← Back
Two family frame
HILLMEYER AVENUE
QUEENS · BIN 4623329
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R4-1Zoning
2,142 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.86 FAR built · Flood zone AE
Locations of Work
MechanicalFire Protection
Floor 31p · 1 filing · 8 docs
Floor 21p · 1 filing · 3 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED DEVELOPERS2007/08/2026
ARVERNE BAY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/23/2024$845K—ARVERNE BAY LLC → Private party$395/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROYAL T E203/21/2026
PIROOZ ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAIETEUR CONSTRUCTION INC.General Contractor507/08/2026
SKY ELECTRIC LLCElectrical103/22/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252304/26/2023
PIROOZ ENGINEERING P.C7177404/26/2023
Building Lifecycle
All (49)Filed (6)Permit Issued (5)Signed Off (4)Inspection (6)Objection (22)Special Inspection (6)
10/10/2023
Signed off — Alteration
Installation of sprinkler system (with less than 30 heads) and also plumbing fixtures and plumbing piping for new 2-family building. Filed in conjunction with New Building #440644091.
Q00563375-I1
08/02/2023
Signed off — Alteration
Application filed for mechanical work type in conjunction with new building job # 440644091
Q00693345-I1
08/01/2023
Signed off — Alteration
proposed 8'-0" curb cut
Q00451019-I1
07/31/2023
Signed off — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB JOB #440644091
Q00637997-I1
06/26/2023
Permit issued — Mechanical Systems
Q00693345-I1-MS
06/20/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/26/2023
Filed — Alteration
Installation of sprinkler system (with less than 30 heads) and also plumbing fixtures and plumbing piping for new 2-family building. Filed in conjunction with New Building #440644091.
Q00563375-P2
04/24/2023
Permit issued — Curb Cut
Q00451019-I1-CC
03/07/2023
Permit issued — Construction Fence
Q00637997-I1-FN
11/02/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/22/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/22/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/08/2022
Permit issued — Plumbing
Q00563375-I1-PL
06/07/2022
Filed — Alteration
Installation of sprinkler system (with less than 30 heads) and also plumbing fixtures and plumbing piping for new 2-family building. Filed in conjunction with New Building #440644091.
Q00563375-P1
06/06/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
06/06/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
06/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
06/06/2022
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
06/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
06/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
05/26/2022
Permit issued — Construction Fence
Q00637997-I1-FN
04/19/2022
Objection raised — Scope
04/19/2022
Objection resolved — Addressed
04/19/2022
Objection raised — Scope
04/19/2022
Objection resolved — Addressed
04/12/2022
Filed — Alteration
Application filed for mechanical work type in conjunction with new building job # 440644091
Q00693345-I1
12/08/2021
Objection raised — Scope
12/08/2021
Objection resolved — Addressed
12/08/2021
Objection raised — Inspections
12/08/2021
Objection resolved — Addressed
12/08/2021
Objection raised — Structural
12/08/2021
Objection resolved — Addressed
12/07/2021
Filed — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NB JOB #440644091
Q00637997-I1
07/26/2021
Filed — Alteration
Installation of sprinkler system (with less than 30 heads) and also plumbing fixtures and plumbing piping for new 2-family building. Filed in conjunction with New Building #440644091.
Q00563375-I1
01/25/2021
Objection raised — Scope
01/25/2021
Objection resolved — Addressed
01/25/2021
Objection raised — Inspections
01/25/2021
Objection resolved — Addressed
01/25/2021
Objection raised — Scope
01/25/2021
Objection resolved — Addressed
01/25/2021
Objection raised — Other
01/25/2021
Objection resolved — Addressed
01/25/2021
Objection raised — Scope
01/25/2021
Objection resolved — Addressed
01/25/2021
Objection raised — Structural
01/25/2021
Objection resolved — Addressed
01/21/2021
Filed — Alteration
proposed 8'-0" curb cut
Q00451019-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKAIETEUR CONSTRUCTION INC06/26/2023
DOB NOWCurb CutSigned-offKAIETEUR CONSTRUCTION INC04/24/2023
DOB NOWConstruction FenceSigned-offKAIETEUR CONSTRUCTION INC03/07/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR07/08/2022
DOB NOWConstruction FenceSigned-offKAIETEUR CONSTRUCTION INC05/26/2022
BIS—ISSUEDJ&J DESIGNS INC08/30/2022
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.08/04/2022
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.08/04/2022
1 project · most recent 06/17/2023
General Wiring
FiledStatusContractorScope
06/17/2023CompleteSKY ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/20/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/02/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/22/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/06/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
06/06/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
06/06/2022HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
06/06/2022Maintenance informationPIROOZ SOLTANIZADEHenergy_progress
06/06/2022HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
06/06/2022HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/26/2026Q00563375-I1Request digital key ↗
08/26/2026Q00563375-P2Request digital key ↗
08/26/2026Q00563375-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
08/14/2026Q00451019-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00637997-I1Open ↗
08/26/2026Q00563375-I1Open ↗
08/26/2026Q00563375-P2Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00563375-I1Open ↗
▸Other Documents2
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)2
08/13/2026Q00563375-I1Open ↗
08/13/2026Q00693345-I1Open ↗