetailsMUZAFFAR JAMALspecial
07/23/2026Subgrade InspectionsMUZAFFAR JAMALspecial
07/23/2026FinalSyed Naqviprogress
07/23/2026HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
07/23/2026Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
07/23/2026Electric vehicle service equipment requirementsMUZAFFAR JAMALenergy_progress
07/23/2026HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
07/23/2026Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
07/23/2026Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
07/23/2026Footing and FoundationMUZAFFAR JAMALprogress
07/23/2026Permanent certificateMUZAFFAR JAMALenergy_progress
07/23/2026Interior lighting powerMUZAFFAR JAMALenergy_progress
Latest 25 of 71.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026Q01150601-I1Request digital key ↗
08/21/2026Q01154083-I1Request digital key ↗
08/21/2026Q01150593-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/07/2025440821773Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/07/2025440821773Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 22
08/21/2026Q01150593-P1Open ↗
08/13/2026Q01150593-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/21/2026Q01150593-P1Open ↗
08/13/2026Q01150593-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026Q01150593-P1Open ↗
08/13/2026Q01150593-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01150593-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026Q01150593-P1Open ↗
08/21/2026Q01150593-I1Open ↗
08/16/2026Q01150598-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q01150593-P1Open ↗
09/01/2026Q01150593-P1Open ↗
09/01/2026Q01150593-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01150593-P1Open ↗
08/27/2026Q01150593-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/07/2025440821773Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/07/2025440821773Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/21/2026Q01150593-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/21/2026Q01150593-P1Open ↗
08/13/2026Q01150593-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/21/2026Q01150593-I1Open ↗
08/13/2026Q01150593-I1Open ↗
▸BISSTREET TREE CHECKLIST1
03/07/2025440821773Open ↗
▸Inspections & Test Reports2
▸BISCONCRETE - CAST-IN-PLACE1
03/07/2025440821773Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01150593-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
03/07/2025440821773Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/07/2025440821773Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION2
03/07/2025440821773Open ↗
03/07/2025440821773Open ↗
▸DOB NOWSite Survey: Initial2
08/21/2026Q01150593-P1Open ↗
08/13/2026Q01150593-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01150593-P1Open ↗
08/21/2026Q01150593-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026Q01150593-P1Open ↗
08/13/2026Q01150593-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/21/2026Q01150593-I1Open ↗