HILLSIDE AVENUE
QUEENS · BIN 4620745
💬 Discuss this project
2020Year Built
2Stories
A1Building Class
R2Zoning
1,912 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,800 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/05/2023$1.3M—HOLLIS LLC → Private party$692/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT704/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1203/21/2026
KC EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIDUCCIA ROBERTGeneral Contractor103/21/2026
TRI CITY MECHANICAL GROUPGeneral Contractor103/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT36421104/06/2023
BRIAN E. FLYNN, PE, PC2837404/06/2023
Building Lifecycle
All (41)Filed (7)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (28)
04/20/2023
Signed off — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q00336562-I1
04/13/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN FLYNN
04/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
04/13/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
04/13/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
04/13/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
04/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
04/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
04/06/2023
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q00336562-P7
04/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
04/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
04/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
04/06/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
04/06/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
04/06/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN FLYNN
04/06/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
03/30/2023
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q00336562-P6
03/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
03/08/2023
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q00336562-P5
03/08/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
03/08/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
BRIAN FLYNN
03/01/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
02/21/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
02/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
02/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
01/21/2023
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q00336562-P4
01/16/2023
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q00336562-P3
10/20/2022
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q00336562-P1
01/12/2022
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
01/12/2022
Special inspection requirement — HVAC and service water heating equipment
MUZAFFAR JAMAL
01/12/2022
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
01/12/2022
Special inspection requirement — HVAC insulation and sealing
MUZAFFAR JAMAL
01/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
01/12/2022
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
01/12/2022
Special inspection requirement — HVAC and service water heating system controls
MUZAFFAR JAMAL
03/11/2021
Permit issued — Plumbing
Q00336562-I1-PL
03/31/2020
Objection raised — Other
03/31/2020
Objection resolved — Addressed
03/31/2020
Objection raised — Other
03/31/2020
Objection resolved — Addressed
03/24/2020
Filed — Alteration
APPLICATION FILLING TO INSTALL NEW PLUMBING FIXTURE AS PER DRAWINGS.
Q00336562-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP03/11/2021
BIS—ISSUEDKDK CONSTRUCTION CORP02/18/2021
BIS—ISSUEDKDK CONSTRUCTION CORP08/19/2020
BIS—ISSUEDKDK CONSTRUCTION CORP08/05/2020
1 project · most recent 07/01/2020
General Wiring
FiledStatusContractorScope
07/01/2020CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/13/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN FLYNNspecial
04/13/2023Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
04/13/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
04/13/2023Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
04/13/2023Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
04/13/2023Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
04/13/2023HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
04/06/2023Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
04/06/2023HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
04/06/2023Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
04/06/2023Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
04/06/2023Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
04/06/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN FLYNNspecial
04/06/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
03/15/2023HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
03/08/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
03/08/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesBRIAN FLYNNspecial
03/01/2023Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
02/21/2023Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
02/21/2023Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
02/21/2023Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
01/12/2022Maintenance informationMUZAFFAR JAMALenergy_progress
01/12/2022HVAC and service water heating equipment MUZAFFAR JAMALenergy_progress
01/12/2022Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
01/12/2022HVAC insulation and sealing MUZAFFAR JAMALenergy_progress
Latest 25 of 28.
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Plumbing7
08/24/2026Q00336562-P5Request digital key ↗
08/24/2026Q00336562-P4Request digital key ↗
08/24/2026Q00336562-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION8
03/15/2023421735705Open ↗
03/14/2023421735705Open ↗
01/23/2023421735705Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
05/06/2021421735705Open ↗
10/01/2020421735705Open ↗
10/01/2020421735705Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
04/19/2022421960809Open ↗
04/23/2020421960809Open ↗
03/24/2020421960809Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/24/2021421735705Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
11/07/2022421735705Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/10/2023421735705Open ↗
▸BISZONING DIAGRAM1
03/24/2020421735705Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature13
08/26/2026Q00336562-P1Open ↗
08/26/2026Q00336562-P1Open ↗
08/26/2026Q00336562-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/26/2026Q00336562-P1Open ↗
08/25/2026Q00336562-P5Open ↗
08/25/2026Q00336562-P5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00336562-P4Open ↗
08/24/2026Q00336562-P3Open ↗
08/24/2026Q00336562-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/22/2020421735705Open ↗
05/04/2020421735705Open ↗
03/25/2020421735705Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment5
▸BISSEWER CONNECTION: DEP SD1 & SD21
03/27/2020421735705Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/09/2023421735705Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/09/2023421735705Open ↗
▸BISSPRINKLER SYSTEMS1
02/09/2023421735705Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
04/18/2023421735705Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
04/23/2020421960809Open ↗
03/25/2020421735705Open ↗
02/27/2020421735705Open ↗
▸BISSTREET TREE SIGNOFF1
04/19/2023421735705Open ↗
▸BISSTREET TREES SITE PLAN1
11/04/2022421735705Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/04/2020421735705Open ↗
03/25/2020421735705Open ↗
02/27/2020421735705Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/17/2023421735705Open ↗
12/24/2022421735705Open ↗
▸BISINTERIOR LIGHTING POWER1
02/09/2023421735705Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/24/2022421735705Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/09/2023421735705Open ↗
▸BISFENESTRATION AREAS1
02/09/2023421735705Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
02/09/2023421735705Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/09/2023421735705Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/11/2023421735705Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/09/2023421735705Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/09/2023421735705Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
02/09/2023421735705Open ↗
▸BISFENESTRATION AIR LEAKAGE1
02/09/2023421735705Open ↗
▸Inspections & Test Reports23
▸DOB NOWSOIL REPORT4
08/13/2026Q00336562-I1Open ↗
08/13/2026Q00336562-P7Open ↗
08/13/2026Q00336562-P6Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/17/2023421735705Open ↗
01/15/2023421735705Open ↗
12/24/2022421735705Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
04/23/2020421960809Open ↗
03/24/2020421960809Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
02/15/2023421735705Open ↗
02/15/2023421735705Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/09/2023421735705Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/09/2023421735705Open ↗
▸BISMASONRY1
02/09/2023421735705Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
03/27/2020421735705Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
02/09/2023421735705Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/10/2023421735705Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/25/2020421735705Open ↗
▸BISMECHANICAL SYSTEMS1
02/09/2023421735705Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/22/2020421735705Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
02/09/2023421735705Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/09/2023421735705Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00336562-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/16/2022421960809Open ↗
05/06/2021421735705Open ↗
10/01/2020421735705Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
04/23/2020421960809Open ↗
03/24/2020421960809Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
02/27/2020421735705Open ↗
▸BISCERTIFICATE OF OCCUPANCY1
11/04/2022421735705Open ↗
▸Cost, Insurance & Ownership1
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
05/06/2021421735705Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION9
04/10/2023421735705Open ↗
03/23/2023421735705Open ↗
03/10/2023421735705Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM4
05/06/2021421735705Open ↗
10/01/2020421735705Open ↗
10/01/2020421735705Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
04/23/2020421960809Open ↗
03/24/2020421960809Open ↗
▸BISEFILING COVER SHEET2
03/24/2020421960809Open ↗
02/27/2020421735705Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION3
05/22/2020421735705Open ↗
04/30/2020421960809Open ↗
04/30/2020421960809Open ↗
▸BISWOOD - METAL-PLATE-CONNECTED TRUSSES1
02/15/2023421735705Open ↗
▸BISLOCAL LAW - SUPPPORTING DOCUMENTATION1
03/25/2020421735705Open ↗
▸BISLOWEST FLOOR ELEVATION1
02/09/2023421735705Open ↗
▸BISMAINTENANCE INFORMATION1
02/09/2023421735705Open ↗
▸BISPERMANENT CERTIFICATE1
02/15/2023421735705Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
02/09/2023421735705Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
01/15/2023421735705Open ↗