ECB10/18/2024A 2 STORY, DETACHED,WOOD FRAME BUILDING IS IN DISREPAIR. ROOF OPEN, WINDOWS OUT AND SEALED IN PLACES., REPAIR AND/REPLACENothing owed — awaiting certificate of correction
ECB10/19/2017OPERATION OF A PLACE OF ASSEMBLY WITHOUT A CURRENT CERTIFICATE OF OPERATION. NOTED: AT TIME OF INSPECTION CHAIRS & TABLES ARRANGED FOR OCCUPANCY FOR MORE THAN 100 PEOPLE (APPROX). DOB RECORDS INDICATE THERE WASNothing owed — awaiting certificate of correction
ECB10/19/2017WORK WITHOUT A PERMIT. WORK NOTED: ON THE EXTERIOR OF THE ADMINISTRATION BUILDING, ALONG EXPOSURE #2 INSTALLED FULL HEIGHT PARTITIONS, ENTRYDOORS CREATING (2) 2PC BATHROOMS WITH TOILETS & SINKS. IN ADDITION, INNothing owed — awaiting certificate of correction
ECB10/19/2017WORK WITHOUT A PERMIT PLUMBING. WORK NOTED: AT THE TIME OF INSPECTION I OBSERVED THE NEW INSTALLATION OF DRAIN, WASTE, VENT AND WATER LINES (COPPER) FOR TWO 2PC BATHROOMS; LOCATED AT STREET LEVEL EXPOSURE #2 RENothing owed — awaiting certificate of correction
ECB10/19/2017ELECTRICAL WORK WITHOUT A PERMIT. WORK NOTED: (1)ALONG THE SIDE LINE STEEL CONTAINERS WERE PLACED WITHOUT APPROVED GROUNDING. THE INTERIOR OF THE CONTAINERS WERE WIRED FOR POWER, LIGHTING & SWITCHING. THE MATERNothing owed — awaiting certificate of correction
ECB10/19/2017WORK WITHOUT A PERMIT PLUMBING. WORK NOTED: AT THE TIME OF INSPECTION I OBSERVED THE REMOVAL OF GAS PIPING AT SECOND FLOOR KITCHEN AREA. APPROXIMATELY 15' OF BLACK STEEL GAS PIPING. NO PERMITS WERE FILED FOR THNothing owed — awaiting certificate of correction
ECB10/19/2017OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENT RECORDS. NOTED: ALONG THE SIDE LINE, STEEL SHIPPING CONTAINERS ARE BEING USED AS HABITABLE SPACE, ARRANGED AS LOCKER ROONothing owed — awaiting certificate of correction
Zoned commercial or Manhattan residential · 3,088,850 sf lot · 0 FAR built · Flood zone X