← Back
Two family brick
HAWTREE STREET
QUEENS · BIN 4623572
💬 Discuss this project
2022Year Built
2Stories
B1Building Class
R3XZoning
2,473 sfGross Floor Area
2Units
Two family brick · Owner of record: R&Y FOREVER INC. · 3,610 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 7 docs
Floor 316p · 1 filing · 20 docs
Floor 244p · 1 filing · 20 docs
Floor 146p · 1 filing · 20 docs
Cellar47p · 1 filing · 20 docs
1 job · most recent 07/18/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/18/2024Signed-offEMPIRE RESTORATION & CONTAir Conditioning Systems, Ventilation Systems
Cooling
Rheem RA1324AJ1NA 2 tons · Condensing Unit ×2
Ventilation
Greenheck Sp-B80 75 CFM · Exhaust Fan ×12
SP-A190 150 CFM · Kitchen Exhaust ×4
1 job · most recent 07/18/2024
Storm Water/Sanitary
FiledStatusContractorScope
07/18/2024Signed-offFLAVIO MECHANICAL CORPStorm, Water/Sanitary
3 jobs · most recent 10/01/2025
General Wiring
FiledStatusContractorScope
10/01/2025Permit IssuedSUNRUN SOLAR ELECTL CORP—
09/09/2024CompleteAYYUB ELECTRIC CORPGeneral Wiring
08/07/2024CancelledAYYUB ELECTRIC CORPGeneral Wiring
1 job · most recent 07/18/2024
Steel Concrete Wood
FiledStatusContractorScope
07/18/2024Signed-offFLAVIO MECHANICAL CORPSteel, Concrete, Wood
1 job · most recent 07/18/2024
Fence
FiledStatusContractorScope
07/18/2024Signed-offFLAVIO MECHANICAL CORPFence
Building Lifecycle
All (74)Filed (8)Permit Issued (10)Signed Off (3)Inspection (7)Objection (16)Special Inspection (30)
10/10/2025
Permit issued — Solar
Q01295481-I1-SL
10/01/2025
Filed — Alteration
Q01295481-I1
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/30/2025
Special inspection requirement — Final
Walid Abdulla
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/30/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/25/2024
Signed off — New Building
temporary construction fence filed in conjunction with NB application Q00477882
Q00477882-S1
10/25/2024
Signed off — New Building
temporary construction fence filed in conjunction with NB application Q00477882
Q00477882-S3
10/25/2024
Signed off — New Building
temporary construction fence filed in conjunction with NB application Q00477882
Q00477882-S2
10/08/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/11/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/06/2024
Permit issued — Plumbing
Q00477882-S1-PL
08/05/2024
Permit issued — Construction Fence
Q00477882-S3-FN
07/30/2024
Objection resolved — Addressed
07/29/2024
Objection raised — Other
07/18/2024
Filed — New Building
temporary construction fence filed in conjunction with NB application Q00477882
Q00477882-P3
07/12/2024
Special inspection requirement — Structural Steel - Details
DOYUN KIM
07/12/2024
Special inspection requirement — Structural Cold-Formed Steel
DOYUN KIM
07/12/2024
Special inspection requirement — Masonry
DOYUN KIM
07/12/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
DOYUN KIM
07/12/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ROBERT DYKSTRA
07/12/2024
Special inspection requirement — Wood – Prefabricated I-Joists
Malcolm Barkan
07/12/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
07/12/2024
Special inspection requirement — Final
DOYUN KIM
07/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
07/12/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DOYUN KIM
07/12/2024
Special inspection requirement — Electric vehicle service equipment requirements
DOYUN KIM
07/12/2024
Special inspection requirement — Metering
DOYUN KIM
07/12/2024
Special inspection requirement — Subgrade Inspections
DOYUN KIM
07/12/2024
Special inspection requirement — Ventilation and air distribution system
DOYUN KIM
07/12/2024
Special inspection requirement — Fenestration areas
DOYUN KIM
07/12/2024
Special inspection requirement — Shutoff dampers
DOYUN KIM
07/12/2024
Special inspection requirement — Permanent certificate
DOYUN KIM
07/12/2024
Special inspection requirement — Interior lighting power
DOYUN KIM
07/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
DOYUN KIM
07/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
DOYUN KIM
07/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DOYUN KIM
07/12/2024
Special inspection requirement — Fenestration air leakage
DOYUN KIM
07/12/2024
Special inspection requirement — Protection of exposed foundation insulation
DOYUN KIM
07/12/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DOYUN KIM
07/12/2024
Special inspection requirement — Structural Wood Frame
DOYUN KIM
06/27/2024
Permit issued — Foundation
Q00477882-I1-GC-CX
03/31/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/28/2023
Permit issued — Curb Cut
Q00477882-S2-CC
03/23/2023
Permit issued — Plumbing
Q00477882-S1-PL
12/22/2022
Objection resolved — Addressed
12/20/2022
Objection resolved — Addressed
12/13/2022
Objection resolved — Addressed
12/13/2022
Objection resolved — Addressed
12/13/2022
Objection resolved — Addressed
11/16/2022
Objection raised — Other
11/16/2022
Objection raised — Other
11/16/2022
Objection raised — Other
11/16/2022
Objection raised — Other
11/04/2022
Objection raised — Other
Latest 60 of 74 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAMALI ORGANIZATION1007/08/2026
MSNP MANAGEMENT1307/08/2026
10501 LIBERTY203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/25/2025$1.4M—105-01 LIBERTY CORP. → R&Y FOREVER INC.$556/sf building
08/14/2024$900K—MARVEK DEVELOPMENT LLC → 105-01 LIBERTY CORP.$364/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MSNP MANAGEMENT INCGeneral Contractor1503/21/2026
EMPIRE RESTORATION & CONTGeneral Contractor407/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272110/01/2025
DOYUN KIM; RA7415207/18/2024
MARKANICS CORP4600207/18/2024
IP CONCRETE TESTING AND I6252106/10/2021
WORLD DESIGN ARCHITECTURE9323106/10/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC10/10/2025
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP08/06/2024
DOB NOWConstruction FenceSigned-offEMPIRE RESTORATION & CONT08/05/2024
DOB NOWFoundationPermit IssuedEMPIRE RESTORATION & CONT06/27/2024
DOB NOWCurb CutSigned-offMSNP MANAGEMENT INC03/28/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC03/23/2023
DOB NOWConstruction FenceSigned-offMSNP MANAGEMENT INC01/14/2022
DOB NOWGeneral ConstructionPermit IssuedMSNP MANAGEMENT INC01/14/2022
DOB NOWConstruction FenceSigned-offMSNP MANAGEMENT INC12/15/2021
DOB NOWMechanical SystemsPermit IssuedMSNP MANAGEMENT INC12/07/2021
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/08/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/11/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
09/30/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/30/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/30/2025Energy Code Compliance InspectionsWalid Abdullaprogress
09/30/2025FinalWalid Abdullaprogress
09/30/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
07/12/2024Wood – Prefabricated I-JoistsMalcolm Barkanspecial
07/12/2024Energy Code Compliance InspectionsDOYUN KIMprogress
07/12/2024FinalDOYUN KIMprogress
07/12/2024Fire-Resistance Rated ConstructionDOYUN KIMprogress
07/12/2024Footing and FoundationDOYUN KIMprogress
07/12/2024Structural Wood FrameDOYUN KIMprogress
07/12/2024MeteringDOYUN KIMenergy_progress
07/12/2024Electric vehicle service equipment requirementsDOYUN KIMenergy_progress
07/12/2024Ventilation and air distribution systemDOYUN KIMenergy_progress
07/12/2024Fenestration areasDOYUN KIMenergy_progress
07/12/2024Shutoff dampersDOYUN KIMenergy_progress
07/12/2024Permanent certificateDOYUN KIMenergy_progress
07/12/2024Interior lighting powerDOYUN KIMenergy_progress
07/12/2024HVAC-R and service water heating equipmentDOYUN KIMenergy_progress
07/12/2024HVAC-R and service water heating system controlsDOYUN KIMenergy_progress
07/12/2024HVAC-R and service water piping design and insulationDOYUN KIMenergy_progress
07/12/2024Fenestration air leakageDOYUN KIMenergy_progress
07/12/2024Protection of exposed foundation insulationDOYUN KIMenergy_progress
07/12/2024Fenestration and door U-factor and product ratingsDOYUN KIMenergy_progress
07/12/2024Concrete - Cast-In-PlaceDOYUN KIMspecial
Latest 25 of 77.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026Q00477882-I1Request digital key ↗
08/22/2026Q00477882-S3Request digital key ↗
08/22/2026Q00477882-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00477882-I1Open ↗
08/13/2026Q00477882-P3Open ↗
08/13/2026Q00477882-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00477882-P1Open ↗
08/13/2026Q00477882-P3Open ↗
08/13/2026Q00477882-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00477882-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026Q01295481-I1Open ↗
08/13/2026Q00477882-S2Open ↗
08/13/2026Q00477882-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026Q00477882-P1Open ↗
08/31/2026Q00477882-P1Open ↗
08/31/2026Q00477882-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/31/2026Q00477882-P1Open ↗
08/31/2026Q00477882-P1Open ↗
08/27/2026Q00477882-P3Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00477882-P1Open ↗
08/13/2026Q00477882-I1Open ↗
08/13/2026Q00477882-P3Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/22/2026Q00477882-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00477882-P3Open ↗
08/13/2026Q00477882-P1Open ↗
08/13/2026Q00477882-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00477882-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00477882-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00477882-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00477882-I1Open ↗
08/13/2026Q00477882-S1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q00477882-P1Open ↗
08/13/2026Q00477882-I1Open ↗
08/13/2026Q00477882-P3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00477882-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00477882-I1Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00477882-P1Open ↗
08/13/2026Q00477882-P3Open ↗
08/13/2026Q00477882-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00477882-I1Open ↗
08/13/2026Q00477882-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00477882-I1Open ↗