Predominantly retail with other uses
HILLSIDE AVENUE
QUEENS · BIN 4624110
💬 Discuss this project
2023Year Built
2Stories
K4Building Class
R3-2Zoning
8,368 sfGross Floor Area
4Units
0 Open Violations
Predominantly retail with other uses · Owner of record: RAI KRUPA LLC · 5,075 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof40p · 4 filings · 20 docs
Floor 241p · 4 filings · 20 docs
Floor 154p · 7 filings · 20 docs
Cellar40p · 5 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOUN DESIGN CORP.105/26/2026
MOHDZUHAIR HUSSAINI212/09/2025
PHLA205/27/2025
LMW ENGINEERING GROUP LLC307/29/2024
ALL CITY ENGINEERING PC506/13/2024
M.S. SAVANI ARCHITECT, PC404/09/2024
JBA112/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING203/21/2026
M.S. SAVANI ARCHITECT,P.C.1003/21/2026
ARCASTLE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M I T BROTHERS CONSTRUCTIGeneral Contractor1707/08/2026
AMR CONTRACTING OF NY CORGeneral Contractor303/21/2026
HESPELER CORPGeneral Contractor303/21/2026
SOLAR PRO INCGeneral Contractor303/21/2026
RRP PLUMBING CORPPlumbing207/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/03/2026
STRUCTURE R US INCGeneral Contractor107/08/2026
M & M PIPING AND HEATINGPlumbing106/28/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
RRP PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL ENGINEERING6111312/09/2025
JUST CONSULTING ENGINEERI58651007/29/2024
CL ENGINEERING P.C.6781204/09/2024
WORLD DESIGN ARCHITECTURE9323112/18/2023
Building Lifecycle
All (161)Filed (18)Permit Issued (19)Signed Off (9)Violation (6)Inspection (21)Objection (58)Special Inspection (30)
09/08/2026
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01377224-I1
06/22/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
06/03/2026
Permit issued — Sign
Q01377224-I1-SG
05/26/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01377224-I1
01/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/26/2025
Permit issued — Plumbing
Q01330508-I1-PL
12/18/2025
Permit issued — General Construction
Q01330507-I1-GC
12/09/2025
Filed — Alteration
Q01330507-I1
12/09/2025
Filed — Alteration
NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, SCOPE OF WORK TO INCLUDE INSTALLATION OF NEW PLUMBING FIXTURES TO ACCOMODATE PROPOSED "DOCTORS OFFICE".
Q01330508-I1
12/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
William Shoard
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Shoard
08/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/09/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/11/2025
Permit issued — General Construction
Q01204700-I1-GC
06/04/2025
Permit issued — Plumbing
Q01204701-I1-PL
05/27/2025
Filed — Alteration
No change in use or occupancy under this application, scope of work to include interior renovation to existing first floor tenant space, new walls, finishes, equipment and mill-work counter, new type (1) exhaust hood and associated duct work.
Q01204700-I1
05/27/2025
Filed — Alteration
no change in use or occupancy under this application, scope of work to include new plumbing fixtures and minor gas cooking equipment.
Q01204701-I1
04/02/2025
Special inspection requirement — Final
William Shoard
04/02/2025
Special inspection requirement — Mechanical Systems
William Shoard
11/14/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK.
Q00978040-I1
10/22/2024
Signed off — Alteration
Mechanical design in conjunction with NB Q00659384. No change in use, egress, or occupancy.
Q00660189-I1
10/21/2024
Signed off — Alteration
THIS APPLICATION IS FILED TO FOR STRUCTURAL WORK IN CONJUNCTION WITH NB Q00659384
Q00668379-I1
10/17/2024
Signed off — Alteration
Sprinkler design in conjunction with NB Q00659384. No change in use, egress, or occupancy.
Q00660194-I1
10/17/2024
Signed off — Alteration
HEREWITH TO PROPOSE TEMPORARY 8' HIGH WOOD CONSTRUCTION FENCE. NO CHANGES IN OCCUPANCY, USE, GROUP OR EGRESS UNDER THIS APPLICATION.
Q00709957-I1
10/17/2024
Signed off — Alteration
Plumbing design in conjunction with NB Q00659384. No change in use, egress, or occupancy.
Q00660192-I1
10/15/2024
Signed off — Alteration
HEREWITH TO PROPOSE 15 LINEAR FEET CURB CUT.
Q00713641-I1
10/08/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/25/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/19/2024
Violation issued (ECB, closed)
Unknown
08/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/12/2024
Special inspection requirement — Masonry
XIAOJUN WANG
08/12/2024
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
08/12/2024
Special inspection requirement — Final
CALVIN TRAN
08/12/2024
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOJUN WANG
07/29/2024
Filed — Alteration
THIS APPLICATION IS FILED TO FOR STRUCTURAL WORK IN CONJUNCTION WITH NB Q00659384
Q00668379-P1
07/26/2024
Special inspection requirement — Final
CALVIN TRAN
07/26/2024
Special inspection requirement — Masonry
XIAOJUN WANG
07/26/2024
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOJUN WANG
07/26/2024
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
07/12/2024
Permit issued — Curb Cut
Q00713641-I1-CC
06/25/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/24/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOJUN WANG
06/24/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAOJUN WANG
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
06/13/2024
Filed — Alteration
Plumbing design in conjunction with NB Q00659384. No change in use, egress, or occupancy.
Q00660192-P2
06/03/2024
Filed — Alteration
Plumbing design in conjunction with NB Q00659384. No change in use, egress, or occupancy.
Q00660192-P1
05/30/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/07/2024
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
05/07/2024
Special inspection requirement — Maintenance information
XIAOJUN WANG
05/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIAOJUN WANG
05/07/2024
Special inspection requirement — Lighting controls
XIAOJUN WANG
05/07/2024
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC06/03/2026
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/26/2025
DOB NOWGeneral ConstructionPermit IssuedHESPELER CORP12/18/2025
DOB NOWGeneral ConstructionPermit IssuedAMR CONTRACTING OF NY COR06/11/2025
DOB NOWPlumbingPermit IssuedM & M PIPING AND HEATING06/04/2025
DOB NOWCurb CutSigned-offM I T BROTHERS CONSTRUCTI07/12/2024
DOB NOWPlumbingSigned-offRRP PLUMBING CORP04/09/2024
DOB NOWSolarSigned-offSOLAR PRO INC02/16/2024
DOB NOWMechanical SystemsSigned-offM I T BROTHERS CONSTRUCTI10/06/2023
DOB NOWStructuralSigned-offM I T BROTHERS CONSTRUCTI09/20/2023
DOB NOWConstruction FenceSigned-offM I T BROTHERS CONSTRUCTI09/12/2023
DOB NOWGeneral ConstructionPermit IssuedM I T BROTHERS CONSTRUCTI09/11/2023
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.06/16/2023
DOB NOWPlumbingSigned-offRRP PLUMBING CORP06/16/2023
DOB NOWGeneral ConstructionPermit IssuedM I T BROTHERS CONSTRUCTI03/23/2023
DOB NOWConstruction FenceSigned-offM I T BROTHERS CONSTRUCTI03/23/2023
DOB NOWGeneral ConstructionPermit IssuedM I T BROTHERS CONSTRUCTI02/15/2023
DOB NOWEarth WorkSigned-offSTRUCTURE R US INC10/24/2022
DOB NOWConstruction FenceSigned-offM I T BROTHERS CONSTRUCTI10/04/2022
1 project · most recent 05/27/2025
Ventilation Systems
FiledStatusContractorScope
05/27/2025Permit IssuedAMR CONTRACTING OF NY CORVentilation Systems
1 project · most recent 05/27/2025
FiledStatusContractorScope
05/27/2025——11 heads
2 projects · most recent 12/09/2025
Water/Sanitary Gas
FiledStatusContractorScope
12/09/2025Signed-offA M B MECHANICAL INCWater/Sanitary
05/27/2025Permit IssuedM & M PIPING AND HEATINGGas, Water/Sanitary
6 projects · most recent 03/14/2026
General Wiring
FiledStatusContractorScope
03/14/2026CompleteJONG HYUN KIM—
12/21/2025CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
06/19/2025Permit IssuedA ELECTRICAL MAIN SVC INCGeneral Wiring
09/20/2024CompleteVILLAGE ELECTL CONTRS INCGeneral Wiring
12/11/2023CompleteVILLAGE ELECTL CONTRS INC—
11/22/2023CompleteJUN SAFETY ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
06/22/2026Pass-Final Sign Permit InspectionPassView ↗
01/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/09/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/08/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/25/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/25/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/02/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
12/09/2025Tenant Protection Plan ComplianceWilliam Shoardspecial
12/09/2025Fire-Resistant Penetrations and JointsWilliam Shoardspecial
04/02/2025Mechanical SystemsWilliam Shoardspecial
04/02/2025FinalWilliam Shoardprogress
08/12/2024Structural Steel - High Strength BoltingXIAOJUN WANGspecial
08/12/2024FinalCALVIN TRANprogress
08/12/2024Structural Steel - DetailsXIAOJUN WANGspecial
08/12/2024MasonryXIAOJUN WANGspecial
07/26/2024Structural Steel - High Strength BoltingXIAOJUN WANGspecial
07/26/2024FinalCALVIN TRANprogress
07/26/2024MasonryXIAOJUN WANGspecial
07/26/2024Structural Steel - DetailsXIAOJUN WANGspecial
06/24/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOJUN WANGspecial
06/24/2024Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
06/24/2024Energy Code Compliance InspectionsXIAOJUN WANGprogress
05/07/2024Insulation placement and R valuesXIAOJUN WANGenergy_progress
05/07/2024Lighting in dwelling unitsXIAOJUN WANGenergy_progress
05/07/2024HVAC-R and service water heating system controlsXIAOJUN WANGenergy_progress
05/07/2024Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
05/07/2024HVAC-R and service water piping design and insulationXIAOJUN WANGenergy_progress
05/07/2024Fenestration areasXIAOJUN WANGenergy_progress
05/07/2024Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
05/07/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
05/07/2024Mastic and Intumescent Fire-resistant CoatingsCHRISTIAN LOZADAspecial
05/07/2024Exterior Insulation and Finish Systems (EIFS)XIAOJUN WANGspecial
Latest 25 of 74.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/26/2026Q00660189-I1Request digital key ↗
08/26/2026Q00668379-P1Request digital key ↗
08/26/2026Q00709957-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION3
01/27/2025440712980Open ↗
06/06/2024440712980Open ↗
05/26/2022440712980Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation3
06/12/2024440712980Open ↗
05/16/2024440712980Open ↗
05/16/2024440712980Open ↗
▸BISDOT- 410 PERMITS FOR ADA RAMPS AT CORNERS1
04/02/2025440712980Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
04/16/2025440712980Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026Q00659384-I1Open ↗
08/13/2026Q00659384-P2Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/14/2026Q00659384-I1Open ↗
08/13/2026Q00659384-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026Q00659384-I1Open ↗
08/13/2026Q00659384-P2Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/27/2022440712980Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00659384-I1Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/26/2026Q00660189-I1Open ↗
08/26/2026Q00668379-I1Open ↗
08/23/2026Q00659384-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q00668379-P1Open ↗
08/31/2026Q01204700-I1Open ↗
08/29/2026Q00668379-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026Q00668379-P1Open ↗
09/01/2026Q01330508-I1Open ↗
08/31/2026Q01204700-I1Open ↗
Showing 3 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/26/2022440712980Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/26/2022440712980Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/14/2026Q00659384-I1Open ↗
08/13/2026Q00659384-P2Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST2
07/12/2022440712980Open ↗
06/27/2022440712980Open ↗
▸DOB NOWStreet Tree Checklist2
08/14/2026Q00659384-I1Open ↗
08/13/2026Q00659384-P2Open ↗
▸BIS1 STREET TREE REMOVAL BY DPR1
04/02/2025440712980Open ↗
▸BISSTREET TREE SIGNOFF1
03/28/2025440712980Open ↗
▸BISSTREET TREES SITE PLAN1
02/03/2025440712980Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00659384-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00659384-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00659384-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWOER: Notice to Proceed7
08/14/2026Q00659384-I1Open ↗
08/13/2026Q01204700-I1Open ↗
08/13/2026Q01204701-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/13/2026Q01204700-I1Open ↗
08/13/2026Q01204701-I1Open ↗
08/13/2026Q00668379-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
03/25/2025440712980Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
05/26/2022440712980Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00659384-I1Open ↗
08/13/2026Q00660189-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00660189-I1Open ↗
▸Inspections & Test Reports1
▸BISBPP: FIELD INSPECTION1
03/31/2025440712980Open ↗
▸Approvals, Objections & Sign-offs3
▸BISNEW CC APPROVAL1
04/02/2025440712980Open ↗
▸BISBPP: FINAL SIGNOFF1
04/16/2025440712980Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00978040-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
04/16/2025440712980Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
04/16/2025440712980Open ↗
02/03/2025440712980Open ↗
06/10/2024440712980Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/26/2022440712980Open ↗
▸Other Documents21
▸BISBPP - SUPPORTING DOCUMENTATION6
04/02/2025440712980Open ↗
03/31/2025440712980Open ↗
02/03/2025440712980Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial2
08/14/2026Q00659384-I1Open ↗
08/13/2026Q00659384-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026Q00659384-I1Open ↗
08/13/2026Q00659384-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/14/2026Q00659384-I1Open ↗
08/13/2026Q00659384-P2Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
03/31/2025440712980Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
03/31/2025440712980Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/27/2022440712980Open ↗
▸BISDOT COMPLIANCES FOR PEDRAMP AT CORNER1
04/02/2025440712980Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
03/31/2025440712980Open ↗
▸BISRP 6021
06/27/2022440712980Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00659384-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00667464-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00659384-I1Open ↗