← Back
Condo, residential unit in 1-3 story building
HAMMOCK LANE
STATEN ISLAND · Arden Heights-Rossville · BIN 5121655
💬 Discuss this project
1974Year Built
2Stories
R3Building Class
R3-2Zoning
66,252 sfGross Floor Area
36Units
0 Open ViolationsFDNY Report ↗
Condo, residential unit in 1-3 story building · 66,922 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC204/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272204/27/2026
Building Lifecycle
All (14)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (10)
05/21/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01355099-I1
04/27/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01355099-P1
04/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/27/2026
Special inspection requirement — Final
Walid Abdulla
04/27/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/14/2026
Special inspection requirement — Final
Walid Abdulla
04/14/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
02/26/2026
Permit issued — Solar
S01355099-I1-SL
02/17/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01355099-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/26/2026
1 project · most recent 02/06/2026
FiledStatusContractorScope
02/06/2026CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/27/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/27/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/27/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/27/2026FinalWalid Abdullaprogress
04/27/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/14/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/14/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/14/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/14/2026FinalWalid Abdullaprogress
04/14/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026S01355099-P1Request digital key ↗
08/16/2026S01355099-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026S01355099-P1Open ↗
08/26/2026S01355099-P1Open ↗
08/26/2026S01355099-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026S01355099-P1Open ↗
08/26/2026S01355099-P1Open ↗
08/26/2026S01355099-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026S01355099-P1Open ↗
08/13/2026S01355099-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026S01355099-P1Open ↗
08/13/2026S01355099-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026S01355099-I1Open ↗