← Back
Zoned residential, not Manhattan
HARWAY AVENUE
BROOKLYN · BIN 3430167
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R5Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: 26 HARWAY MANAGEMENT LLC · 3,280 sf lot · 0 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 4Under Construction17p · 1 filing · 20 docs
Floor 3Under Construction17p · 1 filing · 20 docs
Floor 2Under Construction18p · 1 filing · 20 docs
Floor 1Under Construction16p · 1 filing · 20 docs
1 job · most recent 08/16/2026
Sprinkler System
FiledStatusContractorScope
08/16/2026——Sprinkler System
1 job · most recent 08/16/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/16/2026Permit IssuedJOHN FITZGERALD PLBG &HTGStorm, Water/Sanitary
1 job · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedK.N.C ELECTRIC INC—
1 job · most recent 08/16/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/16/2026Permit IssuedJOHN FITZGERALD PLBG &HTGSteel, Concrete, Masonry
2 jobs · most recent 08/16/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/16/2026Permit IssuedJOHN FITZGERALD PLBG &HTGSidewalk Shed
08/22/2025Permit IssuedWINWAY DEVELOPMENT LLCFence
Building Lifecycle
All (79)Filed (7)Permit Issued (7)Objection (44)Special Inspection (21)
09/22/2026
Permit issued — Plumbing
B01207648-S7-PL
08/17/2026
Permit issued — Sidewalk Shed
B01207648-S9-SH
08/17/2026
Permit issued — Construction Fence
B01276503-I1-FN
08/16/2026
Filed — New Building
THE DRAWING HEREIN ARE RELATED A NEW 4-STORY BUILDING WITHOUT CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
B01207648-S9
01/28/2026
Permit issued — Structural
B01207648-S4-ST
01/28/2026
Permit issued — Foundation
B01207648-S6-FO
12/26/2025
Permit issued — General Construction
B01207648-I1-GC
09/05/2025
Objection resolved — Addressed
09/05/2025
Objection resolved — Addressed
09/05/2025
Objection resolved — Addressed
09/05/2025
Objection resolved — Addressed
08/26/2025
Filed — New Building
THE DRAWING HEREIN ARE RELATED A NEW 4-STORY BUILDING WITHOUT CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
B01207648-S8
08/26/2025
Filed — New Building
THE DRAWING HEREIN ARE RELATED A NEW 4-STORY BUILDING WITHOUT CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
B01207648-S7
08/25/2025
Permit issued — Construction Fence
B01276503-I1-FN
08/25/2025
Objection resolved — Addressed
08/22/2025
Filed — Alteration
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:B01207648-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01276503-I1
08/21/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JIAN DENG
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/13/2025
Special inspection requirement — Sprinkler Systems
JIAN DENG
08/12/2025
Objection raised — Structural
08/12/2025
Objection raised — Structural
08/12/2025
Objection raised — Inspections
08/12/2025
Objection raised — Other
08/12/2025
Objection raised — Admin
08/12/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
08/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
08/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
08/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
08/12/2025
Special inspection requirement — Maintenance information
JIAN DENG
08/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
08/11/2025
Filed — New Building
THE DRAWING HEREIN ARE RELATED A NEW 4-STORY BUILDING WITHOUT CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
B01207648-S4
07/30/2025
Filed — New Building
THE DRAWING HEREIN ARE RELATED A NEW 4-STORY BUILDING WITHOUT CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
B01207648-S6
07/29/2025
Special inspection requirement — Structural Steel - Welding
JIAN DENG
07/29/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/29/2025
Special inspection requirement — Masonry
JIAN DENG
07/29/2025
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
07/29/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JIAN DENG
07/29/2025
Special inspection requirement — Subgrade Inspections
JIAN DENG
07/29/2025
Special inspection requirement — Final
JIAN DENG
07/29/2025
Special inspection requirement — Footing and Foundation
JIAN DENG
07/29/2025
Special inspection requirement — Structural Steel - Details
JIAN DENG
07/29/2025
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
07/29/2025
Special inspection requirement — Structural Steel - High Strength Bolting
JIAN DENG
07/18/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/02/2025
Objection raised — Other
06/25/2025
Objection resolved — Addressed
06/25/2025
Objection resolved — Addressed
06/25/2025
Objection resolved — Addressed
06/25/2025
Special inspection requirement — Final
JIAN DENG
06/24/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
05/30/2025
Objection resolved — Addressed
05/29/2025
Objection raised — Other
05/29/2025
Objection raised — Zoning
05/29/2025
Objection raised — Other
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
Latest 60 of 79 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BITOPI CONSULTANTS LLC108/16/2026
YANG ENGINEERING LLC408/26/2025
JIAN ENGINEERING PLLC208/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor408/18/2026
ACER CONSTRUCTION INCGeneral Contractor307/08/2026
SAFECO GROUP CORPGeneral Contractor108/18/2026
JOHN FITZGERALD PLBG &HTGPlumbing109/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397508/26/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG09/22/2026
DOB NOWSidewalk ShedPermit IssuedSAFECO GROUP CORP08/17/2026
DOB NOWConstruction FencePermit IssuedWINWAY DEVELOPMENT LLC08/17/2026
DOB NOWStructuralPermit IssuedACER CONSTRUCTION INC01/28/2026
DOB NOWFoundationPermit IssuedACER CONSTRUCTION INC01/28/2026
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC12/26/2025
DOB NOWConstruction FencePermit IssuedWINWAY DEVELOPMENT LLC08/25/2025
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/21/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJIAN DENGspecial
08/13/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
08/13/2025Sprinkler SystemsJIAN DENGspecial
08/12/2025Energy Code Compliance InspectionsJIAN DENGprogress
08/12/2025HVAC-R and service water heating system controlsJIAN DENGenergy_progress
08/12/2025HVAC-R and service water heating equipmentJIAN DENGenergy_progress
08/12/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
08/12/2025Maintenance informationJIAN DENGenergy_progress
08/12/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
07/29/2025Structural Steel - WeldingJIAN DENGspecial
07/29/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/29/2025MasonryJIAN DENGspecial
07/29/2025Concrete - Cast-In-PlaceJIAN DENGspecial
07/29/2025Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
07/29/2025Subgrade InspectionsJIAN DENGspecial
07/29/2025FinalJIAN DENGprogress
07/29/2025Footing and FoundationJIAN DENGprogress
07/29/2025Structural Steel - DetailsJIAN DENGspecial
07/29/2025Concrete - Cast-In-PlaceJIAN DENGspecial
07/29/2025Structural Steel - High Strength BoltingJIAN DENGspecial
06/25/2025FinalJIAN DENGprogress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01276503-I1Contact architect ↗
08/20/2026B01207648-S4Contact architect ↗
08/20/2026B01207648-S9Contact architect ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01207648-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01207648-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01276503-I1Open ↗
08/20/2026B01207648-S4Open ↗
08/20/2026B01207648-S6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B01207648-S4Open ↗
08/31/2026B01207648-S7Open ↗
08/27/2026B01207648-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B01207648-S4Open ↗
08/31/2026B01207648-S7Open ↗
08/31/2026B01207648-S7Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01207648-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01207648-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/15/2026B01207648-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01207648-S6Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01207648-S6Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/15/2026B01207648-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01207648-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01207648-I1Open ↗